Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Covered Outdoor Patio Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the construction of a 1,554 square foot covered outdoor patio designed for prime contractors working on City of Sacramento commercial projects. The scope of work includes the installation of structural supports and roofing for an outdoor dining area, utilizing either structural steel or wood to complete the build. The project must strictly adhere to Design Review standards and SC-PUD zoning codes to ensure regulatory compliance. Performance of the contract will take place in Sacramento, California, under NAICS code 238990.

General Info

Subcontract for constructing a 1,554 square foot covered outdoor patio in Sacramento, California.

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

This scope was carved out of P24-027.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Natomas Fountains

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Natomas Fountains
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Constructs a 1,554 square foot covered outdoor patio for prime contractors on City of Sacramento commercial projects. Installs structural supports and roofing for an outdoor dining area using structural steel or wood. Must comply with Design Review and SC-PUD zoning code. Delivers a 1,554 sq ft covered outdoor patio.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Sacramento

Same awarding agency

NAICS: 541620
SLED
Two Rivers Trail Phase II Project (K15125000)
Solicitation # SAC-18909-R2
The California Department of Fish and Wildlife has executed Amendment #2 to the Streambed Alteration Agreement EPIMS Notification Number SAC-18909-R2 for the Two Rivers Trail Phase II project. Located along the south bank of the American River in Sacramento, California, the project area extends from Sutter's Landing Park to the H Street Bridge. This amendment specifically modifies the compensatory measures required under Measure 3.1 due to restoration difficulties encountered by the Permittee, the City of Sacramento. While 0.24 acres of riparian habitat were originally required, only 0.07 acres have been successfully restored. To address the remaining 0.17-acre shortfall, the amendment allows the Permittee to purchase suitable mitigation credits from a CDFW-approved mitigation bank. The City of Sacramento serves as the Lead Agency for this project, with Adam Randolph acting as the primary point of contact. The California Department of Fish and Wildlife, acting as the Responsible Agency, has determined through a Notice of Determination that the project will not have a significant environmental effect within its jurisdiction. This amendment ensures compliance with California environmental regulations and the Fish and Game Code by providing an alternative pathway for habitat mitigation. The project is identified by Assessor's Parcel Number 001-0160-005-0000 and is situated at coordinates Latitude 38.589442, Longitude -121.451397.
Environmental Consulting Services

POSTED

11 days ago

DEADLINE

N/A
View Details
NAICS: 237110
SLED
Delta Shores Project
Solicitation # DR26-139
The Delta Shores Project involves the development of 27 single-family dwellings on designated lots within the Delta Shores West Subdivision Map (P06-197) in Sacramento, California, under the Single-Unit Dwelling Zone (R-1-PUD) of the Delta Shores Planned Unit Development area. The project is administered by the City of Sacramento’s Community Development Department, Planning Division, with the lead agency responsible for environmental review and permitting under the California Environmental Quality Act (CEQA). The development is part of a larger master-planned community spanning approximately 782 acres, but this specific phase focuses on the construction of the 27 homes along with associated site improvements including landscaping, lighting, ADA-compliant parking, and sewer infrastructure installed via microtunneling under Morrison Creek. Regulatory compliance is governed by local zoning codes, Delta Shores PUD design guidelines, Title 23 standards for flood control, and CEQA requirements, which necessitate either an Environmental Impact Report or a Mitigated Negative Declaration, along with a Mitigation Monitoring Plan and Notice of Determination. The project’s place of performance is specifically located at 2850 Gateway Oaks Drive in Sacramento, and all approvals must be secured from municipal authorities including the Planning Commission and City Council. The procurement process described does not follow federal acquisition regulations; there are no Federal Acquisition Regulation (FAR) clauses, contract types such as FFP or IDIQ, or line-item pricing details as would be found in a federal contract. Instead, this is a land use entitlement and development approval process with administrative fees recorded for filings such as environmental reviews and recording documents. Payment is handled locally through the City of Sacramento or Sacramento County offices, with accepted methods including cash, check, and credit, though no formal invoicing systems like WAWF or IPP are referenced. Key contacts include Charles Tschudin, Senior Planner, as the primary point of contact, and Kevin Wilson of Meritage Homes as the project manager, while Rochelle Hall serves as a point of contact for the lead agency. Although referenced documents include Notices of Exemption, CDFW No Effect Determinations, and previous fee receipts, these are part of the CEQA compliance package and not technical specifications or contractual deliverables. There are no federal representations, certifications, or socioeconomic disclosures required, and no formal period of performance or delivery schedule is defined, with key dates tied to approval milestones rather than contract execution timelines. The project is currently in the permitting and environmental review phase, with
Water and Sewer Line and Related Structures Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS