This Solicitation opportunity from Department Of State was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CMR grounds safety improvement project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The U.S. Embassy Banjul is soliciting competitive quotations for a grounds safety improvement project at the CMR compound, involving the full renovation of walkways, stairways, patio, and gazebo areas. The work requires complete removal of existing pavers, stones, and sunken sections, with replacement using non-slip floor tiles, installation of ABA-compliant handrails, and repair of the storm drainage system to meet U.S. and local safety standards. All work must be performed under a fixed-price contract and completed within 30 days of the Notice to Proceed, with strict adherence to ASTM, International Building Code, National Electrical Code, OBO Design Standards, and USACE guidelines, applying the more stringent standard where conflicts arise. The contractor must provide comprehensive documentation including a Quality Management Plan, Project Safety Plan, detailed schedule, architectural drawings, final renderings, and a Release of Claims Certificate, all of which become U.S. government property upon acceptance. The contract requires compliance with a range of Federal Acquisition Regulation clauses including those governing system for award management, personal identity verification, combating trafficking in persons, employment eligibility, minimum wage requirements, workers’ compensation, privacy training, and special provisions for personnel working in diplomatic missions overseas. Contractors must submit personal data for embassy security clearance within 45 days of notice to proceed and comply with Department of State identification card policies. All personnel must be trained and certified, with a designated competent person overseeing safety, including proper PPE usage and protocols for high-risk tasks requiring two certified workers. Proposals must be submitted in two separate packages—technical and cost—and are subject to evaluation based on technical acceptability and lowest price, with no trade-off analysis indicated. Work will be performed solely at the U.S. Embassy Banjul compound in The Gambia, and all materials and processes must conform to hazardous substance handling, labeling, and documentation requirements including SDS sheets. The solicitation, numbered PR15756088, was posted on June 3, 2026, with responses due by June 24, 2026, and no set-aside status is specified, making it open to all responsible offerors.
General Info
Agency
NAICS
Place of Performance
Banjul, GM-B, GMBSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The US Embassy Banjul wishes to solicit bids for repairing the walkways, stairways, patio, and gazebo in the CMR compound. The repairs will include the removal of all existing pavers, stones, and sunken areas in the walkways and stairways, followed by their replacement with non-slip floor tiles. Additionally, the project will include repairing the storm drainage system and meeting safety requirements by installing handrails as per the attached scope of work (SOW). U.S. Government intends to award a contract to the responsible company submitting a technically acceptable quotation at the lowest price.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
