Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Washington was posted on February 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Civil Engineering & Site Infrastructure Planning

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 13 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The University of Washington is seeking a subcontractor for Civil Engineering and Site Infrastructure Planning. The scope of work involves providing comprehensive civil engineering design services to support a master plan, specifically focusing on site grading, stormwater management, utilities, access roads, and parking layout. This opportunity was posted on February 7, 2024, with a response deadline of March 6, 2024. The project falls under NAICS code 541330, and interested parties can find further information through the Washington Department of Enterprise Services vendor portal.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of RFQ-24-0206-PLD.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Architectural Consulting Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUniversity of Washington
ContactsNo contacts available
OfficeN/A
Organization / AgencyUniversity of Washington
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide civil engineering design for site grading, stormwater management, utilities, access roads, and parking layout as part of the master plan.

More opportunities from University of Washington

Same awarding agency

New
SLED
209276 RFQ for Design Build Services - Padelford, Triangle, Central Parking Garage Renewal
Solicitation # university-of-washington-1255920
The University of Washington is soliciting Statements of Qualifications from design-build teams for the Padelford, Triangle, and Central Plaza Parking Garage Renewal project. This initiative aims to extend the useful life of these three facilities by ten years through a comprehensive scope of structural repairs, including spalling concrete remediation, crack injections, new traffic coatings, waterproofing, and the replacement of expansion joints. Additionally, the project includes upgrades to lighting, conveyance, ADA access, and sprinkler systems. The work is scheduled to be executed across four summer seasons between 2027 and 2030, with a target budget of 4.6 million dollars to start and 15 million dollars overall, exclusive of Washington State sales tax. The procurement follows the Design-Build alternative public works contracting procedure under chapter 39.10 RCW, utilizing a single progressive design-build contract that begins with a not-to-exceed preliminary agreement. Selection is based on qualifications, with the University shortlisting up to three finalists based on their proposed team, firm philosophy, innovative solutions, and safety records. Finalists will be evaluated on their management plans, ability to meet time and budget constraints, and a price factor. Required submission materials include a one-page cover letter, an A3 format SOQ, and an appendix containing bonding and insurance letters, a safety and health statement, team resumes, and two reference letters. The project also mandates a minimum 15 percent apprentice labor utilization and requires monthly payment reporting through the Access Equity system.

POSTED

about 22 hours ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS