Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Texas was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete and Site Work for Gate Foundations

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
The WH Ford RTC Fueling System Repairs project is a design-build effort located in Greenville, Kentucky, managed by the US Army Corps of Engineers, Omaha District. The scope of work involves comprehensive upgrades to the fueling system, including upgrading tank Automated Tank Gauging (ATG), repairing dispenser and offload concrete, installing Emergency Fuel Shut-Off (EFSO) systems, and mounting leak detector probes on two diesel aboveground storage tanks. Additional requirements include replacing canopy and fuel pipe coatings, installing splash blocks, replacing roof penetration boot seals, providing dead man controls for truck loading, and modifying tank access platforms. The project also requires a comprehensive design signed by a licensed professional structural engineer, field surveys, and geotechnical investigations. This firm fixed-price contract has a period of performance of 410 calendar days, with a final delivery date of June 18, 2027. Proposals are evaluated using the Lowest Price Technically Acceptable (LPTA) method, focusing on specialized experience, a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases, and a well-defined technical approach. The project must adhere to strict quality control standards, including the Three Phases of Control, and comply with Davis-Bacon Act wage determinations and various federal cybersecurity and accessibility guidelines. There is no set-aside status specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 237120
New
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Hammerman Area of Gunpowder Falls State Park in Middle River, Baltimore County, Maryland. The contractor is responsible for providing all labor, equipment, and materials to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards, and replacing them with new systems. Key deliverables include the installation of new above-ground storage tanks, concrete pads, side-mount dispensers, and the provision of temporary fuel tanks (500-gallon gasoline and 250-gallon diesel) for the duration of the project. All work must adhere to Maryland Department of the Environment regulations, NFPA 30, 30A, and 78 fire safety standards, and API standards 650, 620, and 1604. This is a Small Business Reserve Procurement, and the award is limited to certified small businesses. The procurement establishes participation goals of 15% for Minority Business Enterprises (MBE) and 2% for Veteran-Owned Small Business Enterprises (VSBE). The contract will be awarded to the responsible bidder who submits the lowest responsive total bid. Required documentation for the bid includes a bid bond, MBE and VSBE utilization affidavits, and a comprehensive list of all anticipated subcontractors. Final project acceptance is contingent upon the approval of the Facility Manager and DNR Project Engineer, and requires the submission of an approved electrical inspection certificate and a disposal manifest for tanks and contaminated soils.

POSTED

about 15 hours ago

DEADLINE

in 26 days
NAICS: 237120
New
SLED
27-006 Gas Utility Installer
Solicitation # 27-006
The City of Commerce is seeking a gas utility installer for a one-year contract, with options to renew annually for up to three additional years. The scope of work focuses on the installation of gas mains using directional boring, specifically including 3-inch and 4-inch polyethylene gas mains and 3-inch tap, stop, or bottom out steel tie-ins. This is a solicitation for a SLED organization in Georgia, and there is no specified set-aside status for this opportunity. Proposals will be evaluated by a committee based on cost (40 points), proposal completeness (20 points), quality of previous similar projects (20 points), project understanding (15 points), and the ability to meet the timeline (5 points). The City reserves the right to select the response that is in its best interest. Payment is processed 30 days after the completion of construction and successful testing of all installed products, subject to available funds. Contractors must provide a bid bond of at least 5% and a performance bond equal to 100% of the construction contract amount upon completion. Required insurance includes general liability covering $1,000,000 per incident and Georgia-mandated workman's compensation. Additionally, the successful vendor must provide operator qualifications, a drug and alcohol testing plan, and submit PHMSA Drug and Alcohol Testing Data to the City on a quarterly basis. Submissions must be delivered in a sealed package by December 21, 2026.
City of Commerce

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 237120
New
SLED
Restoration Projects Statewide Order Draft Program Environmental Impact Report
Solicitation # 2019100230
The State Water Resources Control Board is managing a series of statewide restoration projects under a Program Environmental Impact Report to enhance aquatic and riparian habitats for anadromous salmonids and native species. A primary focus of these efforts is the Sunset Weir and Pumps Fish Passage Project in Sutter County, which involves removing the existing Sunset Weir from the Feather River to restore fish migration, installing five fish screens at the Sunset Pumps intake, constructing a new wet well, replacing outdated water diversion infrastructure, and stabilizing the left bank with vegetated rock slope protection. Additionally, the project includes filling the downstream scour pool and capping it with spawning grade gravel to create suitable substrate. These initiatives are part of a broader set of restoration activities across California, including projects in Butte, Fresno, Madera, Siskyou, Shasta, Tehama, and Plumas counties. Key deliverables across these sites include the construction of fishways, floodplain excavation, and the creation of side channels and habitat units. All projects are conducted in compliance with the California Environmental Quality Act and the Public Resources Code, with various agencies such as the Wildlife Conservation Board and the Central Valley Flood Protection Board serving as lead or responsible agencies. Performance for specific sites, such as the Arroyo Canal project, includes long-term land use leases extending through 2045.
State Water Resources Control Board

POSTED

2 days ago

DEADLINE

N/A

AI Contract Overview

Show more

The Health and Human Services Commission of Texas is seeking a subcontractor for a project titled Concrete and Site Work for Gate Foundations. The scope of work involves comprehensive site preparation, excavation, and the installation of concrete foundations specifically for new gate posts and control enclosures. Key deliverables include the pouring of footings and thorough site cleanup upon completion. This opportunity is categorized under NAICS code 237120. Interested parties must submit their responses by the deadline of February 12, 2026, at 4:30 PM. Further details regarding the solicitation can be accessed through the Texas SmartBuy portal.

General Info

Texas HHSC seeks subcontractor for gate foundation concrete and site work by February 2026.

Agency

Texas → Health and Human Services Commission

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of HHS0016774v4.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Electric Gate Services at the Lubbock State Supported Living Center

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • WH Ford RTC Fueling System Repairs, KentuckyOpen now, due in 32 days
  • Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State ParkOpen now, due in 26 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Health and Human Services Commission
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Health and Human Services Commission
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Site preparation, excavation, and concrete foundation work for new gate posts and control enclosures, including pouring footings and site cleanup.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS