Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Crack Sealing Application Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the application of hot-applied or polymer-modified crack sealant to asphalt pavement along SH0071, with the goal of preventing water infiltration and extending the lifespan of the road surface. Work includes routing cracks to an appropriate width and depth, thoroughly cleaning debris and moisture from the crack surfaces, and applying sealant with precision to ensure full adhesion and long-term performance. All activities must meet specified material and procedural standards to maintain pavement integrity under high-traffic and environmental conditions. This is a subcontract opportunity issued by the Texas Department of Transportation under NAICS code 237310 for highway and street construction services. The solicitation was posted on July 16, 2026, with a response deadline of August 12, 2026. The place of performance is along SH0071 in Texas, and interested parties must submit proposals through the Texas SmartBuy portal by the established deadline. The contract focuses exclusively on crack sealing services with no mention of broader pavement rehabilitation or reconstruction work.

General Info

Crack sealing on SH0071 in Texas using polymer-modified sealant per TxDOT specs, deadline August 12, 2026.

Agency

Texas Department of Transportation

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

TX, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas Department of Transportation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Application of hot-applied or polymer-modified crack sealant to asphalt pavement on SH0071, including routing, cleaning, and sealing cracks to prevent water infiltration and extend pavement life.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will upgrade the entry and exit drives along 19th Ave W, demolish the remaining slab of the Downie Building (C-14), and redevelop the area into a mix of new parking, green space, and pollinator habitat with integrated stormwater treatment features. Existing pavement in degraded condition will be milled and overlaid, while stormwater infrastructure will be replaced and expanded to divert runoff away from combined sewers into dedicated storm lines, including water quality treatment on qualifying surfaces. A new irrigation system will support the green areas, and landscaping will be added to the median within the entry drive. Electric vehicle charging stations will be installed in the new parking zone to support sustainable transportation. The project will enhance active transportation by adding a protected two-way bike lane linking the terminal entry to the West Wall bike path and improving pedestrian access to the intersection at 21st Ave W and W Emerson Pl, as well as the adjacent King County Metro bus stop. Lighting will be upgraded throughout the new parking area and connecting pathways, and new wayfinding elements will guide pedestrian and bicycle traffic. These improvements aim to increase safety, accessibility, and environmental sustainability at the terminal. The work is being managed by the Port of Seattle through its Waterfront Project Management team, with a forecasted posting date of July 29, 2026, under NAICS code 237310 for heavy and civil engineering construction.
Waterfront Project Management

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
International
Transportation Planning & Design-Surfacing - Preliminary Design for Truck Rest AreasThe Saskatchewan Ministry of Highways is seeking a qualified consultant to perform preliminary design work for four proposed truck rest areas along Highway 1, specifically at C.S. 1-22 near the Alberta border, C.S. 1-21 in Maple Creek, C.S. 1-19 at Gull Lake, and C.S. 1-15 at Ernfold. Two of these sites are existing rest areas requiring upgrades, while the other two are greenfield locations that need full design from inception. The consultant will determine the optimal configuration, layout, and functionality of each site, including access control measures, to meet the needs of commercial vehicle operators. The scope focuses exclusively on preliminary design and does not include detailed engineering or construction documentation. However, the financial rates submitted by the consultant will be applied if the Ministry proceeds with a second phase of work, which could involve detailed design and tender package preparation for one of the four locations. All participating consultants must be prequalified, and those under probationary status at the time of competition closure must adhere to the guidelines outlined in the Professional Services Procurement Manual PSPM 100-04 to maintain eligibility. The solicitation is open for responses until August 13, 2026, with proposals submitted through the Saskatchewan tenders portal. The work falls under the Transportation Planning & Design-Surfacing category, and all site locations are within Saskatchewan. The primary point of contact for submissions is SBP Consultants, reachable via submission@gov.sk.ca. The project is part of the Ministry’s broader efforts to enhance safety and service for long-haul trucking along key provincial corridors, with potential for future contract expansion based on preliminary design outcomes.
Highways

POSTED

about 13 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237310
New
International
Roadwork-SUPPLY&INSTALL 2 CORRUGATED STEEL PIPE CULVERTS open excavation TOTAL LENGTH 50 m CS:5-05The Ministry of Highways in Saskatchewan is issuing an advance notice for the procurement of a contractor to replace two existing culverts on Highway 5, approximately 15.47 kilometers northwest of its intersection with Highway 35. The project involves the supply and installation of two 1,800 mm diameter polymer laminated corrugated steel pipe culverts, each 25 meters long and constructed with 125 mm x 25 mm corrugations and a 2.0 mm wall thickness, totaling 50 meters in length. The culverts will be installed using open excavation on the roadway, and the Ministry will supply all materials. The project also includes the removal and disposal of a deteriorated wood pile bridge measuring 1.83 meters in rise, 3.05 meters in span, and 22.8 meters in length, along with associated earthworks such as granular base course, asphalt concrete, riprap, backfill, erosion control measures, silt fencing, and seeding. The contractor is responsible for all labor and installation, while the Ministry provides materials and components including couplers and end stiffeners. The work is anticipated to commence as early as August 2026, with a mandatory completion date no later than October 31, 2026, and the solicitation will have a shortened advertising period. Bidders must submit a deposit equal to 5 percent of their total bid amount. All quantities specified are preliminary estimates and subject to revision in the official tender documents. Questions regarding the project may be directed to a designated email address with a specific subject line, and the tender documents will be posted when available. A debriefing opportunity is provided to bidders within 30 days of award notification to review performance and identify areas for improvement in future bids. The Ministry retains the right to cancel or not proceed with the procurement at any time prior to award.
Highways

POSTED

about 14 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
SLED
P83_2026 ON-CALL GUARDRAIL HITS REPAIRThe Virginia Department of Transportation is soliciting bids for an on-call contract to perform repairs following guardrail hits across various locations in Northern Virginia, specifically within Prince William, Manassas, and Manassas Park counties. This contract, identified as P83_2026 and solicited under IFB-125222, requires prequalification before bidding and is open to contractors who can respond swiftly to incident-related damages on state-maintained roadways. All inquiries must be submitted through the CABB platform, and bids are due by August 26, 2026, at 3:00 PM. The work will involve rapid deployment and execution of repairs to ensure public safety and compliance with transportation standards after vehicle collisions with guardrails. Contractors must be prepared to operate on an as-needed basis, with no guaranteed volume of work but the expectation of frequent and often time-sensitive assignments. The contract is managed by the Virginia Department of Transportation, with point of contact Mark Taylor available for questions via email or phone. There is no set-aside classification listed, and performance will occur exclusively within the specified Virginia counties. Contractors are advised to review the full solicitation details via the provided VDOT vendor portal link to understand specific technical requirements, reporting obligations, and performance metrics tied to response times and work quality.
Virginia Department of Transportation

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
2026 Retaining Wall ProjectThe project involves the replacement and new construction of storm drain systems, sidewalks, curb and gutter, and related infrastructure at multiple locations in Bountiful, Utah, with a specific focus on installing a gabion retaining wall, excavating, and restoring asphalt pavement and landscaping. Work includes the removal and replacement of deteriorated storm drain components such as pipes, manholes, and inlets, alongside the construction of new 12-inch and 15-inch reinforced concrete pipe systems, ADA-compliant ramps, transition structures, and waterways. The retaining wall component, identified in Schedule 4, requires installation of a 55-square-foot reinforced concrete wall in compliance with Bountiful City standards for exposed surfaces, which must have a rubbed finish. All construction must adhere to the 2025 Edition of the Manual of Standard Specifications and Manual of Standard Plans published by the Utah Chapter of the American Public Works Association, including specific requirements for subgrade compaction at 95% minimum modified Proctor, use of epoxy-coated rebar, concrete class 4000, proper curing, and sawcutting procedures. The project is governed by strict compliance with Utah state laws, and bidders must submit a 5% bid security, along with performance and payment bonds equal to 100% of the contract award, issued by sureties authorized in Utah with an A.M. Best rating of A- or better. The estimated total project cost is over $1 million, and the work must be substantially completed by October 15, 2026, with a anticipated notice to proceed on August 3, 2026. All excavation activities require a 2-day advance notice to the Blue Stakes Center of Utah, and the contractor is responsible for all testing, retesting, and remediation of non-compliant materials, including core sampling for concrete if defective within 35 days of placement, as allowed by city protocols. Retainage of 5% is held on each monthly payment and released only after final acceptance of record documents and successful completion of the engineer’s punch list within seven days of its issuance. The contractor must maintain comprehensive records for three years post-completion and provide proof of compliance with Utah licensing requirements, workers’ compensation coverage of at least $1 million, and automobile liability limits of $3 million per accident. All bid submissions must be sealed, clearly marked, and delivered by the deadline, with no consideration given for oral, telephonic, or modified bids. The
Utah

POSTED

about 18 hours ago

DEADLINE

in 20 days
View Details