Construction of a Spur Jetty, Saco River at Camp Ellis Beach, Saco, Maine

Closed
W912WJ25X17B7Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Saco, ME, 04072, USA

Set-Aside

NONE

Documents

2

North Jetty Spur Saco River and Camp Ellis Beach - Design Documents

PDF, High priority: read this firstspecifications
High

USACE New England District - Saco River Spur Jetty Sources Sought

PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA

Full Description

Show more
The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for Construction of a Spur Jetty that will be tied into the existing North Jetty located at the mouth of the Saco River at Camp Ellis Beach in the City of Saco, Maine. This announcement is to determine the interest, availability, and capability of Small and Large Business concerns for this project. The NAICS code for this procurement is 237990 with a size standard of $45M. The contract solicitation is planned to be issued in the fall of 2025 with construction to take place over a 12-month period beginning in the spring of 2026. The estimated construction cost is between $10,000,000 and $25,000,000. The existing North Jetty at Camp Ellis Beach is an interlocked stone structure located at the entrance to the Saco River. Originally constructed in 1872, the structure has been lengthened and repaired numerous times over the years. The North Jetty is approximately 6,600 feet in length and constructed to a height of 15 feet MLW with an 8-ft crown width. Side slopes are 1H:1V. The proposed jetty spur will extend from the existing North Jetty into Saco Bay. The proposed work consists of construction a 750-ft long spur jetty extending from the North Jetty into the Saco Bay as shown on the draft contract drawings and as required by the specifications. As part of the spur jetty construction, the Contractor will reinforce a 250-ft length of the North Jetty, from Station 15+50 to 18+00. The work includes mobilization and demobilization, the furnishment and delivery of stones, removal/rehandling/resetting of existing stones, and placement of new bedding, underlayer and armor stone for tie-in between the new and the existing structure. Anticipated stone required to construct the spur jetty and reinforce the existing north jetty includes approximately 12,000 tons of bedding stone; 18,000 tons of underlayer stone; and 50,000 tons of 8-12 ton armor stone (40,000 tons for the spur and 10,000 for the existing jetty reinforcement. The reinforcement work will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances. Construction, stone delivery, and access will be by water. Access to the breakwater by land is unavailable and no work should be completed from the crest of the breakwater. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. Low tide water depths in the vicinity of the structure range from 12 to 50 feet, and the average tidal range is approximately 11 feet. The area is located 1500 off the shoreline and subject to wave action. No spudding or anchoring into the existing structure is permitted. The U.S. Army Corps of Engineers, New England District is looking for responses to the questions below from BOTH SMALL AND LARGE BUSINESSES: What constructability challenges does industry identify with delivery of stone and staging, considering no staging options are available on site? What constructability challenges does industry identify with performing the work, considering difficulty accessing the structure, water depths, large tidal range, and weather conditions? What constructability challenges does industry identify with obtaining enough stone from quarries (assumes award in late November and start around April)? Would industry benefit from a site visit if organized by the Government? Responses will determine the likeliness of this happening. Draft drawings showing a concept design plan, and a draft Specification Section 01 11 00 SUMMARY OF WORK are included to help provide more context for responses to questions. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.), answers to questions above, type of equipment the firm might propose to use on the project, two (2) example projects performed by the firm in the last ten (10) years (including Points of Contact for those projects) showing experience with the proposed equipment and stone size handled for each project in a marine environment, and bonding capacity. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications meeting the same qualifications listed above, which will be used to support the bidder's effort. Firms may use subcontractor experience to demonstrate experience with the requirements, but the role and work performed by each team member (prime and subcontractors) on projects demonstrating that team member's experience shall be the same as the role for that team member for this project. Responses should include experience of Foreman and Crane Operators working on stone structures. Proof of bonding capability is required. Responses are limited to twenty pages and due by June 13, 2025. Responses should be emailed to: contact@example.gov The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS