Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction On State Highway In Butte, Colusa, And Sutter Counties At Various Locations

Closed
03-0J6304State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, micro tunneling, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. The project also emphasizes adherence to storm water pollution prevention standards. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, Kiewit seeks partners capable of maintaining labor harmony and notes its existing signatory status with several collective bargaining agreements. Quotes are due by November 18, 2025, and should be submitted via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
Stow Road Sidewalk Improvements (Ravenna Street to E. Streetsboro (SR 303))
Solicitation # 50011
The City of Hudson, Ohio, is soliciting bids for the Stow Road Sidewalk Improvements project, which involves the installation of 5,045 linear feet of five-foot-wide concrete sidewalk extending from Ravenna Street northward toward E. Streetsboro (SR 303). The scope of work includes clearing, grubbing, drainage improvements, the installation of Type 3 catch basins and 24-inch HDPP conduit, and the implementation of erosion control measures and a StormWaterPollutionPreventionPlan. All work must adhere to City of Hudson standards and specific ODOT specifications, including ODOT 301 for asphalt concrete and ODOT 614 for maintenance of traffic. Additionally, curb ramps must be installed in compliance with ADA standards and ODOT SCD BP 7.1. Bids are submitted on a unit price basis via the Bid Express website and must be accompanied by bid security, such as a Bid Guaranty and Contract Bond or a certified check for 10% of the bid. Evaluation is based on bidder qualifications, responsibility, and compliance with prescribed requirements. The successful contractor will be required to provide a performance bond and certificates of insurance before commencing work. Payments are processed via applications for payment submitted to the project engineer, with payment due within 60 days of presentation to the owner. The project requires a registered Professional Surveyor in the State of Ohio for construction layout and verification.
City of Hudson

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
Multi-Purpose Path along Barlow Road (Phase 2)
Solicitation # 50012
The City of Hudson, Ohio, is soliciting bids for the Multi-Purpose Path along Barlow Road (Phase 2) project. The scope of work involves the installation of approximately 200 lineal feet of seven-foot wide Class C concrete trail, along with grading, pavement striping, storm and road improvements, and potential railroad improvements. Key deliverables include the installation of traffic signs and supports, and the contractor is required to maintain two-way traffic on Barlow Road during construction. The project must be completed, including all punch list items, by April 30, 2027, with liquidated damages of $1,000 per day for delays beyond this date. The contract will be awarded to the lowest and best bidder based on compliance, responsiveness, and the bidder's financial and professional qualifications. Eligible bidders must demonstrate at least three years of experience in similar work and the successful completion of at least three comparable projects. This is a unit price contract requiring bid security of 10% of the bid amount, as well as performance and payment bonds and three specific insurance policies. All work must adhere to the City of Hudson Engineering Standards, ODOT Construction and Material Specifications, and OSHA confined space requirements. Furthermore, the contractor must comply with Ohio Revised Code Chapter 4115 regarding prevailing wage rates. Bids must be submitted electronically via Bid Express.
City of Hudson

POSTED

1 day ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The State of California Department of Transportation is soliciting bids for contract 03-0J6304, a bridge scour mitigation project located at various sites on Routes 5, 20, and 70 within Butte, Colusa, and Sutter Counties. With an estimated cost of 1,430,000 dollars, the scope of work includes structural bracing at the Sutter Bypass, rock slope protection and fence work at Hunters Creek and Dudley Creek, and the removal of debris and vegetation. The project requires extensive temporary traffic control, water pollution control, and strict environmental stewardship, including biological monitoring for Giant Garter Snakes and migratory birds. Additionally, the contractor must manage hazardous materials, including asbestos-containing construction materials, treated wood waste, and aerially deposited lead, following specific packaging and labeling regulations. Bids are submitted on a cost plus time basis, with a response deadline of October 20, 2026. Eligible bidders must hold a Class A or C-51 license and adhere to prevailing wage requirements. The contract establishes a 3 percent DVBE goal and a 5 percent SBE goal, offering bid comparison preferences for certified small businesses and California-based companies. Performance requirements include the use of LCPtracker Pro for certified payroll, ACI Concrete Field-Testing Technician Grade 1 certification for quality control personnel, and compliance with 2025 Standard Specifications and Plans. Job site activities may begin before the 55th day after contract approval provided specific authorizations are obtained and a 72-hour notice is submitted for each work location.

General Info

Caltrans bridge scour mitigation project in three counties costing 1,430,000 dollars.

Documents

2
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstspecifications
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 15 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Socorro Urena

Full Description

Show more
Bid #03-0J6304: This project involves bridge scour mitigation at various locations in Butte, Colusa, and Sutter Counties on Routes 5, 20, and 70. Key work includes structural bracing at Sutter Bypass (Br No. 18-0005), rock slope protection (RSP) and fence work at Hunters Creek (Br No. 15-0015L/R) on Route 5, and RSP, fence work, and debris/vegetation removal at Dudley Creek (Br No. 12-0143) on Route 70. Erosion control measures, including bonded fiber matrix and temporary reinforced silt fences, are required. The project also involves the removal of roadside signs, installation of new signs, and management of treated wood waste, aerially deposited lead (ADL), and asbestos-containing construction materials (ACCM) from existing paint systems and barrier rail shims. Extensive temporary traffic control, water pollution control, and environmental stewardship measures, including biological monitoring for migratory birds and Giant Garter Snakes, are integral to the project.

More opportunities from California → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

Same awarding agency

NAICS: 237310
SLED
Construction On State Highway In San Diego County In Oceanside From Route 5/76 Separation To 0.3 Mile East Of Melrose Drive
Solicitation # 11-430914
The State of California Department of Transportation has issued solicitation 11-430914 for construction on State Highway Route 76 in Oceanside, San Diego County. The project scope covers the area from the Route 5/76 separation to 0.3 mile east of Melrose Drive and primarily involves cold planing AC pavement and RHMA-G overlay. The estimated project cost is 39 million dollars, with bids required on a unit price basis. The total project duration is 510 working days, which includes 260 working days for general work and 250 working days for plant establishment. Bids are due by December 16, 2026, and must be submitted with security equal to at least 10 percent of the bid. The contract is governed by the 2025 Standard Specifications and Special Provisions, requiring strict adherence to Buy America/Build America standards and the submission of environmental product declarations via the DIME portal. Contractors must designate a certified on-site safety representative and comply with prevailing wage rates as determined by the California Department of Industrial Relations. Key deliverables include high friction surface treatment, rubberized hot mix asphalt, and various concrete and fencing installations. Payment processing is managed through the Department's prompt payment monitoring system, and certified payroll records must be submitted electronically using LCPtracker Pro.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
SLED
Construction On State Highway In San Bernardino County In Redlands And Mentone From Occidental Drive To Crafton Avenue
Solicitation # 08-1K8604
The State of California Department of Transportation is soliciting bids for construction on a state highway in San Bernardino County, specifically in Redlands and Mentone from Occidental Drive to Crafton Avenue. This project, estimated at 14.9 million dollars, involves modifying signal and lighting systems at Route 38 and Crafton Avenue and is governed by 2025 Standard Specifications and Standard Plans. Bids must be submitted on a unit price basis via the Bid Express website by December 2, 2026, and must include bidder security equal to at least 10 percent of the bid. A mandatory virtual prebid outreach meeting via Cisco Webex is scheduled for November 12, 2026, at 10:00 am; failure to attend will result in the bid not being accepted. The contract emphasizes strict quality control and compliance, requiring a certified QC plan and adherence to Buy America standards, where manufactured products must contain over 55 percent U.S. components. Key technical requirements include MASH Test Level 3 compliance for temporary barriers and specific accuracy thresholds for video detection systems. The project also mandates the use of prevailing wages as determined by the California Department of Industrial Relations. To support small business and Disabled Veteran Business Enterprise (DVBE) participation, the department requires the successful bidder to report all small businesses hired as a result of the mandatory prebid meeting. Performance begins upon authorization, with a 72-hour notice required before starting job site activities.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS