Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Concrete Pad Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

238110 - Poured Concrete Foundation and Structure Contractors

Place of Performance

NV

Set-Aside

SBA

Documents

This scope was carved out of 140R3026Q0143.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

J--E21 PRCA HVAC REPLACEMENT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Lower Colorado Regional Office
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs concrete pads for prime contractors on Bureau of Reclamation projects at the Planet Ranch Conservation Area. Performs forming and pouring of concrete pads to support ground-mounted HVAC equipment. Complies with OSHA and Reclamation Safety and Health Standards (RSHS). Delivers installed concrete equipment pads.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
PWC S. Construction Concrete for New Storage Building 5TD0
Solicitation # SRC0000042245
The Ohio Department of Natural Resources is soliciting bids for concrete installation services at the PWC South Construction new storage building located in Bainbridge, Ohio. The scope of work requires the contractor to provide all labor, materials, and equipment to perform concrete repairs around interior posts, as well as the preparation, framing, and pouring of a 50 x 10 foot apron approach and a 20 x 20 foot connecting pad. Technical specifications mandate the use of 6-inch, 4000 psi fiber-reinforced concrete with a broomed finish, tooled edges, saw/stress cuts, and the application of a concrete sealer upon completion. The contract will be awarded to the lowest responsive and responsible bidder based on the low lot total or line item pricing. Bidders must submit proposals through the OhioBuys portal by October 16, 2026, for a requested delivery date of December 3, 2026. Award preferences may be applied for Buy American, Buy Ohio, and certified veteran-friendly businesses. The selected contractor must maintain a performance bond equal to the total contract payments and carry commercial general liability and business automobile liability insurance with a minimum aggregate limit of 2 million dollars, naming the State of Ohio and ODNR as additional insureds. Compliance requirements include adherence to Ohio prevailing wage laws, drug-free workplace policies, and non-discrimination standards. Additionally, the contractor must affirm that all services and state data handling occur within the United States. Payments are issued on a 30-day cycle following the receipt of a proper invoice submitted to Financial Shared Services, contingent upon the availability of lawful appropriations by the Ohio General Assembly.
Dnr352301 Construction Dnrhig

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 238110
New
SLED
Moorpark College Technology Building Exterior Repair Project
Solicitation # 740
The Moorpark College Technology Building Exterior Repair Project, issued by the Ventura County Community College District under solicitation number 740, involves comprehensive exterior restoration at 7075 Campus Road, Moorpark, California. The scope of work includes concrete restoration and cleaning through epoxy and gravity flow crack injection and spalling repair, as well as the restoration of glue-laminated beams and wood components using pesticides, borate preservative rods, epoxy consolidant, and non-structural putty. Additionally, the contractor is responsible for applying joint sealants and painting existing facilities. Because the building will remain occupied with classes in session, the contractor must maintain access to all entrances and classrooms, secure work areas, and manage noise levels. A mandatory mock-up of precast fascia, crack filling, and railing repairs must be approved before full-scale work begins. The contract will be awarded to the lowest responsive and responsible bidder, requiring a current B Contractors License, DIR registration, and compliance with California prevailing wage laws. Bidders must provide bid security of at least 10 percent of the proposal amount, and the successful awardee must provide a Labor Material Payment Bond. The project has a strict performance period of 45 consecutive calendar days from the Notice to Proceed, with a one-year warranty on all workmanship and materials. Administrative requirements include submitting progress payments with certified payrolls and conditional/unconditional waivers. All materials must be delivered in original packaging and stored above 55 degrees Fahrenheit to ensure quality standards.
Ventura County Community College District

POSTED

1 day ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of The Interior → Lower Colorado Regional Office

Same awarding agency

NAICS: 238220
New
Federal
J--E21 PRCA HVAC REPLACEMENT
Solicitation # 140R3026Q0143
Solicitation 140R3026Q0143 is a small business set-aside request for quotation issued by the Bureau of Reclamation Lower Colorado Regional Office for the replacement of HVAC systems at the Planet Ranch Conservation Area. The project requires the contractor to perform site inspections, complete Manual J load calculations, and develop design and construction plans for the removal of existing roof-mounted units and the installation of two new ground-mounted HVAC systems for Buildings 100 and 200. Key technical requirements include the use of insulated metal ductwork, compliance with NEC 2026 electrical standards, and the installation of concrete pads with a compressive strength of 3,000 to 4,000 psi. The performance period is 90 days after the notice to proceed, with delivery terms set as FOB Destination. The contract is subject to the Davis-Bacon Act and requires the submission of a safety program, a quality control plan, and a certificate of liability insurance. Amendment 01 updated the solicitation to include FAR Clause 52.228-13 for Alternative Payment Protections and revised Section 7 of the Statement of Work. Award will be granted to the responsible offeror determined to be most advantageous to the government based on a direct comparison of technical approach, experience with comparable projects, past performance over the last three years, and price. Bidders must provide a bid guarantee and will be reimbursed for performance and payment bond premiums. Quotes must include a completed SF-18 and a price schedule covering mobilization, removal and disposal, and installation.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 561210
Federal
M--OPERATION AND MAINTENANCE OF YDP, IDIQ
Solicitation # 140R3026R0012
Solicitation 140R3026R0012 is a 100% 8(a) set-aside Indefinite Delivery Indefinite Quantity (IDIQ) contract issued by the Bureau of Reclamation, Lower Colorado Regional Office. The contract seeks a provider for 24/7, 365-day operation and maintenance (O&M) support services for the Yuma Desalting Plant (YDP), the A-22 Waste Disposal Facility, and the Water Quality Improvement Center (WQIC) Research Facility, with additional maintenance-only support for Analytical Laboratory Services. The period of performance is scheduled from February 1, 2027, to January 31, 2032, with a maximum contract value of 35 million dollars and a minimum guarantee of 5,000 dollars. The scope of work includes comprehensive management, engineering support, and the completion of a specific modifications and repair backlog. Key deliverables include a Maintenance Management Plan and the upkeep of the YDP technical library. Award will be based on a best-value determination, where non-price factors—including corporate experience, management approach, technical approach, staffing, and past performance—are significantly more important than price. Proposals must be submitted electronically by October 14, 2026, at 12:00 P.M. PDT. The contract incorporates various FAR clauses and Bureau of Reclamation standards, including specific liability insurance requirements and strict adherence to the Invoice Processing Platform (IPP) for electronic payments.
Facilities Support Services

POSTED

8 days ago

DEADLINE

in 13 days
View Details
NAICS: 238320
Federal
PROTECTIVE COATINGS IDIQ
Solicitation # DOIRFBO260017
The Bureau of Reclamation, Lower Colorado Regional Office, is seeking capability statements for a Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide protective coatings and corrosion mitigation services. The scope of work involves surface preparation, the application of protective coatings, the erection of containment systems, and the abatement of coatings containing lead or other heavy metals. These services will be performed at the Hoover, Davis, and Parker Dams located across Arizona, California, and Nevada. The estimated total value of the contract is 32 million dollars over a five-year ordering period under NAICS code 238320. To be considered responsive, offerors must provide a narrative of operations, a critical path project schedule with a Gantt chart, and a price schedule. Technical requirements are stringent, requiring the contractor to hold a current SSPC-QP2 certification. Personnel must meet specific qualifications, including Coating Application Specialist (CAS) or Plural Component Application Certification (PCAC) for applicators, and Level 2 or 3 NACE or SSPC certifications for inspectors. Additionally, the contract mandates strict adherence to safety and environmental protocols, including Job Hazard Analysis, hazardous materials packaging per 49 CFR, and medical testing for personnel involved in heavy metal abatement. Acceptance of work is based on government inspection at the work site, with dry film thickness compliance measured according to SSPC PA2 standards.
Painting and Wall Covering Contractors

POSTED

17 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
J--N1 Brake Ring
Solicitation # 140R3026Q0137
Solicitation 140R3026Q0137 is a simplified acquisition construction project issued by the Department of the Interior, Bureau of Reclamation, Lower Colorado Regional Office. The project involves the replacement of the Unit N1 brake ring assembly at Hoover Dam, with an estimated contract value between $100,000 and $250,000. The scope of work requires the contractor to manufacture ten stress-relieved brake plates using ASTM A588 Grade B steel and ASTM A193 B7 bolts, provide necessary fasteners and weldments, and perform field machining and installation. Technical requirements specify a surface finish of 32 micro-inches or better for the brake-pad interface and strict machining tolerances of plus or minus 1/32 inches for fractional measurements. The period of performance is scheduled from September 18, 2026, to February 15, 2028, with onsite work expected between November 2027 and February 2028. The government intends to award a single firm-fixed-price purchase order based on the best value, evaluating quotes on technical capability, schedule, past performance, and price. Key administrative requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon wage rates for installation labor, and adherence to Buy American and liability insurance standards. Final acceptance of the work will be conducted by the Contracting Officer’s Representative, and payments must be processed electronically via the Internet Payment Platform.
Water and Sewer Line and Related Structures Construction

POSTED

28 days ago

DEADLINE

in about 19 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS