Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 11, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cmgc - Interstate 40 (I-40) Colorado Bridge Replacement

Closed
080R38CMState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Documents

15

080R38CM-CMGC-RFQ-Form H: Cost Proposal

DOCX, High priority: read this firstrfq
High

Addendum No. 6 - RFQ 080R38CM: I-40 Colorado Bridge Replacement

PDF, High priority: read this firstamendment
High

Form G: Proposer SOQ Certification - I-40 Colorado River Bridge Replacement Project

DOCX, High priority: read this firstrfq-form
High

I-40 Colorado Bridge Replacement CMGC RFQ

PDF, High priority: read this firstrfq
High

I-40 Colorado River Bridge Replacement Project - RFQ Forms

DOCX, High priority: read this firstrfq
High

Preliminary Structures Construction Staging Plans - Colorado River Bridge at Topock

PDF, High priority: read this firstspecifications
High

Preliminary Structures General Plans - Colorado River Bridge at Topock

PDF, High priority: read this firstspecifications
High

Preliminary Utility Plans

PDF, High priority: read this firstspecifications
High

RFQ 080R38CM Addendum No. 1 - I-40 Colorado Bridge Replacement

PDF, High priority: read this firstamendment
High

RFQ 080R38CM Addendum No. 2 - I-40 Colorado Bridge Replacement

PDF, High priority: read this firstamendment
High

RFQ 080R38CM Addendum No. 3 - I-40 Colorado Bridge Replacement

PDF, High priority: read this firstamendment
High

RFQ 080R38CM Addendum No. 4 - I-40 Colorado Bridge Replacement

PDF, High priority: read this firstamendment
High

RFQ 080R38CM Addendum No. 5 - I-40 Colorado Bridge Replacement

PDF, High priority: read this firstamendment
High

I-40 Colorado River Bridge Replacement Project Final EIR/EA

PDF, Low priorityenvironmental-impact-report
Low

Project Report - Colorado River Bridge Replacement (I-40)

PDF, Low priorityproject-report
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

Solicitation

Notice updated

NAICS code changed from 236220 to 484210. The notice description changed.

Notice updated

The notice description changed.

Notice updated

NAICS code changed from 484210 to 237990. The notice description changed.

Notice updated

The notice description changed.

Notice updated

NAICS code changed from 237990 to 237310. The notice description changed.

Notice updated

NAICS code changed from 237310 to 237990. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Denetia Floyd-Smith

Full Description

Show more
1.4 Project Opportunity The Project is located on Route I-40, in San Bernardino County Near the City Of Needles California and in Mojave County Near the City Of Topock Arizona at CA Br. No.54-0415, AZ Br. No. 957 from R153.9 to R154.7 on the California side and within Arizona from PM 0.0 to 0.6. A more detailed description of the Project is contained in Appendix A.
The estimated cost of this CMGC Project (in 2026 US dollars) is $99,232,000 for construction capital and $8,000,000 for Right of Way capital (including utility relocation).
2 - Procurement Schedule Final Date for Receipt of Proposers Questions - 4/9/2024 SOQ Due Date for Electronic and Hardcopy Submittal - 4/23/2024 Notice of Short List - 5/27/2024 Proposer Interviews - 6/3/2024 Anticipated Ranking Determination - 6/11/2024
4.2 Quantities, Due Date, Time, and Location: The original and an electronic submittal of the SOQ shall be provided. The Original shall be identified on its front cover, in the upper right-hand comer as ;Original;
All SOQs shall be received by 3 p.m. Pacific Time on the day specified in Section 2.- Procurement Schedule, unless modified by Addenda.
For hand-delivered SOQ submittals to Sacramento, call Charlie Sparkman at +1 (555) 000-0000 to prearrange the day and time for SOQ hand delivery.
Please refer to the RFQ for goal requirement and attachments for licensing requirements for this contract.
Unfortunately, the Department does not have a plan holders list of available proposers, nor does it have a way of identifying companies or entities that may have downloaded the project documents for teaming purposes. It is the responsibility of the consultants/subs/vendors to identify teams that may be submitting an Statement of Qualification¿s.
The Department will allow the use of text with font size smaller than 12-point for only charts, tables, exhibits, and other illustrative and graphical information.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Modify the existing traffic control signals.
Solicitation # 07-381404
The California Department of Transportation is soliciting bids for Contract 07-381404 to modify existing traffic control signals on State Highway Route 213 at Del Amo Boulevard in the City of Torrance, Los Angeles County. The project has an estimated cost of 780,000 dollars and requires bids to be submitted on a unit price basis by November 17, 2026. The scope of work includes modifying signal and lighting systems, implementing temporary signal systems and pedestrian access routes, and installing thermoplastic crosswalks and pavement markings with enhanced wet night visibility. Contractors must also submit a Lead Compliance Plan and adhere to specific technical standards for electrical systems and roadside signs. Performance must begin within 180 days of contract approval, with a 72-hour notice required before starting job site activities. The contract mandates compliance with Buy America requirements for certain department-furnished materials, such as traffic controller cabinets and camera assemblies, and requires adherence to California prevailing wage rates. Quality assurance involves source inspections for equipment enclosures and functional testing of cameras in the presence of an Engineer. Administrative requirements include submitting payment information through the department's prompt payment monitoring system, with strict payment timelines for subcontractors and material suppliers.
Highway, Street, and Bridge Construction

POSTED

about 22 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS