Cooling Tower Replacement

Active
300NLACoolingTower-PresolicitationNoticeFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the design-build replacement of four two-cell cooling towers at the federal building located at 300 N. Los Angeles St., Los Angeles, CA. The work is divided into two phases: Phase 1 focuses on replacing Cooling Towers 1 and 2, and Phase 2 addresses Cooling Towers 3 and 4. The project requires performing structural repairs or replacements of sub-platforms and main platforms while maintaining building occupancy without disruption. Key tasks include hazmat abatement based on government-provided surveys, installation of temporary cooling towers with necessary utilities and protective measures, demolition and removal of old cooling towers and structural components using cranes, fabrication and installation of corrosion-resistant support steel frames, structural assessments and reinforcements as needed, and the integration of vibration isolators and seismic bracing. The scope also includes the repair of roofing elements, installation of new power and plumbing lines to support the new cooling towers, reconnection and functional testing of Building Automation System (BAS) controls for pumps and towers, and ensuring all construction adheres to applicable codes and inspection standards. Special inspection of welds and bolted connections is mandated to verify structural integrity. The project emphasizes sustainable design and construction strategies where practical. The anticipated contract value is between $5 million and $10 million, and a full and open request for proposal was expected to be released in early 2023. The contracting agency is the General Services Administration’s PBS Region 9 Amd Capital Projects office.

General Info

Design-build replacement of four cooling towers in two phases with structural repairs, hazmat abatement, and system upgrades.

Agency

General Services Administration → Pbs R9 Amd Capital ProjectsView Agency

NAICS

236220 - Commercial and Institutional Building Construction View NAICS

Place of Performance

Los Angeles, CA, 90012, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhasePresolicitation
Posted

Presolicitation

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R9 Amd Capital Projects
Contacts1 person available
OfficeSAN FRANCISCO, CA, 94102, USA
Organization / Agency
General Services Administration → Pbs R9 Amd Capital Projects
View Agency Profile
Office AddressSAN FRANCISCO, CA, 94102, USA
Contacts

Full Description

Show more
The contract is anticipated to involve the following work to be done at the federal building at 300 N. Los Angeles St., Los Angeles, CA: The overall strategic project goal of the Design-Build (DB) Contractor is for the replacement of (4) 2 Cell Cooling Towers and to perform structural sub-platform and main platform repairs and/or replacement within an occupied building without disruption to occupants and to utilize sustainable design and construction strategies where applicable and practical. Phase 1 Cooling Tower 1 and/or 2: Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Furnish and set-up (1) 500 Ton temporary skid mounted Cooling Tower adjacent to the building on Los Angeles St. within a lockable chain link fence enclosure affording adequate NEC and service clearances, and pipe temporary bypass CWS/R lines to POCs in the basement. Provide temporary make-up water (MUW) and drain down piping indirectly to the nearest approved sanitary sewer. Provide temporary electrical power via a 200 KVA skid mounted genset and electrical disconnect and service power to the skid mounted Cooling Tower. Provide biocidal and other chemical treatment as needed for a temporary cooling tower. Obtain necessary permits and special inspections if/as required from the City of Los Angeles Public Works. Disconnect controls from CT-1 and/or 2, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-1 and/or 2 and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-1 and/or 2 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-1 and/or 2 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to-endpoint testing and verification. Phase 2 Cooling Tower 3 and/or 4: Replace the (2) existing nominal 900-ton Cooling Towers (CTs) in one or two phases of construction. Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Disconnect controls from CT-3 and/or -4, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-3 and/or -4 and their respective CW pumps and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-3 and/or -4 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or an elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-3 and/or -4 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to- endpoint testing and verification. (Note: There is no BAS programming nor graphics scope) The anticipated magnitude of the contract is $5M to $10M. A full and open request for proposal is anticipated to be published late February or early March 2023.

Similar Contracts

NAICS: 236220
New
Federal
Northeastern Regional Multiple Award Construction Contract (NRMACC)The Northeastern Regional Multiple Award Construction Contract, or NRMACC, is a small business set-aside contract designed to deliver general construction services across NASA’s northeastern facilities, specifically the Glenn Research Center, Goddard Space Flight Center, and Langley Research Center. The contract will support a broad range of construction activities including structural, civil, mechanical, electrical, environmental, and architectural work, with specific tasks outlined in individual task orders issued under the contract. All work is intended to serve the infrastructure needs of these federally operated research centers, with performance locations to be determined per task order. This procurement is managed by the Glenn Research Center under the National Aeronautics and Space Administration, with all contracting opportunities reserved exclusively for small businesses as defined by the Small Business Administration under FAR 19.5. The North American Industry Classification System code 236220 applies, categorizing it under commercial and institutional building construction. Point of contact for general inquiries is Christopher M. Colwell, while Robert E. Watts serves as the Small Business Specialist. The contract was forecasted for release on October 1, 2026, and details can be accessed through NASA’s official procurement forecast portal.
Glenn Research Center

POSTED

in 3 months

DEADLINE

N/A
View Details
NAICS: 236220
New
SLED
Checkpoint Security Grill Replacement - DBBThe Port of Seattle’s Aviation Project Management Group is seeking contractors to provide complete design, permitting, and construction services for the replacement of the Checkpoint 5 security grill. The project requires full compliance with TSA CRPG Section 3-5 standards, including site assessment, preparation of detailed design drawings and specifications, and submission for all necessary regulatory reviews and permit approvals. The contractor will be responsible for the safe removal and proper disposal of the existing grill, followed by the fabrication and installation of the new system. Integration with existing structural, electrical, and security badge access infrastructure is mandatory, requiring precise coordination to maintain operational integrity during and after installation. All work must be performed with minimal disruption to airport operations and in close collaboration with stakeholders, including security and operational personnel. The contract is issued under NAICS code 236220 for commercial and institutional building construction and is managed by the Port of Seattle through its Aviation Project Management Group. Primary contact for inquiries is Yanet Maldonado, with Collette Deardorff serving as the Project Manager. The solicitation was posted on July 4, 2026, and interested parties can access additional information through the Port’s official solicitation portal. The project location is within the Port of Seattle’s aviation facilities, though specific site details are not outlined in the posted data. The contract will be executed under a design-bid-build delivery model, with no set-aside provisions currently indicated. Timely submission and adherence to all technical and procedural requirements are essential for qualification and selection.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 236220
New
SLED
Rental Car Facility (RCF) Customer Service Building (CSB) Re-DemisingThe Port of Seattle’s Aviation Project Management Group is preparing to revise the Rental Car Facility Customer Service Building to accommodate a new concession agreement and tenant construction scheduled to begin June 1, 2027. Key scope elements include updating wayfinding signage to reflect new tenant layouts, constructing a new break room and flex space for transit operations, renovating existing restrooms in the Customer Service Building, replacing outdated car wash equipment in Quick Turn Around areas, and replacing expansion joints on the fifth-floor plaza. Structural repairs are also required to address existing cracking and repair post-tensioned cables to ensurelong-term integrity of the building. This work, classified under NAICS code 236220 for commercial and institutional building construction, is part of a broader effort to modernize and reconfigure the facility for future operational demands. The project is being managed by the Port of Seattle with primary point of contact Angela Peterson and project manager Julia Ruzon overseeing execution. The solicitation was posted in July 2026, indicating active preparation for upcoming procurement, though no formal solicitation number has been assigned. Work will focus on enhancing functionality, safety, and tenant experience within the existing facility while aligning infrastructure with upcoming concession needs.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details