This Sources Sought opportunity from Department Of Defense was posted on March 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Control System Upgrades and Replacement Work on Tadano Infrastructure Solutions Co., Ltd. Land Portal Cranes, LC47 and LC48 at Berth 12 in the Commander Fleet Activities Yokosuka (CFAY), Japan
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
NAICS
Place of Performance
AP, JPNSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The purpose of this procurement is to acquire control system upgrades and replacement work on land portal cranes, LC47 and LC48 at Berth 12. The upgrades and replacement work includes but is not limited to upgrading the cranes control systems.
Upgrades and replacements include:
• Procure and install replacement items and materials for various electrical equipment, inverters, programmable logic controllers (PLC) to include wiring connections to the replaced items, and computer software.
Contractor shall be responsible for all applicable components and subcomponents to maintain accordance with the late manufacturer’s standard.
• Inspection for all applicable components and sub-components for conditions, cleanliness, damage, defects, deterioration, corrosion, proper operating record to load/unload for applicable capacities, electrical connections, and the locations/positions correction as required, and verify the equipment location is free of debris and/or flammable material, during and/or end of the work scheduled daily and the completion of the work. Validation is required for the designated crane conditions and applicable
capacities upon the receipt of task orders.
Note:
The Contractor shall record all operated works specifications and results, and submit it per SOW. Upon completion of above on-site works, put systems back to normal operation and check to ensure that equipment and systems are operating properly. Validate the operation/work entire area for the task order, and ensure all applicable power on/off device, on/off method, and positioned correctly before and after performing the work is the high priority for the Contractor protection in performance safety, and the site personnel/property safety.
More opportunities from Department Of Defense → Navfacsyscom Far East
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
