Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Convention Center HVAC Control Upgrades

Awarded
PW 9116State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
Install Pier D High Pressure Air System, NSBREM-724-A
Solicitation # N4425527RB003
Solicitation N4425527RB003 is a design-build project for the installation of a permanent high pressure air (HPA) system at Pier D, B724A of Naval Base Kitsap in Bremerton, Washington. The scope of work includes the design, construction, and commissioning of the system, specifically incorporating the existing HPA cross connection into a system supplied by HPA compressors on the south end of Pier D. The project requires the installation of HPA shore risers at five specific locations: East bollards 11, 59, and 101, and West bollards 47 and 59. All new piping must be installed under service grates with valves located topside. The project must adhere to Unified Facilities Criteria (UFC), ASME, and MIL-STD101C standards, with the most stringent requirement governing in the event of discrepancies. This is a 100% set-aside for 8(a) businesses located within SBA Region X, with an estimated construction magnitude between 1 million and 5 million dollars. The contract is a firm-fixed-price task order under an 8(a) Multiple Award Construction Contract (MACC), with a period of performance of 538 calendar days from award. Award will be based on price and MACC past performance. Key requirements include compliance with EM 385-1-1 safety standards, Davis-Bacon wage rates, and strict security protocols for base access and the handling of government data. Deliverables include a cost-loaded Network Analysis Schedule, comprehensive O&M data packages, and a Facility Data Workbook.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 238220
New
CBP#9772 HVAC Air Handling Unit (AHU) and Ductwork Cleaning Services
Solicitation # CBP#9772
Solicitation CBP#9772 is a subcontracting opportunity issued by Management & Training Corporation (MTC) for comprehensive HVAC Air Handling Unit (AHU) and ductwork cleaning services at the Edison Job Corps Center in Edison, New Jersey. The project focuses on restoring airflow and heat-transfer efficiency for the Kilmer and Edison dormitories by cleaning twelve AHUs, twenty-eight heating and cooling coils, and all associated supply, return, and outside-air ductwork. The contractor is responsible for providing all labor, equipment, and materials, including the installation of permanent access panels and the restoration of any affected building finishes. The estimated contract value ranges from $100,000 to $250,000, structured as a fixed-price, single lump sum contract with a performance period of 90 consecutive business days following the Notice to Proceed. Bids are due by November 17, 2026, and will be awarded based on overall best value. Mandatory requirements for consideration include a physical site visit, a detailed cost breakout, and the submission of a bid bond guarantee equal to 20% of the base bid for projects valued at $25,000 or more. Awarded contractors must comply with Davis-Bacon prevailing wage determinations for Middlesex County and provide performance and payment bonds. The opportunity is open to various SBA-certified small business categories, including VOSB, SDVOSB, WOSB, and HUBZone. Final acceptance is contingent upon a project completion report, post-cleaning photographs, operational verification records, and the submission of Operation and Maintenance manuals.
Edison Job Corps

POSTED

about 5 hours ago

DEADLINE

in about 8 hours
NAICS: 238220
New
CBP7787 ED1 RM 123 HVAC Compressor Replacement
Solicitation # CBP7787 ED1 RM 123
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace a failed HVAC/refrigeration compressor at the Sierra Nevada Job Corps Center in Reno, Nevada. The project, identified as CBP7787 ED1 RM 123, has an estimated value between 0 and 25,000 dollars. The scope of work is divided into four phases: preparation and environmental safety, including refrigerant recovery per EPA Section 608 regulations; demolition and removal of the failed unit; installation of an OEM-specified compressor and associated components; and system testing and commissioning. Bids are due by November 17, 2026, and require a mandatory physical site visit and signature on the attendance roster prior to submission. Award will be based on overall best value, with MTC serving as the sole judge of responsiveness. Bidders must provide a detailed cost breakout on their own letterhead. While bid bonds are not required for projects under 25,000 dollars, any bid equal to or exceeding that amount requires a bid bond guarantee of 20 percent from a surety company with at least an A- rating. Contractors must maintain general liability insurance of at least 1,000,000 dollars and worker's compensation with employer's liability limits of 500,000 dollars. Compliance with Washoe County wage determinations and various FAR clauses regarding safety, overtime, and small business representations is required. Final payment is contingent upon a successful final inspection and the submission of closeout documentation, including a certified payroll report and a certificate of release of liens.
Sierra Nevada Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in about 11 hours
NAICS: 238220
New
MJCC Multiple HVAC Replacement System
Solicitation # mjcc-multiple-hvac-replacement-system
The Montgomery Job Corps Center, through Education and Training Resources (ETR), is seeking quotes for a turnkey subcontracting project to replace multiple HVAC systems at its facility in Montgomery, Alabama. The scope of work involves the removal of existing equipment and the installation, testing, and commissioning of new units across several buildings, including Building A (4-ton), Building B (7.5-ton), Building E (10-ton), Building F (two 4-ton units), and Building G (various units ranging from 3.5 to 7.5 tons). Technical specifications for certain units require Energy Star certification, a minimum EER rating of 16, 90 percent efficiency furnaces, and the use of R-454B refrigerant. All work must comply with the National Electrical Code, NFPA Standard No. 101 Life Safety Code, and OSHA regulations. The project requires a 5 to 10 year warranty on equipment parts and a 2 year warranty on workmanship. Interested bidders must be registered in SAM.gov with a Unique Entity ID and provide Alabama business licenses, certificates of insurance, a W-9, and a completed FFATA form. Submission requirements include a detailed bid sheet with a cost breakdown, a proposed performance schedule, and an Anti-Lobbying Certification. The Davis-Bacon Act applies, necessitating the payment of prevailing wages and submission of certified payroll. Bonding requirements are tiered based on project value: projects between 35,000 and 150,000 dollars require a 100 percent payment bond and additional protection, while projects exceeding 150,000 dollars require both 100 percent performance and payment bonds. Bids close on November 27, 2026, at 12:00 PM CST, and award selection is at the sole discretion of ETR.
Montgomery Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 238220
New
Joliet Job Corps-Request for Quote HVAC Replacement Female Dormitory
Solicitation # joliet-job-corps-request-quote-hvac-replacement-female-dormitory
Management & Training Corporation (MTC), operating the Joliet Job Corps Center for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum subcontract to replace the HVAC system in the female dormitory. The project scope includes the removal and disposal of existing equipment and the installation of ten new Carrier furnace and air conditioning systems. Additionally, the contractor must install and integrate a Pelican Building Automation System (BAS) across eleven units, including the ten new systems and one existing unit. The estimated contract value ranges from $250,000 to $500,000, with work performed at 1101 Mills Road, Joliet, Illinois. Bids must be submitted to Frances McGraw by November 23, 2026, and must include a detailed cost breakout on company letterhead and the MTC Bid for Lump Sum Contract form. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. Award decisions will be based on overall best value. The contract is subject to the Davis-Bacon Act, requiring compliance with specific Illinois prevailing wage rates and the submission of weekly certified payroll reports for payment. Contractors must maintain general liability insurance of at least $1,000,000 per occurrence and worker's compensation with employer's liability limits of $500,000. Compliance with various Federal Acquisition Regulations is required, including Buy American and anti-trafficking provisions. Final acceptance is contingent upon a joint site inspection, the submission of a Notice of Final Completion, and the delivery of two sets of operation and maintenance manuals along with manufacturer and workmanship warranties.
Joliet Job Corps

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project focuses on eliminating severe piping leaks and replacing failing infrastructure in Building CM (Men's Dormitory), Building CW (Women's Dormitory), and Building D (Recreation). The scope of work includes the demolition and disposal of existing distribution piping and air compressors, the installation of a new code-approved piping network and properly sized compressor, and rigorous operational and leak testing. All work must adhere to NFPA 25 (2023 Edition) standards and local, state, and national codes. The period of performance is 30 consecutive business days following the written Notice to Proceed. Bids are due by December 1, 2026, and must be based on a required physical site visit. Evaluation is based on overall best value. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, and the awarded contractor will be required to provide performance and payment bonds from an A-rated surety. Required submission documents include a detailed cost breakout, proof of insurance, a UEI number, and a completed SF 1413 form. The contract is subject to various federal regulations, including Davis-Bacon prevailing wage rates, FAR requirements for business size certification and debarment disclosure, and Job Corps-specific mandatory training and privacy breach notification requirements. Final payment is contingent upon a joint substantial completion inspection, a final inspection, and the submission of certified payroll reports and operation and maintenance manuals.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 238220
New
Inland Empire Job Corps-Request for Quote HVAC Replacement Cafeteria & OA CTS
Solicitation # inland-empire-job-corps-request-quote-hvac-replacement-cafeteria-oa-cts
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to replace packaged HVAC units with gas heating at the Inland Empire Job Corps Center in San Bernardino, California. The project focuses on the Cafeteria and OA/CTS areas and includes the removal of existing units, refrigerant recovery per EPA regulations, installation of high-efficiency units, and the modification of gas piping, ductwork, and electrical disconnects. This is a fixed-price, single lump sum contract with an estimated value between $25,000 and $100,000. The selected contractor must complete all work within 60 consecutive business days following the written Notice to Proceed. Bids are due by November 23, 2026, and must be submitted via email to Fran McGraw. To be considered, bidders are required to conduct a physical site visit and provide a detailed cost breakout on company letterhead. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety company. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of worker classifications. Additionally, contractors must provide a Unique Entity ID (UEI), self-certify their small business status, and adhere to OSHA safety standards and federal environmental regulations. Award decisions will be based on overall best value.
Inland Empire Job Corps

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
CBP7792 Cafeteria Hot Water Heater Replacement
Solicitation # CBP7792
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the cafeteria hot water heater at the Sierra Nevada Job Corps Center in Reno, Nevada. The project requires a licensed plumbing contractor to isolate, remove, and dispose of an existing failing commercial natural gas-fired water heater and install a new commercial-grade 125-gallon natural gas-fired unit, specifically a Bock Model OT300N-A-H20 or an approved equivalent. The estimated contract value ranges from $25,000 to $100,000, with award decisions based on overall best value, considering price, quality, delivery schedule, and relevant experience. Bidders must submit a signed MTC Bid for Lump Sum Contract form along with a detailed cost breakout on company letterhead, proof of insurance, and three references. For bids equal to or exceeding $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety. Compliance with federal labor standards is mandatory, including adherence to Wage Determination NV20250040 and the submission of an SF 1413 Statement and Acknowledgement. Additionally, first-tier subcontractors with awards over $45,000 must disclose any federal debarment or suspension status per FAR 52.209-6. The contractor is responsible for all installation, testing of safety controls, and obtaining necessary inspections. Final deliverables include two sets of operation and maintenance manuals, manufacturer and installer warranties, and a final certified payroll report. Payment will be processed via pay applications using AIA G702 and G703 forms, with a standard payment term of ten days after receipt of a valid invoice. All work must comply with federal standards, including Buy American requirements and safety regulations.
Sierra Nevada Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
CBP#10027 Replace Cafeteria Waste Line & Floor Restoration
Solicitation # CBP#10027
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontracting opportunity at the Edison Job Corps Center in Edison, New Jersey. The project, identified as CBP#10027, involves the replacement of compromised underground waste piping serving the cafeteria food line and subsequent floor restoration. The scope of work includes saw-cutting the existing floor around 3-inch drains, removing and replacing piping, backfilling, and ensuring the final system is functional and code-compliant. The estimated price range for this project is up to 25,000 dollars, with a required performance period of 30 consecutive business days following a written Notice to Proceed. Bids are due by November 16, 2026, and must be submitted to Wendy Lawrence. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. Required documentation includes the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and the MTC Supplier Packet. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, along with performance and payment bonds from a surety company with at least an A- rating. This opportunity is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wage and fringe benefit rates for Middlesex County. Award decisions will be based on overall best value, with MTC serving as the sole judge of responsiveness. Failure to complete work by the agreed date may result in liquidated damages of 100 dollars per consecutive calendar day.
Edison Job Corps

POSTED

about 5 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The City of San Jose Public Works Department has awarded contract PW 9116 to Mesa Energy Systems, Inc. for HVAC control upgrades at the San Jose McEnery Convention Center. The project involves replacing end-of-life Tridium AX web-based building automation systems and JACE FX hardware with a new Building Management System and controllers utilizing the advanced BACnet IP protocol. The engineer's estimate for the project was 1,960,000.00 dollars for the base bid and 140,000.00 dollars for Bid Alternate No. 1. The contract required bidders to hold valid California contractor licenses classification B and C20 and be registered with the Department of Industrial Relations. Compliance mandates included adherence to the Project Labor Agreement, prevailing wage requirements, the City's Wage Theft Prevention Policy, and CARB In-Use Off-Road Diesel-Fueled Fleets regulations. The awarded contractor is required to provide a Contractor's Payment Bond and a Bond for Faithful Performance, each for 100 percent of the contract amount.

General Info

Mesa Energy Systems will upgrade HVAC controls at San Jose McEnery Convention Center.

Contract Value

$0

Place of Performance

CA, USA

Set-Aside

NONE

Award Issued Date

Contract End Date

April 29, 2026

Documents

1
PDF, Low priorityaward
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 15 days
  • Water Pump ReplacementOpen now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San José - Public Works
Contacts1 person available
OfficeN/A

Full Description

Show more
Convention Center HVAC Control Upgrades PW 9116 Closing Date: 06/04/2026 11:00:00 AM PT Detail: Public Works Department CIP Procurement Sign up to see this detail / Sign up to see this detail NOTICE TO CONTRACTORS NOTICE IS HEREBY GIVEN that the City of San José (“City”) seeks sealed bid proposals in accordance with the following. Project Name: 9116 - Convention Center HVAC Control Upgrades (“Project”) Description of Work: The Project generally involves upgrading the HVAC controllers and providing a new Building Management System (BMS) at the San Jose McEnery Convention Center ("Convention Center"). The Convention Center will be upgraded to the industry’s most advanced standards, BACnet IP protocol, and the controllers. The Tridium AX web-based building automation system and the JACE FX hardware were initially installed in 2012, and have reached its end of life. Engineer's Estimate: $1,960,000.00 (Base Bid), $140,000.00 (Bid Alternate No. 1) FILING OF BIDS All proposals must be delivered to the City via Biddingo (www.biddingo.com/sanjose), on or before 11:00 a.m. on Thursday , June 4, 2026. Bidders are responsible for ensuring that their bid is submitted prior to the deadline specified above. To download documents and start your submission go to Bid Documents / Online Submission. For technical support, please contact Biddingo directly at Sign up to see this detail or Sign up to see this detail or via email at Sign up to see this detail. A representative of the Director of Public Works will publicly open and declare the aggregate bid of each bidder, using the Zoom virtual meeting platform, shortly after the filing deadline. Interested parties can access the virtual bid opening by visiting https://www.sanjoseca.gov/CIPBids. OBTAINING PROCUREMENT DOCUMENTS The City is using Biddingo, an online bid solicitation website, to facilitate this procurement. This procurement is registered on Biddingo (https://www.biddingo.com/sanjose) under the bid number and bid name above and has the following commodity code classifications(s): 100302 - Construction - Energy Systems 100317 - Construction - Building 100305 - Construction - Other 100402 - Consulting Services- Constructing and Building Management 025000 - Electrical Services 100903 - Engineering Services- Electrical 100905 - Engineering Services- Mechanical 027000 - Engines - Stationary 047000 - Measurement and Control Devices 051000 - Miscellaneous All documents and information related to this procurement, including the Project plans and specifications, are on the Biddingo website under the bid number and bid name above. Once registered, bidders can view and download information regarding this procurement, including the bid and contract documents, as well as submit questions related to the bid and contract documents. Once a bidder views or downloads documents for this bid, the bidder becomes a “document taker.” Biddingo will send “document takers” a notification every time the City posts an addendum, responds to a question and/or provides new information related to this procurement. Each bidder is responsible for selecting the appropriate notification options related to its Biddingo account. Following review by the City, proposals will be uploaded to Biddingo. BIDDER’S RESPONSIBILITY TO CHECK FOR UPDATES Bidders must periodically check Biddingo to make sure the bidder has the most recent information about this procurement. REQUESTS FOR INFORMATION Bidders must submit questions or requests for information concerning any part of this bid in writing to the City via Biddingo. The City will not respond to any communication or question submitted directly to City staff or City consultants. Submit questions via Biddingo no later than Thursday, May 28, 2026 at 11:00 am. All bidders are expected to have read and understand the “Procurement and Contract Process Integrity and Conflict of Interest,” Section 7 of the Consolidated Open Government and Ethics Provisions adopted on April 9, 2024, a complete copy of which can be found at https://records.sanjoseca.gov/Resolutions/RES2024-99.pdf. Any bidder who violates this policy will be subject to disqualification. The grounds for disqualification include contact regarding this procurement with any City official or employee or evaluation team member other than the Procurement Contact or Purchasing Officer from the time of issuance of this solicitation until the end of the protest period. RELIANCE UPON INFORMATION Bidders can only rely on information obtained through Biddingo. Bidders can not rely on any other written or oral statements of the City or its officers, directors, employees or agents regarding this procurement. In the event a bidder obtains information about this procurement through any means other than Biddingo, the City will not be responsible for the completeness, accuracy or timeliness of the final bid proposal. SITE VISIT A non-mandatory site visit will be held on Friday , May 8th, 2026 at 09:00 AM at the Team San Jose Administrative Offices, 408 S Almaden Blvd, San Jose, CA 95113. The meeting location for the site visit will be the main entrance of the Team San Jose Administrative Offices at the address listed above. Potential bidders should plan to park at the San Jose McEnery Convention Center lot and walk to the meeting location. The entrances to the parking lot can be found on Market Street and South Almaden Boulevard, between Balbach/Viola and West San Carlos. The South Almaden Boulevard entrance is the closest to the meeting location and is the recommended access route. This site visit will be held to allow potential bidders to view the project location. No questions will be answered at this meeting. CONTRACTOR’S LICENSE REQUIREMENTS All prospective bidders are hereby cautioned that the Contractor’s State License Law regulates contractor licensing matters. The Contractor, in its bid proposal, shall be required to disclose its license type, number, and expiration date. Bidders must have a valid California contractor’s license, classification B and C20 to bid this project. CONTRACTOR DIR REGISTRATION REQUIREMENTS Bidder and all designated subcontractors must be registered with the Department of Industrial Relations in accordance with California Labor Code Sections 1725.5 and 1771.1. The City will not accept a bid in which the bidder or any of the designated subcontractors are not registered in accordance with Sections 1725.5 and 1771.1. See Section 2-1.17 of the Special Provisions for the “registration” requirements applicable to the contract. PREVAILING WAGES (Municipal Affair) This project is a “public works” as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled “Prevailing Wage Requirements for City Contracts Involving Public Works,” the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City’s Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work. See Section 7-1.01a(3) of the Special Provisions for the prevailing wage requirements applicable to the contract. Copies of the prevailing rate of per diem wages and the general prevailing wage rates for holiday and overtime work in effect for this project are on file and available for your review from the City’s Office of Equality Assurance at Sign up to see this detail. WAGE THEFT Bidders are expected to have read and understand the “Wage Theft Prevention Policy” adopted on April 11, 2023. A complete copy of Resolution No. RES 2023-96 can be found at https://www.sanjoseca.gov/home/showpublisheddocument/96686/638176810489930000. Any Bidder in violation of the City’s “Wage Theft Prevention Policy” will be disqualified. PROJECT LABOR AGREEMENT This project is subject to the Project Labor Agreement (“PLA”) entered between the City of San José and the Santa Clara and San Benito Counties Building & Construction Trades Council, as may be amended from time to time. The awarded Bidder will be required to agree to the terms of the agreement by signing Addendum A – Agreement to be Bound, of the PLA agreement, and submit at the time the contract is executed. See Attachment 6 for a copy of the PLA including Addendum A. NONDISCRIMINATION/NONPREFERENTIAL TREATMENT The Nondiscrimination/Nonpreferential Treatment requirements of Chapter 4.08 of the San Jose Municipal Code apply to this project. BID SECURITY Each bid must be accompanied by an electronic pdf copy of a bidder’s bond in the sum of not less than 10% of the total aggregate amount of the bid. Bonds must be issued by a surety that is an “admitted surety insurer” in the State of California and must name the City of San José as beneficiary. Bonds must be accompanied by an electronic pdf copy of the surety’s power of attorney and a notary acknowledgement for the surety’s signature. Bidders must retain the original wet-signed bidder’s bond and provide it to the City upon request. IN-USE OFF-ROAD DIESEL-FUELED VEHICLES REQUIREMENTS This project is subject to the California Air Resources Board (CARB) In-Use Off-Road Diesel-Fueled Fleets requirements found in California Code of Regulations, Title 13, Div. 3, Ch. 9, Art. 4.8, Sec. 2449 (“CARB Off-Road Regulations”). Bidders must submit valid Certificate(s) of Reported Compliance for itself and all designated subcontractor(s) that are using fleet(s) subject to the CARB Off-Road Regulations in performance of this contract. Certificates of Reported Compliance are obtained through CARB’s Diesel Off-Road Online Reporting System (DOORS). For technical support, please contact CARB directly at Sign up to see this detail or via email at Sign up to see this detail. BOND REQUIREMENTS Bidder’s attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor’s Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San José. Bonds must be issued by a surety that is an “admitted surety insurer” in the State of California possessing a power of attorney and shall name the City of San José as beneficiary. The Contractor’s Faithful Performance Bond shall be for 100% of the contract amount. The Contractor’s Payment Bond shall be for 100% of the contract amount. DEPOSIT OF SECURITIES IN LIEU OF RETENTION Pursuant to the terms and conditions set forth in Public Contracts Code Section 22300, the contractor may substitute certain securities for any money withheld by City as retention to ensure contractor’s performance under the contract. Such substitution of securities in lieu of retention shall be at the contractor’s request and at contractor’s sole expense. The securities shall be in an amount equivalent to the retention to be released.

More opportunities from California → City of San José - Public Works

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS