Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Texas was posted on July 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Civil/Stormwater Design Engineering

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Waco in Texas is seeking a subcontractor for Civil/Stormwater Design Engineering services. The primary objective of this contract is the development of detailed civil designs for storm drain improvements, which encompasses pipe sizing, the strategic placement of inlets, the design of detention basins, and the seamless integration of these elements with existing infrastructure. This opportunity is categorized under NAICS code 541330. The solicitation was posted on July 7, 2025, and interested parties must submit their responses by the deadline of September 9, 2025. Further details regarding the procurement process can be accessed through the Texas SmartBuy portal.

General Info

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of RFQ 2025-051.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Storm Drainage Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Waco
ContactsNo contacts available
OfficeN/A
Organization / AgencyTexas → City of Waco
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop detailed civil designs for storm drain improvements including pipe sizing, inlet placement, detention basins, and integration with existing systems.

More opportunities from Texas → City of Waco

Same awarding agency

NAICS: 237990
SLED
Old McGregor Ground Storage Tank Improvements
Solicitation # 2026-045
The City of Waco is soliciting bids for the Old McGregor Ground Storage Tank Improvements project, identified as RFB 2026-045. The scope of work includes providing all labor, materials, and equipment to fabricate, construct, inspect, and test a new 5.0 MG ground storage tank, along with the installation of new piping, valves, and appurtenances. Additionally, the project requires the repair of an existing 5.0 MG ground storage tank at the Old McGregor Pump Station. All tank construction must adhere to AWWA D110 Type III concrete standards. The project also encompasses site improvements, demolition, yard piping, and the implementation of safety and environmental plans, including stormwater pollution prevention, trench safety, and confined space protocols. Contractors must undergo a mandatory prequalification process on a pass/fail basis, requiring a demonstrated history of completing at least three similar projects of at least 2 MG capacity within the last ten years, with at least one project completed in Texas by the firm's own employees. Bids are due by October 29, 2026, at 2:00 p.m. Central Time, and must be submitted via the City's e-Procurement portal or in a sealed envelope. The contract is governed by the EJCDC 2007 edition and requires performance and payment bonds, with bonds and insurance capped at 2.5% of the total base bid. The solicitation includes several additive and deductive alternates based on different Notice to Proceed quarters in 2027.
Other Heavy and Civil Engineering Construction

POSTED

3 months ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS