Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Control Room Architectural Modifications

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Control Room Architectural Modifications involves performing structural changes to the control room at the City of San Jose Resource Recovery Facility. The scope of work requires the removal of existing windows and the construction of permanent walls, including all necessary framing and interior finishes, to deliver a fully enclosed control room space. The project is located in San Jose, California, under NAICS code 236220. Interested parties must submit their responses by the deadline of November 10, 2026, for this effort supporting prime contractors on the facility's infrastructure improvements.

General Info

Subcontract for structural control room modifications at San Jose Resource Recovery Facility by 11/10/2026.

Place of Performance

San Jose, CA, 95113, USA

Set-Aside

NONE

Documents

This scope was carved out of 20261014087.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ESD 10646: Additional Filter Improvements Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San José
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural modifications to the control room for prime contractors on City of San José Resource Recovery Facility projects. Removes existing control room windows and constructs permanent walls using framing and interior finishes. Delivers enclosed control room walls.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis-McChord, Washington. The project, estimated between $1 million and $5 million, involves site preparation, the erection of the steel building, installation of a concrete slab, and the implementation of underground utilities and stormwater mitigation via an infiltration pond. Specialized requirements include the purchase and testing of dehumidifying equipment, a dry pipe fire suppression system compliant with NFPA 13 and UFC 3-600-01, and the installation of conduit to support a future photovoltaic solar system. The government will award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule with a total completion date not exceeding 360 days from the Notice to Proceed, as well as qualifications for key personnel. The project is subject to Davis-Bacon prevailing wage rates for Pierce County and requires both performance and payment bonds for awards exceeding $150,000. All construction must adhere to JBLM Department of Public Works engineering requirements, with specific quality standards including ISO 9001 and NETA ATS. Offers are due by October 18, 2026.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 15, 2026, with a response deadline of November 4, 2026. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to six Good Faith Effort (GFE) requirements. Mandatory documentation that must be submitted with the bid package includes proof of public notification, specifically online postings for 30 consecutive calendar days and a print newspaper posting for at least one day, as well as evidence of utilizing the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Documentation regarding outreach efforts, such as call logs and emails, may be submitted up to three business days after the bid closing date. Prime contractors are further required to flow these GFE requirements down to any subcontractors they may award.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of an existing 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation governed by Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. Managed by C. Overaa & Co., the project has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor (MBR) system, headworks, UV disinfection, and SCADA; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining existing wastewater treatment services and compliance with General Order/NOA requirements throughout the first two phases of construction. This solicitation is open to various small and disadvantaged business enterprises, including DBE, DVBE, SDVOSB, SBE, MBE, VOSB, and WBE. A significant local hiring goal is in place, requiring that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must agree to the Overaa standard agreement without modification and comply with specific insurance requirements, including a waiver of subrogation for workers compensation. Administrative details include the use of the Textura electronic invoicing system, with subcontractors responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 10 hours ago

DEADLINE

in 25 days
View Details

More opportunities from California → City of San José

Same awarding agency

NAICS: 237110
New
SLED
ESD 10646: Additional Filter Improvements Project
Solicitation # 20261014087
The Additional Filter Improvements Project (ESD 10646) is a design-build procurement issued by the City of San Jose Environmental Services Department to enhance the filtration facility at the Resource Recovery Facility. The primary objective is to extend the facility's useful life by up to thirty years and defer major capital investment while ensuring regulatory compliance. The scope of work includes repairing the filter effluent channel ceiling and walls, replacing 16 filter control panels and effluent valves, repairing large-diameter piping in filter galleries, replacing washdown piping loops, implementing HVAC improvements, installing a seismic shutoff valve for the gas system, replacing basement potable water pipelines, improving air scouring pipe supports, installing second-level transmitters, and replacing control room windows with walls. The selection process utilizes a Statement of Qualifications (SOQ) to shortlist entities based on a best-value evaluation. Applicants must pass a minimum qualification threshold, including the possession of a California Contractor’s Class B license and a minimum score of 56 out of 80 on scored questions. The weighted evaluation for the SOQ consists of key personnel experience (50%), entity and team experience (40%), and financial capability (10%). Key personnel requirements include a Superintendent with at least ten years of construction experience and a history of completing at least two water or wastewater infrastructure projects. The final contract award is tentatively scheduled for August 2027, with the SOQ submission deadline set for November 10, 2026. Awardees must comply with OCIP insurance policies and provide performance and payment bonds.
Water and Sewer Line and Related Structures Construction

POSTED

about 21 hours ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS