This Solicitation opportunity from Florida was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Cocoa Police Department HVAC Renovations
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Cocoa is seeking a contractor for the removal and replacement of three Split System DX air conditioning units at the Cocoa Police Department. The selected contractor is responsible for providing all labor, materials, and equipment necessary to complete the project, including the disposal of old units per EPA regulations, installation of new units, and all associated electrical, controls, and HVAC work. Key requirements include integrating the new units with the building automation system, performing testing and balancing to manufacturer specifications, and providing all necessary warranty documentation and as-built information upon completion. All work must be performed in accordance with the City of Cocoa's codes and ordinances, and the contractor is responsible for obtaining all required permits. Bidders are expected to examine the job site prior to submission to ensure their pricing covers all necessary work for a completed project. Following the notice of award, the contractor must provide a detailed work schedule. This solicitation, numbered city-of-cocoa-B-26-12-COC-2026, has a response deadline of September 4, 2026.
General Info
Agency
NAICS
Place of Performance
Not specifiedSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The selected contractor shall be responsible for, at a minimum, the following: • Removal and proper disposal of three (3) existing AC units, including disconnection of associated electrical, controls, and refrigerant lines in accordance with applicable codes (e.g., EPA refrigerant recovery requirements). • Furnishing and installing three (3) new AC units of appropriate capacity to match or improve upon existing building load requirements. • Electrical work including disconnects, wiring, and connections necessary to power the new units, brough up to current code as required. • Controls work including integration of new units with the building automation/control system (BAS), thermostats, or standalone controls as applicable. • HVAC work including ductwork modifications/connections, curb adapters (if needed), refrigerant line sets, condensate drainage, and startup/commissioning of each unit. • Coordination of any required structural support modifications for new equipment (if unit dimensions/weights differ from existing). • Testing, balancing and verification that each unit is operating to manufacture specifications. • Cleanup and removal of all debris, packaging, and old equipment from the site upon completion. • Provision of warranty documentation, equipment manuals, and as-built information upon project completion.
All work shall be constructed according to the Construction Plans and are made part of the contract by reference.
The Contractor shall construct the project per: 1. The jurisdiction for the project site is the City of Cocoa, Florida. All work shall be permitted and undertaken in accordance with applicable codes and ordinances. 2. Prime contractor is assumed to be familiar with all general conditions/contract requirements associated with the contract between owner and contractor as they apply to the work noted on the detailed specifications, attached herein as Exhibits A, B and C. Prime contractor shall transfer all such requirements to all subcontractors. 3. All contractors shall examine job site prior to submission of a bid to observe all visible existing conditions. submission of bid will be taken to confirm familiarity with conditions of the work, so the bid price includes all work necessary to provide a completed, ready-to-occupied project. 4. Contractor shall obtain all permits required to undertake the work unless noted otherwise. 5. Prior to receiving a notice-to-proceed, the owner will file a notice-of-commencement with appropriate authority. 6. The contractor shall deliver a work schedule immediately after receiving a notice of award showing all tasks and completion dates. 7. The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
