This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Concrete materials
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Directorate of Public Works at the Engineer Research and Development Center in Vicksburg, Mississippi, requires concrete materials for dust reduction at Building 2026. This small business set-aside contract, solicitation W912HZ26R7067, encompasses 17 line items, including 181 cubic yards of 4,000 psi MDOT Class AA concrete with superplasticizer and a slump of 8, 100 gallons of ASTM C 309 Type 2 white pigmented curing compound, and various construction supplies such as rebar, welded wire sheets, and plastic sheeting. All materials must comply with federal Buy American requirements, and equivalent products are acceptable if they meet the specified technical standards. Delivery is strictly limited to materials only, with no requirements for pump trucks, testing, or onsite services. All non-concrete materials must be delivered in a single shipment within 14 calendar days of the award. The concrete must be delivered in three separate, non-consecutive shipments of approximately 39, 58, and 84 cubic yards, scheduled through the technical point of contact, Tony King. There may be intervals of up to two weeks between these concrete deliveries to allow for site preparation. All delivery costs must be included in the quote.
General Info
Place of Performance
Vicksburg, MS, 39180, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Directorate of Public Works at the Engineer Research and Development Center (ERDC) in Vicksburg, MS has a requirement for concrete materials at Building 2026 to help reduce dust. All materials, excluding the concrete, shall be delivered at one time within 14 Calendar Days of Award. The concrete shall be delivered in 3 separate (39 yd, 58 yd, 84 yd for a total of 181 yd) non-consecutive deliveries after being scheduled by Tony King (The three concrete deliveries are approximate in size, could be in any order, and there could be several days, up to 2 weeks, between deliveries to allow prep for the concrete).
More opportunities from Department Of Defense → W2R2 USA Engr R & D Ctr
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
