Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Council Bluff Primary Electric And Well Improvements

Closed
1240LT26Q0172Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Term Agreement with 4 Options to Renew - Fiber Optic Maintenance, Repair and Modernization for IT, Transportation, and Water Departments
Solicitation # REQ00003176
The City of Garland is soliciting bids for a term agreement under solicitation REQ00003176 to provide fiber optic maintenance, repair, and modernization services for its IT, Transportation, and Water Departments. The contract consists of an initial twelve-month term with four optional twelve-month renewal periods. The City intends to award the contract to the two highest-ranked respondents, designating one as the primary contractor and the other as the secondary contractor to ensure redundancy and emergency response capacity. Award decisions are based on best value, evaluated through overall qualifications, client references, and relevant project examples. The scope of work requires the contractor to provide all labor, materials, and equipment for installation, troubleshooting, and emergency repairs of critical infrastructure, including public safety and SCADA systems. Critical priority outages require a two-hour response time. Deliverables include schematic diagrams, OTDR test files, and as-built drawings, with a minimum two-year workmanship warranty required for all services. Bidders must submit comprehensive bids on all items to be considered responsive, adhering to Texas Government Code Chapter 2258 for prevailing wage rates. Materials are to be billed at actual cost plus a markup not exceeding 10 percent. All submissions must be made electronically via the IonWave portal by November 5, 2026.
City Of Garland

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
SLED
North State And Hwy 101 Utility Infrastructure Boring Project
Solicitation # 26-02
The City of Ukiah, Department of Electric Utility, is soliciting bids for the North State and Hwy 101 Utility Infrastructure Boring Project (Solicitation #26-02). This project involves the installation of utility infrastructure through horizontal directional drilling (HDD) and trenching at North State Street and Highway 101 in Ukiah, California. The scope of work includes 1,375 linear feet of HDD and 142 linear feet of trenching, backfilling, and compaction. Key deliverables include the installation of various HDPE and PVC conduits ranging from 1.25 to 6 inches and the installation of six fiber service vaults. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. Eligible bidders must possess a valid State of California Class A Contractor's License and be registered with the Department of Industrial Relations. Submission requirements include a detailed proposal with unit pricing, a Fair Employment Practices Certification, a notarized Non-Collusion Affidavit, and a statement of experience. Bids must be accompanied by a 10 percent bid security. Upon award, the contractor is required to provide a performance bond for 100 percent of the total contract price, as well as a payment bond and appropriate insurance certificates. The City will provide engineering personnel for inspections, and the contractor is responsible for ensuring all materials are stored to preserve quality and fitness for the work. The response deadline for this solicitation is December 1, 2026.
City of Ukiah

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Broadband Implementation Project - FFA
Solicitation # 2001063
The Broadband Implementation Project - FFA, solicitation number 2001063, is a comprehensive infrastructure initiative for the City of San Luis Obispo, California. The project involves the installation of aerial and underground fiber optics, including directional boring for conduit, deep bore casing, and the installation of 288 CT fiber cable. The scope of work encompasses the placement of various sized vaults, copper clad ground rods, pole risers, down guys, anchors, and new wooden poles, as well as cut and kick operations for existing poles. Additional requirements include potholing, tree trimming, public notification, and strict compliance with CPUC grant reporting and archaeological monitoring. The project is structured with a base bid and five additive alternates covering specific street segments, with award decisions based on a total project bid hierarchy capped at 2,400,000 dollars. Contractors must adhere to stringent technical and regulatory standards, including CPUC General Order 95, Caltrans 2024 specifications, and the City of San Luis Obispo 2025 Engineering Standards. Key requirements include the submission of OTDR bi-directional testing results prior to acceptance and the employment of directional drilling personnel with at least two years of experience. Bidders must provide a bid guaranty of 10 percent of the bid amount and, upon award, provide performance and payment bonds equal to 100 percent of the contract price. Compliance with California Labor Code is mandatory, requiring registration with the Department of Industrial Relations and adherence to prevailing wage laws. Sealed bids are due by 11:00 a.m. on November 19, 2026, to the Public Works Administration Office in San Luis Obispo.
City of San Luis Obispo

POSTED

about 16 hours ago

DEADLINE

in 30 days
NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The scope of work includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire line, and the use of both contractor-furnished materials and owner-furnished self-supporting steel poles. The project has an engineer's estimate of $1,900,000 and requires adherence to the National Electrical Safety Code and various ASTM standards for ductile iron poles and fiberglass crossarms. Bidders must provide evidence of financial and performance experience and are required to submit a bid bond of at least 10% of the total bid amount. The successful contractor must post a combined performance and payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications is mandatory. Bids must be submitted via Bid Express, email, or sealed hard copy by October 29, 2026. All equipment must be delivered FOB Destination to the City of Piqua, and any bids specifying FOB Factory will be rejected.
City of Piqua

POSTED

1 day ago

DEADLINE

in 9 days
NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and bus support structures. The contractor is responsible for comprehensive site work, including minor clearing, excavation, structural fill, grounding for all equipment, and the installation of above-ground conduits. The project also requires assistance with the start-up and commissioning of all mechanical, electrical, and electronic systems. Bidders must adhere to strict compliance standards, including State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications. A bid bond of no less than 10 percent is required, and the successful contractor must provide performance and payment bonds equal to the full contract price. Award selection will be based on a comparison of relative merits and the lowest and best bid. Technical execution must follow NESC, NEC, IEEE, and ANSI standards, with specific quality controls for concrete foundations and equipment shipment integrity. Performance penalties of $500 per calendar day apply for deliveries exceeding the designated completion date.
City of Piqua

POSTED

1 day ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Solicitation 1240LT26Q0172 is a combined synopsis and request for quotation issued by the USDA Forest Service for the Council Bluff Primary Electric and Well Improvements project located in Iron County, Missouri, within the Mark Twain National Forest. This total small business set-aside acquisition, under NAICS code 237130, involves coordinating with Ameren to extend a primary electric line from Missouri State Highway DD to the Wild Boar Campground and the existing well in the Council Bluff Recreation Area. The scope of work includes the installation of approximately 12,700 feet of buried electrical line, the installation of a well house transformer and service connection, the replacement of well pump components, and water analysis testing. The period of performance is scheduled from November 2, 2026, to March 2, 2027. The government will award the contract based on the best value, evaluating offerors on their technical approach, project management and oversight, performance schedule, specialized organizational experience, and past performance. Bidders must provide a bid guarantee for quotes exceeding 150,000 dollars and adhere to Davis-Bacon Act wage determinations for Missouri heavy and highway construction. Key requirements include the submission of resumes for key personnel, a detailed project schedule, and the use of the Invoice Processing Platform for electronic payments. All construction equipment must be inspected and cleared of contaminants off National Forest land prior to site arrival. Quotations are due by September 28, 2026.

General Info

USDA Forest Service electric and well improvements in Missouri, due September 28, 2026.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Rolla, MO, 65401, USA

Set-Aside

SBA

Documents

7

1240LT26Q0172 SF 1442 Sealed Bid Solicitation

PDF, High priority: read this firstifb
High

Amendment 0001 to Solicitation 1240LT26Q0172

PDF, High priority: read this firstamendment
High

Council Bluff Primary Electric and Well Improvements - Project Specifications (06/2026)

PDF, High priority: read this firstspecifications
High

Council Bluff Primary Electric and Well Improvements – Schedule of Items

PDF, High priority: read this firstsow
High

GAOA - Council Bluff Primary Electric and Well Improvements Drawings

PDF, High priority: read this firstspecifications
High

M020260001 Missouri Heavy and Highway Wage Determination

PDF, High priority: read this firstwage-determination
High

RFQ 1240LT26Q0172 - Council Bluff Primary Electric and Well Improvements

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 11:00 PM UTC to 10:00 PM UTC on Sep 28, 2026. NAICS code changed from 238210 to 237130. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Serivce
Contacts2 people available
OfficeKALISPELL, MT, 59901, USA
Office AddressKALISPELL, MT, 59901, USA
Contacts

Full Description

Show more

Amendment 0001 changes time zones and NAICS code is attached.


This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.


Solicitation number 1240LT26Q0172 is issued as a Request for Quotation (RFQ) for MARK


TWAIN NATIONAL FOREST COUNCIL BLUFF PRIMARY ELECTRIC AND WELL


IMPROVEMENTS.


This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 283210. The small business size standard is $19 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.


The Work consists of coordinating with Ameren to extend their existing primary electric line from an overhead power line located near Missouri State Highway DD to the Wild Boar Campground. This includes coming off an existing electric pole on the east side of the highway and installing buried line along the edge of the cleared highway right-of-way to the existing well within the Council Bluff Recreation Area. The corridor will parallel the east side of Missouri State Highway DD for approximately 9,600 feet and then use an “old road corridor” along the top of Wild Boar Ridge leading to the well for approximately 3,100 feet.

More opportunities from Department Of Agriculture → USDA Forest Serivce

Same awarding agency

NAICS: 238160
New
Federal
GAOA Remove and Replace Roofing on Island Park Admin Site Housing Units
Solicitation # 1240LT26Q0035
Solicitation 1240LT26Q0035 is a total small business set-aside request for quotations issued by the USDA Forest Service for the removal and replacement of roofing on ten housing units at the Island Park Administrative Site in Idaho. The project scope includes the tear-off of existing metal roofing and the installation of 24-gauge flat profile standing seam metal roof panels, matching flashing, trim, ridge vents, and aluminum vented soffit and fascia. Additionally, the contractor must replace damaged sheathing on all units and fully replace the skip sheathing on Dwelling 1103. The estimated contract value ranges between $500,000 and $1,000,000, with a performance period of 90 calendar days expected to begin around May 2027. Award will be based on the best value to the government, evaluating the offeror's technical approach, planned resources, sequencing, and a record of three similar projects completed within the last three years. Bidders must be registered in the System for Award Management and provide a 20% bid guarantee if the quote exceeds $150,000. The contract is subject to the Davis-Bacon Act for prevailing wages and requires the use of domestic construction materials per the Buy American Act. Submissions must be delivered as four separate PDF documents, including a signed SF-1442, a priced schedule of items, a technical proposal, and any required bid guarantees.
Roofing Contractors

POSTED

4 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS