Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Washington was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Civil Engineering & Site Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 14 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This subcontract for Civil Engineering and Site Design supports prime contractors on facility projects for the University of Washington. The scope of work focuses on comprehensive site planning, grading, and utility design, specifically including the creation of site clearing and grubbing plans, the removal of mature trees, and the demolition of existing paved surfaces and curbs. Additionally, the contractor is responsible for designing perimeter drainage systems utilizing perforated drain pipes. The final deliverables for this engagement include a detailed site plan, a grading plan, and complete drainage specifications. Interested parties should note that the response deadline for this opportunity is September 15, 2026, and the work falls under NAICS code 541330.

General Info

Civil engineering subcontract for University of Washington site design; deadline September 15, 2026.

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of 205860.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

205860 wǝɫǝbʔaltxʷ Intellectual House Phase 2 - Request For Qualifications (RFQ)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUniversity of Washington
ContactsNo contacts available
OfficeN/A
Organization / AgencyUniversity of Washington
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site planning, grading, and utility design for prime contractors on University of Washington facility projects. Designs site clearing and grubbing plans, removal of mature trees, demolition of paved surfaces/curbs, and perimeter drainage systems using perforated drain pipes. Delivers site plan, grading plan, and drainage specifications.

More opportunities from University of Washington

Same awarding agency

New
SLED
209276 RFQ for Design Build Services - Padelford, Triangle, Central Parking Garage Renewal
Solicitation # university-of-washington-1255920
The University of Washington is soliciting Statements of Qualifications from design-build teams for the Padelford, Triangle, and Central Plaza Parking Garage Renewal project. This initiative aims to extend the useful life of these three facilities by ten years through a comprehensive scope of structural repairs, including spalling concrete remediation, crack injections, new traffic coatings, waterproofing, and the replacement of expansion joints. Additionally, the project includes upgrades to lighting, conveyance, ADA access, and sprinkler systems. The work is scheduled to be executed across four summer seasons between 2027 and 2030, with a target budget of 4.6 million dollars to start and 15 million dollars overall, exclusive of Washington State sales tax. The procurement follows the Design-Build alternative public works contracting procedure under chapter 39.10 RCW, utilizing a single progressive design-build contract that begins with a not-to-exceed preliminary agreement. Selection is based on qualifications, with the University shortlisting up to three finalists based on their proposed team, firm philosophy, innovative solutions, and safety records. Finalists will be evaluated on their management plans, ability to meet time and budget constraints, and a price factor. Required submission materials include a one-page cover letter, an A3 format SOQ, and an appendix containing bonding and insurance letters, a safety and health statement, team resumes, and two reference letters. The project also mandates a minimum 15 percent apprentice labor utilization and requires monthly payment reporting through the Access Equity system.

POSTED

about 24 hours ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS