Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

HMA Paving and Roadway Widening

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with the State of California Department of Transportation involves roadway widening and asphalt paving for prime contractors on Caltrans highway projects. The selected contractor will be responsible for executing widening and sidewalk details using Hot Mix Asphalt in accordance with ST_HMA specifications to deliver completed paved roadways and widened lanes. The project is located in Redlands, California, and requires the contractor to possess a Class A or C-12 license along with the necessary asphalt paving equipment. Interested parties must submit their responses by December 2, 2026.

General Info

Caltrans roadway widening and asphalt paving in Redlands; Class A/C-12 license; due 12/2/2026.

Documents

This scope was carved out of 08-1K8604.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In San Bernardino County In Redlands And Mentone From Occidental Drive To Crafton Avenue

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs roadway widening and asphalt paving for prime contractors on Caltrans highway projects. Executes widening and sidewalk details using Hot Mix Asphalt (HMA) per ST_HMA specifications. Requires asphalt paving equipment and Class A or C-12 license. Delivers paved roadway and widened lanes.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements encompass the installation of utilities, manholes, traffic signs, signals, lighting, and landscaping, along with support services for traffic control, storm water pollution prevention, and quality control. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237310
New
SLED
West Side Improvements - Bus Stops Package 1
Solicitation # 26-035
The City of Pueblo is soliciting bids for the West Side Improvements - Bus Stops Package 1 (Solicitation 26-035), a project focused on enhancing community connectivity and mobility. The scope of work involves the rehabilitation of 23 existing bus stops on the west side of Pueblo, including the installation of new concrete pads, sidewalks, curb and gutter, and ADA-compliant curb ramps. Additional improvements include the installation of new or replacement benches and illuminated bus stop signs, specifically utilizing Urban Solar PV Stop+ products. The project is funded through a Federal Highway Administration RAISE Grant and requires strict adherence to the Davis-Bacon Act for prevailing wages, Buy America/BABA requirements, and FHWA construction oversight standards. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid. Key requirements for bidders include a bid security of 5 percent of the grand total bid and the submission of performance and payment bonds prior to the Notice to Proceed. The project has a completion timeline of 180 days, with work commencing within three calendar days of contract execution. Contractors must comply with various federal and local mandates, including EEO bulletin board postings, FFATA reporting, and City of Pueblo licensing and sales tax regulations. All materials and workmanship are guaranteed by the contractor and surety for two years following final acceptance.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement is a federal construction project (STP-9901(663)) managed by the City of St. Louis Board of Public Service. The scope involves the reconstruction of the Union and Lindell Boulevard Bridge over Forest Park Parkway and the MetroLink Railway in St. Louis, Missouri. Key technical requirements include the installation of MSE retaining walls, steel H-piles, drilled shafts, and specific trackwork components such as transition tie spacing and rubberized gap fillers. The project is governed by a hierarchy of specifications, with Job Special Provisions taking precedence, followed by standards from the City of St. Louis, the Missouri Department of Transportation, and the Metropolitan St. Louis Sewer District. The contract carries a performance responsibility value of approximately 27.41 million dollars and a completion timeline of 452 working days, with liquidated damages set at 4,300 dollars per day. Bidders must provide a 5 percent bid deposit and ensure surety companies have a policyholder rating of A- or better and a financial rating of V or higher. Compliance requirements are extensive, including mandatory E-Verify participation, adherence to the Buy America Certification for iron and steel, and a ten-hour OSHA Construction Safety Program for on-site employees. Additionally, the project mandates strict adherence to Disadvantaged Business Enterprise (DBE) goals and the payment of the higher of the Missouri state or federal Davis-Bacon prevailing wage rates. Submissions must be made electronically via the Bid Express Online Portal, accompanied by a comprehensive package including a signed bid proposal, various affidavits, and detailed DBE participation forms. Final acceptance of the project is contingent upon meeting ADA and PROWAG standards, with specific quality control requirements for EPS fill and AASHTO accreditation for third-party concrete testing facilities.
City of St. Louis Board of Public Service

POSTED

about 8 hours ago

DEADLINE

in about 14 hours
View Details
NAICS: 237310
New
SLED
Construction of Sun Mountain Boulevard
Solicitation # 26-009
The City of Pueblo has issued solicitation 26-009 for the West Side Improvements Project, which primarily involves the construction of Sun Mountain Boulevard. This project consists of building a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street, featuring ADA-compliant curb ramps, storm sewers, water mains, and a double box culvert at the Wildhorse Creek Drainageway. Additionally, the broader initiative includes the implementation of three bus stop packages covering 67 locations. The project is funded through a U.S. Department of Transportation Federal Highway Administration RAISE Grant, necessitating strict adherence to federal requirements, including the Davis-Bacon Act for prevailing wages, Buy America and Build America Buy America (BABA) domestic sourcing preferences, and Title VI of the Civil Rights Act of 1964. The contract will be awarded to the responsible bidder providing the lowest and most responsive total base bid plus any selected alternates. Bidders must provide a bid bond for five percent of the grand total, and the successful contractor must furnish performance and payment bonds within ten business days of notice. Key performance requirements include a minimum of 100 training hours dedicated to workforce development and labor-management partnership programs. Technical compliance is governed by CDOT Standard Specifications and specific project addenda, with particular emphasis on geotechnical recommendations and strict packaging and storage standards for biotic soil amendments. Bids are submitted electronically via the OpenGov portal, with a final deadline of November 4, 2026.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
NH-099-1(033) Kamehameha HWY Intersection Improvements Kuala St
Solicitation # B27000703
Solicitation B27000703, titled NH-099-1(033) Kamehameha HWY Intersection Improvements Kuala St, is a project managed by the Hawaii Department of Transportation to improve the intersection of Kamehameha Highway and Kuala Street in the vicinity of Pearl City, Oahu. The scope of work includes the installation of traffic signals, concrete pavement, and highway lighting upgrades, as well as resurfacing and reconstructing weakened pavement, upgrading guardrails, adding drain lines and storm drain structures, and applying pavement markings and signage. The project must be completed within 663 calendar days from the start work date, and the award will be granted to the lowest responsible and responsive bidder. The contract is subject to various federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America (BABA) Act, and the Disadvantaged Business Enterprise (DBE) program. Required security includes bid, performance, and labor and material payment bonds, along with certifications for workers' compensation and temporary disability insurance. Final acceptance is contingent upon the Engineer's verification that all work is completed, including specific pavement smoothness requirements verified by a High-Speed Inertial Profiler. Proposals must be submitted via the HIePRO portal by the deadline of December 4, 2026.
Department of Transportation

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In San Diego County In Oceanside From Route 5/76 Separation To 0.3 Mile East Of Melrose Drive
Solicitation # 11-430914
Solicitation 11-430914 is a construction project for the State of California Department of Transportation involving highway work in Oceanside, San Diego County, from the Route 5/76 separation to 0.3 mile east of Melrose Drive. The scope of work primarily includes cold planing of AC pavement and RHMA-G overlay. The project timeline allows for 260 working days for general work and 250 working days for plant establishment, totaling 510 working days when including plant establishment. Bids must be submitted on a unit price basis via the Bid Express website by 2:00 p.m. on December 16, 2026, and must include bidder's security equal to at least 10 percent of the bid. The contract mandates strict adherence to 2025 Standard Specifications and Plans, including Buy America/Build America requirements and the use of LCPtracker Pro for electronic certified payroll records. Key technical requirements include specific packaging and stainless steel labeling for fiber optic cables, as well as rigorous quality control testing for bond strength and coefficient of friction. Contractors must designate an on-site safety representative with Cal/OSHA 30-hour or OSHA 510 certification. Payment is managed through the Department's prompt payment monitoring system, with specific requirements to pay subcontractors within 7 days and material suppliers within 30 days of receiving progress payments. Special provisions also cover the management of hazardous waste residue from yellow thermoplastic traffic stripes and compliance with ADA inspection reporting.
Highway, Street, and Bridge Construction

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In San Bernardino County In Redlands And Mentone From Occidental Drive To Crafton Avenue
Solicitation # 08-1K8604
The State of California Department of Transportation is soliciting bids for construction on a state highway in San Bernardino County, specifically in Redlands and Mentone from Occidental Drive to Crafton Avenue. This project, estimated at 14.9 million dollars, involves modifying signal and lighting systems at Route 38 and Crafton Avenue and is governed by 2025 Standard Specifications and Standard Plans. Bids must be submitted on a unit price basis via the Bid Express website by December 2, 2026, and must include bidder security equal to at least 10 percent of the bid. A mandatory virtual prebid outreach meeting via Cisco Webex is scheduled for November 12, 2026, at 10:00 am; failure to attend will result in the bid not being accepted. The contract emphasizes strict quality control and compliance, requiring a certified QC plan and adherence to Buy America standards, where manufactured products must contain over 55 percent U.S. components. Key technical requirements include MASH Test Level 3 compliance for temporary barriers and specific accuracy thresholds for video detection systems. The project also mandates the use of prevailing wages as determined by the California Department of Industrial Relations. To support small business and Disabled Veteran Business Enterprise (DVBE) participation, the department requires the successful bidder to report all small businesses hired as a result of the mandatory prebid meeting. Performance begins upon authorization, with a 72-hour notice required before starting job site activities.
Highway, Street, and Bridge Construction

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS