Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Commercial Interior Fit-Out

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 6000-27-084.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

KSU - Design-Build Services for Project No. 6000-27-084, Village Residential Dining (North Campus)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Kennesaw State University
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs interior reconfiguration and adaptive reuse for prime contractors on Kennesaw State University projects. Converts existing office and lounge areas into front-of-house dining seating. Installs new partitions, flooring, and ceilings while ensuring ADA accessibility. Delivers finished interior spaces ready for occupancy.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project scope includes site preparation, stormwater mitigation via an infiltration pond, the purchase and erection of the steel building, installation of a concrete slab, underground utilities, a dry pipe fire suppression system, and the installation of desiccant dehumidifying equipment. Additionally, the facility must include a solar-ready roof zone and comply with UFC, NFPA, and IBC standards. The estimated project magnitude is between 1 million and 5 million dollars, with a statutory cost limit of 5 million dollars. This Firm Fixed Price task order will be awarded based on a balanced evaluation of technical capability and price. The successful contractor must commence work within 10 calendar days of the notice to proceed and achieve full completion within 365 calendar days. Key contractual requirements include the provision of performance and payment bonds for awards exceeding 150,000 dollars, adherence to Davis-Bacon prevailing wage rates for Pierce County, and compliance with the Buy American Act for fire alarm components. Liquidated damages are established at 576.63 dollars for the first day and 427.99 dollars per day thereafter. All invoicing must be processed through the Wide Area Workflow system.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a Membrane Bioreactor system, headworks, UV disinfection, and SCADA instrumentation; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. The total duration for the project is 915 calendar days, with a requirement to maintain existing plant services and regulatory compliance throughout the construction process. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Bids are due by October 28, 2026, following a mandatory pre-bid meeting on October 5, 2026. Subcontractors must agree to the standard Overaa agreement, provide a 100 percent performance and labor bond if requested, and utilize the Textura electronic invoicing system. The prime contractor is signatory to both Carpenters and Laborers Union Collective Bargaining Agreements.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 14 days
View Details

More opportunities from Georgia → Kennesaw State University

Same awarding agency

NAICS: 236220
New
SLED
KSU - Design-Build Services for Project No. 6000-27-084, Village Residential Dining (North Campus)
Solicitation # 6000-27-084
Kennesaw State University, on behalf of the Kennesaw State University Foundation, is soliciting statements of qualifications for design-build services for Project No. 6000-27-084, the Village Residential Dining (North Campus) in Marietta, Georgia. The project involves the renovation and adaptive reuse of approximately 12,500 square feet of existing space within University Village to create a new campus dining facility. This includes 10,500 square feet for programmable dining and support functions, encompassing front-of-house seating and back-of-house operations such as food production, storage, and dish return, as well as exterior site improvements for pedestrian circulation, parking, and drainage. The estimated construction cost is 4.9 million dollars, with services anticipated to commence in December 2026 and reach completion by June 2028 for occupancy by Fall 2028. The selection process is a multi-step evaluation beginning with Statements of Qualifications, followed by project proposals and interviews for qualified finalists. Initial evaluation is weighted toward the firm's relevant project experience and qualifications (45%) and firm stability (25%). Finalists are assessed on their project team's experience (50%), proposed management plan (25%), and team communications (25%). The successful design-builder must provide comprehensive architectural, engineering, and construction services while adhering to USG design standards and Board of Regents requirements. Mandatory requirements for offerors include a valid Georgia General Contractor's License, registration to do business in Georgia, and bonding capacity equal to or greater than 150 percent of the actual contract. Submissions must be uploaded in PDF format to the university's Filedrop website by November 10, 2026.
Commercial and Institutional Building Construction

POSTED

about 21 hours ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS