Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Inspection and Quality Assurance

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 9 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Construction Inspection and Quality Assurance subcontract is issued by the Purchasing Department of the San Diego Metropolitan Transit System in California. This engagement focuses on providing independent inspection and testing services to verify that all work adheres to contract documents and rigorous industry standards, specifically including ASTM, SAE, UL, and MIL specifications. Interested parties must submit their responses by the deadline of August 7, 2026. The opportunity is categorized under NAICS code 541330, reflecting its focus on engineering services to ensure high-level quality control and regulatory compliance throughout the project duration.

General Info

San Diego MTS seeks construction inspection and quality assurance services by August 7, 2026.

Documents

This scope was carved out of PWB473.0-26.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Service Fluid Distribution Replacements at IAD and KMD Bus Divisions

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Purchasing Department of San Diego Metropolitan Transit System
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Independent inspection and testing to ensure compliance with contract documents and standards including ASTM, SAE, UL, and MIL specifications.

More opportunities from California → Purchasing Department of San Diego Metropolitan Transit System

Same awarding agency

NAICS: 811198
New
SLED
Fleet and Ancillary Inspections - IFB
Solicitation # L1718.0-27
The San Diego Metropolitan Transit System (MTS) is soliciting bids under solicitation number L1718.0-27 for Fleet and Ancillary Inspections. This five-year contract covers inspection and maintenance services for the MOW (Track and Wayside), LRV, and Facilities departments. The scope includes 90-day BIT inspections, boom/bucket and hi-rail inspections, and annual inspections, as well as associated labor and materials. The award will be granted to the lowest responsive and responsible bidder based on a compliance review of the technical specifications and a comparison of the total all-inclusive bid amount. To be eligible, contractors must be licensed in the State of California, possess five years of current experience in the required inspection types, and be Enterprise authorized for maintenance and repair. Services must be performed by California-licensed technicians who are ASE certified with Air Brakes qualifications and qualified to inspect hi-rail equipment. Compliance with California Highway Patrol (CHP) BIT Program, OSHA Aerial Lift regulations, and Federal Transit Administration (FTA) requirements is mandatory. Bidders must also submit a Federal Tax Liability and Recent Felony Conviction Certification and adhere to specific drug and alcohol testing requirements under 49 C.F.R. part 655. The contract requires comprehensive insurance coverage, including $2,000,000 for Commercial General Liability and Automobile Liability, and $4,000,000 for General Aggregate. Invoicing is handled via email to the MTS Accounting Department with payment terms of net 30 days. Bids must be submitted electronically through the PlanetBids portal by the November 23, 2026, deadline, including the required bid forms and lobbying certifications. MTS encourages participation from various certified small and minority-owned business enterprises.
All Other Automotive Repair and Maintenance

POSTED

5 days ago

DEADLINE

in 26 days
View Details
NAICS: 541511
SLED
Internet and Intrant Development and Maintenance Services
Solicitation # G3261.0-27
The San Diego Metropolitan Transit System (MTS) is soliciting proposals for professional internet and intranet development and maintenance services under solicitation G3261.0-27. The scope of work requires a qualified firm or individual to provide proactive monitoring, cyber threat safeguarding, and technical support, including the resolution of Drupal code deployment bugs and user interface errors. Key deliverables include maintaining ADA web accessibility compliance per WCAG 2.1 Level AA standards, providing one to three virtual training sessions annually for non-technical staff, and utilizing Google Analytics for user activity reporting. The contractor must ensure website performance across the latest versions of Chrome, Microsoft Edge, and Safari. The contract is structured with a two-year base period followed by three option years, with each year estimating 420 hours of professional services and 12 months of technology expenses. Award evaluation follows a two-step process consisting of a pass/fail review of mandatory experience and insurance capabilities, followed by a scored technical evaluation weighted at 20% for firm qualifications. Mandatory requirements include Cyber and Privacy Liability insurance, compliance with the Levine Act regarding campaign contributions, and adherence to drug and alcohol testing regulations. Proposals must be submitted via the PlanetBids portal by December 15, 2026, and must include a separate technical proposal and a cost proposal using the provided pricing form.
Custom Computer Programming Services

POSTED

8 days ago

DEADLINE

in about 2 months
View Details
SLED
PCI Compliance and Information Security Services
Solicitation # G3262.0-27
The San Diego Metropolitan Transit System (MTS) is soliciting a qualified firm to provide PCI Compliance and Information Security services for a five-year contract term. The scope of work involves ongoing PCI DSS compliance maintenance, Qualified Security Assessor (QSA) services, PCI advisory services, and general cybersecurity support. The contractor will be responsible for sustaining compliance across various cardholder data environments, including mobile applications, web interfaces, ticket vending machines, and point of sale systems such as Square Payment, EZ Wallet, and MOBILEvario. Key deliverables include an annual audit cycle with a sustainment phase from September to April and a formal audit phase from May to August, culminating in the issuance of an Attestation of Compliance typically by August 18. All services must adhere to the most current PCI standards, specifically noting that MTS has achieved PCI DSS 4.0.1 compliance. The procurement process utilizes a two-step evaluation: an initial pass/fail screening followed by a scored technical and cost evaluation. Mandatory pass/fail criteria include the ability to meet insurance requirements, previous experience with public agencies or transit entities, and the maintenance of a valid QSA certification. Technical proposals are weighted at 25% based on the qualifications of the firm or individual. Proposers must submit technical proposals in PDF format and cost proposals in Excel via the PlanetBids portal by the December 15, 2026 deadline. Required submissions include a cost pricing form, a description of personnel recruitment processes, and proof of insurance. Additionally, the contractor must comply with MTS Board Policy No. 25 regarding Equal Employment Opportunity and provide data breach insurance for QSA services.

POSTED

15 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS