Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Utah was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Crack Sealing for Airfield Pavements

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Sports Safety Netting - Riverside High School
Solicitation # 127-29
The School District of Greenville County is soliciting fixed price bids for solicitation 127-29 to provide a turnkey solution for the furnishing and installation of protective sports safety netting at the Riverside High School baseball stadium in Greer, South Carolina. The scope of work includes the demolition and disposal of existing fencing, netting, and poles, as well as the installation of one 30-foot tall tension in-line backstop netting system using number 36 gauge twisted, knotted black nylon with a 1-3/4 inch mesh size. The project requires the replacement of approximately 30 linear feet of backstop fencing behind home plate and the submission of stamped engineered drawings. The anticipated start date is December 1, 2026, with a substantial completion deadline of January 31, 2027, under a one-year period of performance. Bids must be submitted through the procurement portal by November 13, 2026, at 10:00 am. Required submission materials include a completed bid form, a signed vendor questionnaire with a bid response certification, and a minimum of three professional references. A five percent bid security is required prior to the deadline, and the successful contractor must provide performance and payment bonds. Evaluation is based on responsiveness to mandatory specifications and the vendor's responsibility, including integrity and reliability. The contract is governed by South Carolina law and incorporates various federal regulatory requirements, including the Davis-Bacon Act for prevailing wages on construction contracts exceeding 2,000 dollars and compliance with the Clean Air Act and the Byrd Anti-Lobbying Amendment for higher value thresholds.
Construction Services

POSTED

about 9 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves the inspection, cleaning, and sealing of pavement cracks on Runway 2/20, Taxiway A, and Apron areas at an airfield. The work requires the application of either hot-pour or cold-pour sealants to effectively seal cracks and prevent water infiltration, thereby preserving the integrity and safety of the pavements. This subcontract supports the ongoing maintenance and durability of key airfield surfaces, ensuring operational reliability. This opportunity was posted on June 9, 2026, with a response deadline of June 24, 2026. It falls under the NAICS code 238990, which pertains to specialized trade contractors. The contract is issued by the state agency of Utah, though specific details about the exact location, office address, and point of contact are not provided. Interested parties can access additional information and submit responses via the provided online portal.

General Info

Inspection, cleaning, and sealing of airfield pavement cracks with hot or cold-pour sealants.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of RA26-148.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Gunnison City- 2026 Pavement Preservation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Inspection, cleaning, and sealing of pavement cracks across Runway 2/20, Taxiway A, and Apron areas using hot-pour or cold-pour sealants to prevent water infiltration.

More opportunities from Utah

Same awarding agency

NAICS: 237110
New
SLED
DFCM Construction - Prequalified Mechanical & Site Civil Stage II - Weber State University - WSU Waterline Replacement, Phase 3 - Project #20417810
Solicitation # CS27028
The State of Utah Division of Facilities Construction and Management is soliciting bids for the Weber State University Waterline Replacement, Phase 3, located along 4100 South at the south end of the main campus in Ogden, Utah. This project involves the replacement of culinary water and secondary irrigation mains, including the installation of associated valves, vaults, and hydrant connections, as well as comprehensive surface restoration. The estimated construction cost for the project is $1,400,000.00. This is a low bid procurement where eligibility is strictly limited to contractors who have been prequalified under a Stage I Prequalification and are currently on the DFCM Prequalified Contractors list. Bids must be submitted via the U3P website by December 22, 2026, and must include a bid bond for 5% of the bid amount using the AIA Document A310 - 2010 form. Technical requirements include the use of ACI certified finishers for concrete work, adherence to ADA grade and slope standards, and a one-year warranty for vegetation establishment. Materials such as seed, fertilizer, and blankets must be delivered in original packaging with specific manufacturer certifications. Project acceptance is managed by the Resident Engineer and the Engineer, with specific quality standards for concrete and gradation based on UDOT requirements. The contractor is required to maintain a stable project team and provide bid, performance, and payment bonds.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS