Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Manager At-Risk Plumbing Infrastructure Enhanced Maintenance Project

Closed
2026-RFP-0504State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 11 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The City of Pasadena is seeking a Construction Manager At-Risk for the Plumbing Infrastructure Enhanced Maintenance Project under solicitation number 2026-RFP-0504. This local government project is located in Pasadena, California, and focuses on the maintenance and enhancement of plumbing infrastructure. Interested vendors must attend a mandatory pre-bid meeting on August 31, 2026, at 9:00 AM. The final deadline for responses is September 17, 2026, by 2:30 PM PT. Detailed bid documents and submission instructions are available through the city's procurement portal.

General Info

Pasadena seeks Construction Manager At-Risk for plumbing infrastructure project; deadline September 17, 2026.

Documents

34

099742017 - RBOC Plumbing Infra - Gas Maintenance Project - Issue for Bid

PDF, High priority: read this firstitb
High

099742017 RBOC Plumbing Infra Water Maintenance Project Issue for Bid

PDF, High priority: read this firstitb
High

099742017 Sewer Maintenance Project Issue for Bid

PDF, High priority: read this firstitb
High

City of Pasadena Conflict of Interest Disclosure and Certification

PDF, High priority: read this first2 pages · conflict-of-interest
High

Declaration of Non-Collusion and Vendor Forms for City of Pasadena Procurement

PDF, High priority: read this first6 pages · declaration-of-noncollusion
High

DoIT Technical Assessment Questionnaire Rev 20210806

XLSX, High priority: read this first5 pages · technical-questionnaire
High

Exclusive Negotiating Agreement Template - City of Pasadena

PDF, High priority: read this first7 pages · contract-document
High

LA-01286-14 Geotechnical Recommendations for Utility Trenches

PDF, High priority: read this first7 pages · sow
High

Project 099742017 - Rose Bowl Gas Maintenance Plans

PDF, High priority: read this firstspecifications
High

Relevant Experience Form for Bid Submission

PDF, High priority: read this first5 pages · past-performance
High

RFP - Construction Manager At-Risk Plumbing Infrastructure Enhanced Maintenance Project

PDF, High priority: read this first70 pages · rfp
High

Rose Bowl Plumbing Infrastructure Bid Form v3 Addendum

XLSX, High priority: read this first1 page · bid-form
High

Rose Bowl Plumbing Infrastructure Enhanced Maintenance Project RFP

PDF, High priority: read this firstrfp
High

Rose Bowl Stakeholder Calendar for RFP

XLSX, High priority: read this first3 pages · sow
High

Sewer Maintenance Project (099742017) - Plan Check Revision 1

PDF, High priority: read this firstspecifications
High

Subcontractor Listing - Public Works Bid Form

PDF, High priority: read this first1 page · subcontractor-listing
High

Water Maintenance Project - Plan Check Revision 1

PDF, High priority: read this firstspecifications
High

Supplemental FEMA Terms & Conditions v2 (Oct 1, 2024)

PDF, Medium priorityguidance
Medium

25270 Rose Bowl Utility Survey

PDF, Low priority8 pages · survey
Low

City of Pasadena Unique Entity Identifier (UEI) Form

PDF, Low priority1 page · other
Low

Civil Litigation History Certification v02 - RBOC CMAR

PDF, Low priority2 pages · certification
Low

Declaration of Eligibility to Contract (Not Debarred)

PDF, Low priority1 page · certification
Low

Designated Representatives and Key Personnel Form

PDF, Low priority1 page · other
Low

Disqualification Disclosure Questionnaire

PDF, Low priority1 page · disqualification-disclosure
Low

Federal Required Certification Regarding Lobbying

PDF, Low priority1 page · certification
Low

Pasadena Taxpayer Protection Amendment Disclosure

PDF, Low priority1 page · disclosure
Low

Proof of Authority - Identity Confirmation and Incumbency Certificate

PDF, Low priority4 pages · other
Low

Public Contract Code Disclosures - RBOC CMAR

PDF, Low priority2 pages · other
Low

Rose Bowl Plumbing Infra Sewer Maintenance Plans - Plan Check Comment Response Matrix

XLSX, Low priority12 pages · q-and-a
Low

Rose Bowl Plumbing Infra Water Maintenance - Plan Check Comment Response Matrix

XLSX, Low priority12 pages · q-and-a
Low

Standard Form-LLL Disclosure of Lobbying Activities

PDF, Low priority3 pages · disclosure-of-lobbying-activities
Low

WO 798158 - RBOC 1001 Rose Bowl Dr Pasadena, CA

PDF, Low priorityspecifications
Low

RBOC_Plumbing_Infra_Specs_for_IFB_PDFs_-_NEW_Y_Addendum_No._3.zip

ZIP

Specifications.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 17, 2026 to Sep 21, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pasadena
Contacts2 people available
OfficePasadena, CA, 91101, USA
Organization / AgencyCalifornia → City of Pasadena
Office AddressPasadena, CA, 91101, USA
Contacts
Evan SteinDirector of Projects and Facilities
Nancy SilverChief Compliance Officer

Interested Companies (23)

Cooperative LA
ConstructConnectCincinnati, OH
Crosby Plumbingaltadena, CA

See All 23 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Location: The City of Pasadena is a diverse community that is home to approximately 142,017 people. Pasadena is the ninth-largest city in Los Angeles County. It is one of the primary cultural centers of the San Gabriel Valley. The City covers approximately 22.5 square miles, with an average of ten residents per acre. The median age of its residents is approximately 36.9 years. There are over 100,000 jobs in a wide variety of industries in the City of Pasadena. The Rose Bowl: The Rose Bowl Stadium, opened in 1922 and designated as both a National Historic Landmark and a California Historic Civil Engineering Landmark, stands as one of the most iconic sport and entertainment venues in the world. The selected CMAR's work must adhere to all legal requirements to maintain the Rose Bowl Stadium's designated Landmark status. Known globally as "America's Stadium," the venue has hosted five Super Bowls, two Olympic Games, and countless events of historic significance across college football, international soccer, concerts, and civic life. The stadium is an enduring symbol of excellence and pride for the City of Pasadena and the State of California. Rose Bowl Lasting Legacy Campaign: The Rose Bowl Lasting Legacy Campaign is a multi-phase initiative focused on eight major capital improvements timed around the 2028 Olympic Game. Rose Bowl Stadium Plumbing Infrastructure Project: Rose Bowl Stadium Plumbing Infrastructure Project lays the groundwork of the stewardship the Rose Bowl Lasting Legacy Campaign, renewing the core utility infrastructure on which every event at the venue depends. Through this campaign and its supporting capital projects, the RBOC seeks to preserve and elevate the venue's historic stature while preparing it to meet the demands of the 21st Century. The 100% Construction Documents title the three packages the Water, Sewer, and Gas Maintenance Projects; certain funding, design, and Board records refer to the same work as the Rose Bowl Stadium Plumbing Infrastructure Project. Both names refer to this Project. Impetus: At the stadium's 100-year mark, RBOC commissioned the Rose Bowl Sewer and Water Asset Management Plan, which found that most of the stadium's underground water and sewer lines have exceeded the typical 50-year design life, (some in service for as many as 85 years at the time of the report) and documented a history of pipe breaks repaired under emergency conditions rather than through planned replacement. Condition: The stadium is served by a single 12-inch lateral with a 10-inch meter (east side, near Gate B) carrying both domestic and fire protection demand. Distribution is a 12-inch ductile iron outer loop, an 8-inch segment, and a 6-inch cast iron inner loop dating to 1935. The venue sits in a flood plain on miscellaneous rock and old fill and has experienced subsurface movement and cave-ins that have ruptured utility lines. Record drawings for a system of this age are incomplete, and repeated leaks in the existing underground gas piping have been attributed to unstable soils that prior remediation has not resolved. The sewer system discharges to the City's collection system through a single 12-inch main at the south end of the brick plaza; a CCTV survey and NASSCO condition assessment has not yet been performed; it will be conducted as part of the Project, and the resulting condition report will be provided to Proposers by addendum if available prior to the Proposal Submission Deadline, or to the selected CMAR during Phase 1. Work: The water scope is maintenance replacement of aging mains. The designed water scope abandons the 6-inch cast iron inner loop, upsizes the 8-inch segment to 12-inch, and maintains a combined fire and domestic system for reliability and ease of operator maintenance. Sewer rehabilitation (Alternate 1) is by cured-in-place pipelining with major and minor spot repairs and selected new laterals, to be informed by the CCTV survey and NASSCO condition assessment once performed. Gas replacement (Alternate 2) abandons existing underground gas system in favor of new MDPE distribution following the water alignment in joint trench where possible.

More opportunities from California → City of Pasadena

Same awarding agency

NAICS: 423490
SLED
FLIR T1020 HD Thermal Camera Kit
Solicitation # 2026-IFB-MS-0550
The City of Pasadena Water and Power Department, Power Delivery Unit, is soliciting bids under solicitation number 2026-IFB-MS-0550 for the purchase of one FLIR T1020 HD Thermal Camera Kit. The required kit must include the main unit with a viewfinder, a three-lens kit featuring 12, 28, and 45 degree lenses, and a comprehensive set of accessories including a Bluetooth headset, memory card, power supply, and specific software subscriptions. Bids must be submitted electronically via the OpenGov eProcurement Portal by October 28, 2026, at 4:00 pm. The contract will be awarded to the lowest responsive and responsible bidder based on the total price, with evaluations considering material quality, bidder capability, financial resources, and past performance. Successful vendors must deliver the equipment in new condition to 311 W. Mountain Ave., Pasadena, CA, within sixty days of the order. Delivery is restricted to normal business hours and requires protective packaging to mitigate risks from impacts, heat, and moisture. Compliance requirements are extensive, including the submission of a Unique Entity Identifier from SAM.gov, IRS Form W-9, and certifications regarding recycled content, non-collusion, and equal employment opportunity. Additionally, the procurement incorporates supplemental FEMA terms and conditions, lobbying disclosures, and adherence to California State laws, including the Prevailing Wage Law and ADA accessibility standards. Invoices are to be processed electronically through the City's dedicated vendor portal.
Other Professional Equipment and Supplies Merchant Wholesalers

POSTED

7 days ago

DEADLINE

in about 20 hours
View Details
NAICS: 334514
SLED
Advanced Metering Infrastructure (AMI) System and Installation Services
Solicitation # 2026-RFP-0143
The City of Pasadena, through its Water and Power department, is soliciting proposals for an end-to-end Advanced Metering Infrastructure (AMI) system and associated installation services under solicitation 2026-RFP-0143. The project aims to modernize metering operations for both water and electric utilities by implementing a vendor-hosted AMI headend system and Field Area Network (FAN). The selected vendor will provide electric meters, water endpoints, and integration services to deliver billing and interval reads to the City's existing Oracle Customer to Meter (C2M) and Oracle Meter Data Management (MDM) environments. The scope includes mass meter changeout work, testing, commissioning, and go-live support, with specific hardware requirements such as scannable barcodes, blue electric meter seals, and concrete gray lids stamped with the City logo. Proposals are due by December 1, 2026, and will be evaluated based on a weighted scoring system: Solution Narrative (35%), Requirements compliance (20%), Background and Experience (20%), and Cost (15%). The contract mandates strict adherence to various regulatory standards, including the Build America, Buy America Act, CAL/OSHA safety regulations, and special prevailing wage determinations for meter technicians. Vendors must provide comprehensive insurance coverage, including $5 million in Cyber Liability, and submit a Unique Entity Identifier (UEI) from SAM.gov. Performance will be monitored by Pasadena Water and Power, with a 30-day window to reject individual installations based on workmanship and communication accuracy.
Totalizing Fluid Meter and Counting Device Manufacturing

POSTED

15 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS