Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Corrugated Steel Pipe (CSP) Supply and Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trades, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT, and should be directed to Alyssa Callaway. This solicitation is open to DBE, MBE, WBE, and SBE set-asides under NAICS code 237110.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the targeted retrofit of approximately 343.59 linear feet of roadway to implement green infrastructure. Key deliverables include the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants or approved equivalents. The project is designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area and requires necessary drainage, underdrain, inlet, pipe, and downspout work, as well as ADA-compliant curb, sidewalk, apron, crossing, and traffic-calming improvements. This solicitation specifically seeks MBE, DBE, and WBE subcontractors and suppliers, with a strong emphasis on small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, small businesses are encouraged to form consortiums. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for this opportunity are Jennifer Wilson and Jonah Leith. The project concludes with final stabilization, cleanup, and restoration of the site.
Harbel, Inc.

POSTED

about 4 hours ago

DEADLINE

in 1 day
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves of various diameters, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified entities, with a bid response deadline of September 29, 2026. James W. Fowler Co. is actively encouraging M/W/DBE participation and offering support for bonding, insurance, and material procurement to qualified subcontractors.
James W. Fowler Co.

POSTED

about 4 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract involves the supply, delivery, and installation of corrugated steel pipe for drainage structures and culverts under a subcontract awarded by the California Department of Transportation. The work is designated under NAICS code 237110, which classifies it as highway, street, and bridge construction, indicating the scope is tied to transportation infrastructure. All materials and services must be delivered and installed at the designated place of performance in Sacramento, California, with no alternative locations specified. The solicitation was posted and the response deadline is set for August 25, 2026, suggesting a long lead time for preparation and submission of proposals. The contract does not identify a specific set-aside status or point of contact, and the official reference link directs to the CALTRANS letting portal for further submission details and documentation requirements.

General Info

Supply, delivery, and installation of corrugated steel pipe for California DOT drainage structures in Sacramento by August 25, 2026.

Agency

California Department of TransportationView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Sacramento, CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply, delivery, and installation of corrugated steel pipe for drainage structures and culverts.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Santa Cruz County In Watsonville At Various Locations From Freedom Boulevard To Beck Street
Solicitation # 05-1Q1504
The California Department of Transportation has issued solicitation 05-1Q1504 for construction work on Route 152 in Watsonville, Santa Cruz County, specifically from Freedom Boulevard to Beck Street. The project scope includes the installation of curb ramps, the removal and replacement of sidewalks, and the implementation of signal and lighting improvements. The estimated cost of the project is 4,070,000 dollars, with bids required on a unit price basis. All work must be completed within 160 working days and adhere to the 2025 Standard Specifications and Standard Plans, as well as project plans approved on June 1, 2026. Key requirements include compliance with Buy America/Build America standards for manufactured products and adherence to prevailing wage rates as determined by the California Department of Industrial Relations. Quality control personnel must hold ACI Concrete Field-Testing Technician Grade 1 certification, and specific material standards are mandated for brick pavers and local materials. The contractor is responsible for coordinating lane closures with the Engineer and must comply with regulations from Cal/OSHA and the CA RWQCB Region 3. Additionally, the contract requires strict adherence to monument preservation laws and specific quality levels for utility identification.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS