Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Civil Site Work and Paving

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Martinez, CA, 94553, USA

Set-Aside

NONE

Documents

This scope was carved out of 100052.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

North Orinda Sewer Renovations, Phase 9

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 23 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 5 documents on the prime contractFrom North Orinda Sewer Renovations, Phase 9
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Contra Costa Sanitary District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site grading and pavement management for prime contractors on civil works projects. Executes pavement management and site preparation across Tappan Ln, La Cintilla Ln, and Wilson Road using asphalt or concrete paving materials. Complies with California Building Code (CBC) and local agency regulations. Delivers completed paved surfaces and graded sites.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project managed by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29 from Coyote Creek Bridge to Diener Drive/Road 543 and Route 53 at Route 29, involving cold planing of AC pavement and the installation of Rubberized Hot Mix Asphalt Gap Graded overlay and Hot Mix Asphalt Type A surfacing. The project has an estimated cost of 14,400,000 USD, with bidding requirements specifying a bidder's security of at least 10 percent and a performance timeline between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and specific Special Provisions, including strict Buy America/Build America requirements and environmental mandates. Contractors must ensure equipment is pressure washed to prevent invasive species and provide environmental product declarations for concrete and asphalt. Key personnel requirements include a safety representative with specific certifications from the Board of Certified Safety Professionals or the National Association of Safety Professionals, as well as valid first aid and CPR certifications. Job site activities must commence within 55 days of contract approval, and all work must adhere to local codes, MASH Test Level 3 safety standards, and RWQCB water quality objectives.
California Department of Transportation

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → Central Contra Costa Sanitary District

Same awarding agency

NAICS: 237130
SLED
EV Charging Stations on Central San Properties
Solicitation # 2025-033
The Central Contra Costa Sanitary District is initiating a project to design and install electric vehicle charging stations at its facilities as part of its Fleet Electrification Strategic Plan. This initiative supports the agency's net zero goal and ensures compliance with the California Air Resource Board's Advanced Fleets Regulation and Governor's Executive Order N-79-20. The project involves granting easements to PG&E to allow for the installation and maintenance of electric vehicle service connections and related infrastructure. Initial installations are scheduled for the Moraga and San Ramon Pump Stations, the Collection System Operations facility, and the wastewater treatment plant located within Contra Costa County. To streamline the implementation of this plan, a resolution has been proposed to delegate authority to the General Manager or a designee to execute these and future grants of easement for charging stations that will be used exclusively by Central San vehicles. District Counsel has reviewed and approved the easement drafts and the delegation of authority. The project has received a Notice of Exemption under CEQA guidelines, indicating that the work involves minor alterations with no significant environmental impact. All work must adhere to applicable federal, state, and local laws, including specific environmental considerations for protecting trees and riparian areas.
Power and Communication Line and Related Structures Construction

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Wet Weather Basin Improvements, Phase 1, DP 100022
Solicitation # 100022
The Central Contra Costa Sanitary District has awarded a construction contract for the Wet Weather Basin Improvements, Phase 1 (District Project 100022) to W.R. Forde Associates, Inc. for 357,000 dollars. The project is located at the Treatment Plant in Martinez, California, and focuses on five wet weather storage basins: Basin A North, Basin A South, Basin B, Basin C, and Basin D. The primary objectives are to protect the Filter Water Lift Station during wet weather bypass events, restore storage capacity in Basin A North, increase overall basin functionality, and improve safety for operations and maintenance staff. The scope of work includes constructing a 6-foot-tall berm around the Filter Water Lift Station, replacing the access road, improving drainage, repairing a slope failure, and relocating light poles. Construction is scheduled to take place during the dry weather season from May to October 2026. The project is exempt from the California Environmental Quality Act under Section 15301. Contract administration and general inspection will be managed by Central San staff or on-call services, with Haley and Aldrich providing geotechnical inspection and material testing. Total project costs include the construction award, a 90,000 dollar contingency, construction management fees, and prebid engineering expenditures.
Other Heavy and Civil Engineering Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS