CRAg01 - Hawk Highwalls
Active
49309State & LocalResponse Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Place of Performance
OH, USASet-Aside
NONE
Timeline
PhaseSolicitation
Response Deadline
Organization & Contact Information
Show more
AgencyOhio → ODNR-Division of Mineral Resources Management
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → ODNR-Division of Mineral Resources Management
Office AddressN/A
ContactsNo contact information available
Full Description
Show more
MANDATORY PRE-BID MEETING ON OCTOBER 16, 2026, AT 10:00 AM
Project Name: Hawk Highwalls Project Description: The Hawk Highwalls Reclamation Project is found on a pre-law coal mine site in Augusta Township, Carrol County, Ohio. The project site is found along the north side of State Route 9 between Meadow Road NE and Reef Road NE. The project site does not have a physical address. The project site access is found across from 9306 Kensington Road (SR-9), Kensington, Ohio 44427. The Lat Long for the project site access is: 40.709940, -80.998757.
The project site consists of multiple AML (Abandoned Mine Land) features. In total, there are 3 dangerous highwalls with a combined length of approximately 3,500 linear feet, 17 acres of spoil, and 4 associated hazardous water bodies. The height of the highwalls vary from 30 feet to a maximum height of 58 feet, above the surface of the impoundments. The impoundments have insufficient discharge structures and steep side slopes.
The intent of this reclamation project is to establish a safe and maintainable site by backfilling the highwalls, and the associated impoundments, with existing spoil to eliminate the safety concerns. The proposed construction will also provide positive drainage, safe and maintainable side slopes, and engineered basin discharge structures.
The project site will be accessed via the landowners’ access drive. A construction entrance, access road, and staging area will be constructed. The reclamation work will be performed in phases. A temporary stream crossing will be constructed to access one of the phases.
Perform the earthwork/backfilling of the highwalls after clearing and grubbing, and impoundment dewatering, have been performed. Provide positive drainage by constructing temporary diversions to convey drainage toward the sediment settling structures. For sediment basins, install an engineered catch basin riser with a temporary sediment control structure (skimmer), a 12” Ø outlet pipe, and a plunge pool to regulate the discharge through the earthen embankment. For Sediment traps, install an aggregate outlet and weir at the trap discharge. Once grading has been approved, lime the disturbed areas. Perform standard revegetation on all areas disturbed by construction.
During the maintenance period of the project, dewater the sediment settling structures and remove all accumulated sediment. Remove the plunge pools, outlet pipes, catch basin risers, and temporary sediment control structures. Remove three sediment basins, three sediment traps, and all temporary diversions by backfilling the features. Once grading has been approved, lime, fertilize, seed, and mulch the disturbed area. At the conclusion of the project, remove the temporary stream crossing.
Provide all labor, materials, and equipment necessary to perform the work shown on the Contract Drawings and conforming to the specifications.
Engineer's Estimate: $2,029,473.00
Pre-Bid Meeting (MANDATORY) Location: The project site access is found across from 9306 Kensington Road (SR-9), Kensington, Ohio 44427. The Lat Long for the project site access is: 40.709940, -80.998757.
Project Engineer: Justin Conkle, (234) 206-4254 Project Officer: Jeffrey Clarke, (234) 206-4250
Project Name: Hawk Highwalls Project Description: The Hawk Highwalls Reclamation Project is found on a pre-law coal mine site in Augusta Township, Carrol County, Ohio. The project site is found along the north side of State Route 9 between Meadow Road NE and Reef Road NE. The project site does not have a physical address. The project site access is found across from 9306 Kensington Road (SR-9), Kensington, Ohio 44427. The Lat Long for the project site access is: 40.709940, -80.998757.
The project site consists of multiple AML (Abandoned Mine Land) features. In total, there are 3 dangerous highwalls with a combined length of approximately 3,500 linear feet, 17 acres of spoil, and 4 associated hazardous water bodies. The height of the highwalls vary from 30 feet to a maximum height of 58 feet, above the surface of the impoundments. The impoundments have insufficient discharge structures and steep side slopes.
The intent of this reclamation project is to establish a safe and maintainable site by backfilling the highwalls, and the associated impoundments, with existing spoil to eliminate the safety concerns. The proposed construction will also provide positive drainage, safe and maintainable side slopes, and engineered basin discharge structures.
The project site will be accessed via the landowners’ access drive. A construction entrance, access road, and staging area will be constructed. The reclamation work will be performed in phases. A temporary stream crossing will be constructed to access one of the phases.
Perform the earthwork/backfilling of the highwalls after clearing and grubbing, and impoundment dewatering, have been performed. Provide positive drainage by constructing temporary diversions to convey drainage toward the sediment settling structures. For sediment basins, install an engineered catch basin riser with a temporary sediment control structure (skimmer), a 12” Ø outlet pipe, and a plunge pool to regulate the discharge through the earthen embankment. For Sediment traps, install an aggregate outlet and weir at the trap discharge. Once grading has been approved, lime the disturbed areas. Perform standard revegetation on all areas disturbed by construction.
During the maintenance period of the project, dewater the sediment settling structures and remove all accumulated sediment. Remove the plunge pools, outlet pipes, catch basin risers, and temporary sediment control structures. Remove three sediment basins, three sediment traps, and all temporary diversions by backfilling the features. Once grading has been approved, lime, fertilize, seed, and mulch the disturbed area. At the conclusion of the project, remove the temporary stream crossing.
Provide all labor, materials, and equipment necessary to perform the work shown on the Contract Drawings and conforming to the specifications.
Engineer's Estimate: $2,029,473.00
Pre-Bid Meeting (MANDATORY) Location: The project site access is found across from 9306 Kensington Road (SR-9), Kensington, Ohio 44427. The Lat Long for the project site access is: 40.709940, -80.998757.
Project Engineer: Justin Conkle, (234) 206-4254 Project Officer: Jeffrey Clarke, (234) 206-4250
Similar Contracts
Same NAICS industry code
More opportunities from Ohio → ODNR-Division of Mineral Resources Management
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS