Cooling Tower Replacement

Active
300NLACoolingTower-PresolicitationNoticeFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the design-build replacement of four two-cell cooling towers at the federal building located at 300 N. Los Angeles St., Los Angeles, CA. The work is divided into two phases: Phase 1 focuses on replacing Cooling Towers 1 and 2, and Phase 2 addresses Cooling Towers 3 and 4. The project requires performing structural repairs or replacements of sub-platforms and main platforms while maintaining building occupancy without disruption. Key tasks include hazmat abatement based on government-provided surveys, installation of temporary cooling towers with necessary utilities and protective measures, demolition and removal of old cooling towers and structural components using cranes, fabrication and installation of corrosion-resistant support steel frames, structural assessments and reinforcements as needed, and the integration of vibration isolators and seismic bracing. The scope also includes the repair of roofing elements, installation of new power and plumbing lines to support the new cooling towers, reconnection and functional testing of Building Automation System (BAS) controls for pumps and towers, and ensuring all construction adheres to applicable codes and inspection standards. Special inspection of welds and bolted connections is mandated to verify structural integrity. The project emphasizes sustainable design and construction strategies where practical. The anticipated contract value is between $5 million and $10 million, and a full and open request for proposal was expected to be released in early 2023. The contracting agency is the General Services Administration’s PBS Region 9 Amd Capital Projects office.

General Info

Design-build replacement of four cooling towers in two phases with structural repairs, hazmat abatement, and system upgrades.

Agency

General Services Administration → Pbs R9 Amd Capital ProjectsView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Los Angeles, CA, 90012, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhasePresolicitation
Posted

Presolicitation

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R9 Amd Capital Projects
Contacts1 person available
OfficeSAN FRANCISCO, CA, 94102, USA
Organization / Agency
General Services Administration → Pbs R9 Amd Capital Projects
View Agency Profile
Office AddressSAN FRANCISCO, CA, 94102, USA
Contacts

Full Description

Show more
The contract is anticipated to involve the following work to be done at the federal building at 300 N. Los Angeles St., Los Angeles, CA: The overall strategic project goal of the Design-Build (DB) Contractor is for the replacement of (4) 2 Cell Cooling Towers and to perform structural sub-platform and main platform repairs and/or replacement within an occupied building without disruption to occupants and to utilize sustainable design and construction strategies where applicable and practical. Phase 1 Cooling Tower 1 and/or 2: Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Furnish and set-up (1) 500 Ton temporary skid mounted Cooling Tower adjacent to the building on Los Angeles St. within a lockable chain link fence enclosure affording adequate NEC and service clearances, and pipe temporary bypass CWS/R lines to POCs in the basement. Provide temporary make-up water (MUW) and drain down piping indirectly to the nearest approved sanitary sewer. Provide temporary electrical power via a 200 KVA skid mounted genset and electrical disconnect and service power to the skid mounted Cooling Tower. Provide biocidal and other chemical treatment as needed for a temporary cooling tower. Obtain necessary permits and special inspections if/as required from the City of Los Angeles Public Works. Disconnect controls from CT-1 and/or 2, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-1 and/or 2 and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-1 and/or 2 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-1 and/or 2 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to-endpoint testing and verification. Phase 2 Cooling Tower 3 and/or 4: Replace the (2) existing nominal 900-ton Cooling Towers (CTs) in one or two phases of construction. Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Disconnect controls from CT-3 and/or -4, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-3 and/or -4 and their respective CW pumps and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-3 and/or -4 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or an elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-3 and/or -4 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to- endpoint testing and verification. (Note: There is no BAS programming nor graphics scope) The anticipated magnitude of the contract is $5M to $10M. A full and open request for proposal is anticipated to be published late February or early March 2023.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 15 hours ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS