Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on June 24, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Correct Critical Safety Hazards & Rehab the Awahnee Hotel NHL

Awarded
P15PS00437Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 04, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to provide proof of these specific postings and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Prime contractors are further required to flow these GFE obligations down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project is scheduled for completion within 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor system, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing wastewater treatment plant in service during the first two phases of construction. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. There is a specific local hiring goal requiring that 50 percent of the total construction workforce consist of residents from Monterey, San Benito, and Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are required to accept the standard Overaa agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation work using rigid inclusions and load transfer mats. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and documents.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC has issued a price-based Request for Bid for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes structural modifications such as saw cutting reinforced concrete walls and installing headers, as well as exterior excavation and the construction of retaining walls. A critical requirement of the project is the creation of an ADA-accessible route featuring the necessary ramps, landings, and handrails to reach the existing grade or sidewalk. The contractor is also responsible for weatherproofing the installation and restoring all disturbed interior and exterior surfaces. Bids are due by November 20, 2026, with a projected contract award date of December 4, 2026, and a completion target of March 31, 2027. This is a firm fixed-price solicitation where the lowest responsive and qualified bidder will be selected, subject to budgetary limits and Indian preference requirements under Chapter 10-3 of the Colville Tribal Code. Preference-eligible bidders may be awarded the contract even if their bid is higher than the lowest responsive bid, provided it falls within specific allowable differentials based on the total project cost. Qualified bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Mandatory insurance requirements include Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability of 1 million dollars per accident, and Worker's Compensation as required by Washington state law. Final project acceptance by Colville Fuels is contingent upon the exit being fully operational and receiving all necessary approvals from the Authority Having Jurisdiction.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
2026036-BID3289 ROADS AND BRIDGES ADMINISTRATION BUILDING RENOVATION
Solicitation # 2026036-BID3289
The Columbia County Board of Commissioners is soliciting bids for the renovation of the Columbia County Roads and Bridges Administration Building located in Appling, Georgia. The project aims to improve the facility's functionality and condition through the renovation of office, support, and common areas. The scope of work includes selective demolition, the installation of new finishes, and necessary modifications to mechanical, electrical, and plumbing systems to accommodate a new building layout. This is a lump sum contract requiring bidders to hold both a State of Georgia General Contractor's License and a Columbia County business license. A critical requirement for eligibility is attendance at the mandatory on-site pre-bid meeting on November 4, 2026, at 10:00 AM; failure to attend or arriving more than ten minutes late will result in automatic disqualification. Bids must be submitted electronically via the Bonfire portal by November 19, 2026, at 12:00 PM. Proposals must include a bid bond of at least five percent of the lump sum bid. Upon award, the successful contractor must provide performance and payment bonds equal to one hundred percent of the contract amount within ten days. The procurement process is managed by the Columbia County Procurement Department, with Glenn O'Steen serving as the Procurement Manager.
Columbia County Board of Commissioners

POSTED

about 8 hours ago

DEADLINE

in 29 days

AI Contract Overview

Show more

Solicitation P15PS00437, issued by the Department of the Interior's DSC Contracting Services Division, is a construction procurement for the project to Correct Critical Safety Hazards and Rehabilitate the Ahwahnee Hotel NHL located in Yosemite National Park, California. The scope of work involves comprehensive rehabilitation and safety upgrades to a National Historic Landmark, guided by extensive Historic Structures Reports and Cultural Landscape Reports to ensure the preservation of the hotel's rustic design and architectural significance. Technical requirements include detailed demolition plans, electrical and fire protection upgrades, plumbing rough-ins, and specific interior and exterior finishes. The project also incorporates critical safety and structural elements, including seismic rehabilitation based on geotechnical investigations and the correction of concrete deficiencies through crack injection. The procurement process utilizes a sealed bid format via Standard Form 1442 and includes a detailed price schedule for base work and options. Contractors must adhere to Davis-Bacon wage determinations for California and comply with federal regulations, including FAR clauses prohibiting internal confidentiality agreements that restrict reporting fraud, waste, or abuse. Technical specifications are further clarified through construction documents and amendments, such as Amendment No. 3, which provides specific material requirements for pipe railing sizes and high-density styrofoam fill. Bidders are required to provide bonding and insurance as specified in the proposal submission package and must coordinate work with the National Park Service to maintain the integrity of the historic site.

General Info

Contract Value

$3,803,428

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Yosemite National Park, Mariposa County, California, YOSEMITE NATIONAL PARK, CA, 95389-0577, USA

Set-Aside

NONE

Award Issued Date

Documents

52

100% Final Construction Documents – Demolition Plan Sheets A16

PDF, High priority: read this firstsow
High

Ahwahnee Historic Structures Report – Architectural Recommendations: Interiors

PDF, High priority: read this first24 pages · sow
High

Ahwahnee Hotel Seismic Rehabilitation Alternatives - Part 2

PDF, High priority: read this first111 pages · sow
High

Ahwahnee Questions and Answers

DOC, High priority: read this first7 pages · q-and-a
High

Architectural Drawings and Detail Plans

PDF, High priority: read this firstspecifications
High

CA150029 Revised Wage Rates 04/24/2015

DOC, High priority: read this first53 pages · wage-determination
High

California Davis-Bacon Wage Determination CA150029 (03/27/2015)

DOC, High priority: read this first115 pages · wage-determination
High

Electrical Demo Drawings - East Wing/South Wing

PDF, High priority: read this firstdrawings
High

Electrical Drawings - Final CDs (Pages 130-139)

PDF, High priority: read this firstspecifications
High

Exterior Elevation and Section Drawings

PDF, High priority: read this firstspecifications
High

Final Construction Documents - Demolition Notes and Site Plan

PDF, High priority: read this firstspecifications
High

Final Construction Documents Drawings

PDF, High priority: read this firstsow
High

Final Construction Documents - Lighting Legend Sheet

PDF, High priority: read this firstsow
High

Final Construction Drawings – Interior Finish & Framing Sheets

PDF, High priority: read this firstconstruction-drawings
High

Fire Protection Drawings and Electrical Symbols

PDF, High priority: read this firstspecifications
High

Floor Plan Key Notes and Final Construction Documents

PDF, High priority: read this firstsow
High

Food Service Equipment Specifications Brochure

PDF, High priority: read this first63 pages · specifications
High

Historic Structures Report Appendix D: Stained and Leaded Glass Survey (Jan 2011)

PDF, High priority: read this first25 pages · sow
High

P15PS00437 Pre-Proposal Conference and Site Visit

PPTX, High priority: read this first30 pages · rfp
High

P15PS00437 Proposal Submission Package - Ahwahnee Hotel Rehabilitation

PDF, High priority: read this first13 pages · rfp
High

Plumbing Rough-In Plan and Schedule

PDF, High priority: read this firstsow
High

Preliminary Seismic Hazards Assessment for Ahwahnee Hotel

PDF, High priority: read this firstsow
High

SF-1442 Solicitation, Offer, and Award

PDF, High priority: read this first2 pages · ifb
High

Solicitation Clauses and Contract Provisions

DOCX, High priority: read this first109 pages · solicitation
High

The Ahwahnee Cultural Landscape Report, March 2011

PDF, High priority: read this first59 pages · sow
High

The Ahwahnee Historic Structures Report (January 2011)

PDF, High priority: read this first45 pages · sow
High

T&S Brass and Glastender product specifications sheets

PDF, High priority: read this first227 pages · specifications
High

YOSE-154910C Final Construction Documents - Specifications

PDF, High priority: read this first557 pages · specifications
High

9_YOSE_154910C-FinalCDs-Pgs90-111_Drawings

PDF, Low priority22 pages · other
Low

Addtl Provision and Clause - FAR 52.203-98/99

DOCX, Low priority2 pages · other
Low

Ahwahnee Asbestos Survey and PLM Report

PDF, Low prioritysurvey-report
Low

Ahwahnee Historic Structures Report - Interiors (Jan 2011)

PDF, Low priority36 pages · other
Low

Ahwahnee Historic Structures Report Jan 2011 – Material Conservation

PDF, Low priority36 pages · other
Low

Ahwahnee Historic Structures Report, January 2011

PDF, Low priority40 pages · other
Low

Ahwahnee Hotel Geotechnical Investigation Report

PDF, Low priority69 pages · other
Low

Ahwahnee Hotel Seismic Rehabilitation Alternatives Final Report (Feb 2002)

PDF, Low priority79 pages · other
Low

Ahwahnee HSR Appendix J – Historical Photographs

PDF, Low priority65 pages · other
Low

Ahwahnee HSR Appendix J Historical Photographs

PDF, Low priority67 pages · other
Low

Ahwahnee HSR Appendix J Historical Photographs (Vol. 2, Pt. 4)

PDF, Low priority60 pages · other
Low

Ahwahnee HSR January 2011 Historic Structures Report excerpt

PDF, Low priority19 pages · other
Low

Ahwahnee HSR January 2011 Physical Description Pages 86-115

PDF, Low priority30 pages · historical-report
Low

Appendix F - Selected Original Historical Drawings (Jan 2011)

PDF, Low priority20 pages · other
Low

Historic Structures Report Appendices Vol. II, Jan. 2011

PDF, Low priority25 pages · sow
Low

Historic Structures Report Appendix A: Bibliography, Ahwahnee Hotel (Jan 2011)

PDF, Low priority49 pages · other
Low

Historic Structures Report II-15 to II-19, January 2011

PDF, Low priority30 pages · other
Low

March 2011 Ahwahnee Cultural Landscape Report - Analysis and Evaluation

PDF, Low priority83 pages · report
Low

Pre-Proposal Meeting Attendance Record

PDF, Low priorityother
Low

Signature Page - Ahwahnee HSR

PDF, Low prioritysignature-page
Low

The Ahwahnee Cultural Landscape Report - Existing Conditions (March 2011)

PDF, Low priority45 pages · other
Low

The Ahwahnee Historic Structures Report – Statement of Significance (Jan 2011)

PDF, Low priority40 pages · historical-report
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: May 4, 2015. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts2 people available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
Contacts
Evelyn TateContract Specialist
Sally McMahonContracting Officer

Full Description

Show more
AMENDMENT No, 3 This Addendum forms a part of the Contract Documents, and modifies the original drawings and specifications dated 07/27/2014 and any addenda to this bid package previously issued. It is the responsibility of the contractor to notify all Subcontractors from whom he accepts bids of all changes in the drawings and specifications covering this project. Acknowledge receipt of this Addendum on the bid form. Please see the following questions and answers. QUESTION: What size is the pipe railing shown on details 2 & 5 on sheet A8.1? ANSWER: The pipe sizes for the railing have been clarified on the attached A8.1, Delta 2. The vertical post is 6" O.D. and the horizontal rails are 4" O.D. QUESTION: Throughout the project plans a high density styrofoam fill is called out in between the metal decking, concrete fill and the top of concrete slab, is there a specification for the type of styrofoam fill? ANSWER: High density styrofoam fill to be ASTM D6817, Type EPS29. Questions: Per Specification section 07-01-31, Crack Injection is part of the project. I have not seen specific areas of crack injection called out on the plans, is there project documents showing Crack Injection locations so we can provide quantities for bidding purposes? ANSWER: Crack injection is specified to correct deficiencies in new concrete. Per Section 033300, Paragraph 1.7.H.3., assume 100 lineal feet of crack injection for bidding purposes.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is an Invitation for Bid issued by the National Park Service Denver Service Center for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. This Small Business Set-Aside project, with an estimated construction magnitude between 1 million and 5 million dollars, focuses on repairing and extending a seawall damaged by Hurricane Ian. The scope of work is divided into three primary components: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods and deadman walls, the eastward extension of the wall using structural FRP composite sheet pile, and comprehensive site restoration including excavation, backfilling, limestone riprap installation, and spartina sea grass restoration. The contract is a Firm-Fixed-Price award with a mandatory performance period of 259 calendar days, requiring work to commence within 10 days of award. Award decisions will be based on the Best Value Continuum Tradeoff Process, where non-price factors—including technical approach, management, project experience, and past performance—are significantly more important than price. Bids are due by November 6, 2026, and must be submitted electronically. The project is subject to the Davis-Bacon Act and requires strict adherence to environmental standards, including the use of biodegradable packaging and the elimination of ozone-depleting compounds. Contractors must provide a bid bond and subsequent performance and payment bonds, and all invoicing must be processed through the U.S. Department of the Treasury's Invoice Processing Platform.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
New
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 13 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project is estimated to exceed 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating technical experience, technical approach, key personnel experience, and price. Key requirements include the provision of performance and payment bonds, adherence to union prevailing wage rates, and a 12-month operational support period following construction. Technical specifications emphasize strict cybersecurity hygiene for SCADA/MES equipment, full government rights to supplied software and source code, and compliance with ADA standards. Proposals must be submitted electronically in separate volumes, with specific evaluations focusing on the contractor's ability to manage complex wastewater plant commissioning and regulatory approvals.
Sewage Treatment Facilities

POSTED

5 days ago

DEADLINE

in 28 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 9 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 30 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS