This Solicitation opportunity from Virginia was posted on June 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Construction of Route 50 and Everfield Drive Roundabout, RFQ 690002
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The County of Loudoun, Virginia, is seeking a qualified General Contractor to construct a single-lane roundabout at the intersection of Route 50 and Everfield Drive in Aldie, as part of ongoing efforts to enhance traffic safety, improve flow, and accommodate growing residential demand along the Route 50 corridor. The project involves converting the existing unsignalized intersection into a modern roundabout with realigned and widened roadway approaches, supplemented by storm sewer and drainage upgrades, pedestrian facilities, updated signage and pavement markings, and a comprehensive multi-phase traffic management plan. Work scope encompasses all necessary surveying, construction layout, earthwork, rock excavation, erosion and sediment control, environmental compliance, and adherence to strict safety protocols. The Contractor must secure and comply with multiple permits including those from the Virginia Stormwater Management Program, Virginia Department of Transportation, and other environmental agencies. Bids are due by August 14, 2026, at 4:00 p.m., following an optional virtual Pre-Bid Conference held on July 9, 2026, and three subsequent addenda that extended the acceptance deadline and introduced final changes to the solicitation. All bidders are expected to review the complete set of documents including the RFQ 690002, Supplemental Specifications, General Provisions, Schedule of Bid Items, and Escrow Agreement, along with the Prevailing Wage Determination for the project. The work will be performed in the Blue Ridge Election District and must adhere to all applicable local, state, and federal regulations, with the County maintaining oversight through its designated point of contact, Beth Cioni.
General Info
Agency
NAICS
Place of Performance
Not specifiedSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Intent of this Invitation for Bid (IFB) is for the County of Loudoun, Virginia (“County”) to obtain the services of a qualified General Contractor (“Contractor”) to construct the Route 50 and Everfield Drive (Route 3423) Roundabout (the “Project”).
The Project is part of the County’s ongoing efforts to improve safety, traffic flow, and access along the Route 50 corridor in Aldie, Virginia. Located within the Blue Ridge Election District, this intersection serves a growing residential area and is experiencing increasing traffic volumes. The roundabout is intended to reduce crash risks, calm traffic, and enhance operational efficiency at a key access point for local neighborhoods. This improvement aligns with recommendations from County transportation studies and supports the goals outlined in the County’s Capital Improvement Program.
The Project will convert the existing unsignalized intersection of Route 50 and Everfield Drive into a single-lane roundabout, with roadway approaches realigned and widened as needed to facilitate operations. Improvements will also include storm sewer and drainage upgrades, pedestrian facilities, roadway signing and pavement marking, and implementation of a multi-phase traffic management plan.
The general scope of work includes, but is not limited to, all surveying, construction layout, maintenance of traffic, earthwork (including the removal of unsuitable material), rock excavation, erosion and sediment control, environmental controls, safety procedures, and full compliance with all applicable permits. Required permits include, but are not limited to, Virginia Stormwater Management Program (VSMP)/Stormwater Pollution Prevention Plan (SWPPP) requirements, Virginia Department of Transportation (VDOT) Land Use permits, and other environmental permits.
Pre-Bid Conference:
An optional Pre-Bid Conference will be held virtually on July 9, 2026, at 11:00 a.m. to provide clarification on the project requirements and expectations outlined in this solicitation.
Addenda:
Addendum #1 Acceptance date changed to August 5, 2026 issued on July 23, 2026.
Addendum #2 Acceptance date changed to August 14, 2026 issued on August 3, 2026.
Addendum #3 Changes and/or Additions issued on August 6, 2026.
Publication Date/Time:
6/29/2026 4:00 PM Publication Information:
Invitation for Bid Closing Date/Time:
8/14/2026 4:00 PM Addendum Date/Time:
Addendum #3 issued on August 6, 2026. Pre-bid Meeting:
July 9, 2026 @ 11:00 a.m. Contact Person:
Beth Cioni Please see the attached document RFQ 690002 for additional contact information.
Download Available:
See Related Documents Business Hours:
8:30 AM to 5:00 PM Miscellaneous:
Addendum #3 Changes and/or Additions issued on August 6, 2026. Related Documents:
RFQ 690002 (PDF)
Attachment 3 Geotechnical Release Form (PDF)
Attachment 5 Prevailing Wage Determination LOUD-26-0013 (PDF)
Attachment 6 General Provisions (PDF)
Attachment 7 Supplemental Specifications (PDF)
Attachment 9 Escrow Agreement (PDF)
View Solicitation Abstract (PDF) Plan Holders List (PDF) Pre-Bid Conference Presentation (PDF) Addendum 1 (PDF) Addendum 2 (PDF) Addendum 3 (PDF)
Attachment 8 Special Provisions Copied Notes (PDF)
Attachment 10 Schedule of Bid Items (Revised) (XLS)
More opportunities from Virginia → Loudoun County
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
