Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Marshall Street WRF Sand Filter Rehabilitation

Active
25-0008-UTState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Marshall Street WRF Sand Filter Rehabilitation project involves the comprehensive restoration of twelve existing sand filters and associated equipment at the Marshall Street Wastewater Reclamation Facility in Clearwater, Florida. The scope of work includes the removal and disposal of filter media, cleaning of filter cells, and concrete repairs as identified by the project engineer. Mechanical upgrades consist of replacing seven pneumatic actuators on 20-inch butterfly valves, sodium hypochlorite pumps and piping, and potentially replacing flange bolts and backwash pump discharge check valves based on performance testing. Additionally, the project requires upgrading the SCADA interface and replacing the main filter control panel touch screen to improve graphics and enable total local control of the filtration system. The contract is set for a performance period of 420 calendar days from the Notice to Proceed. Because the facility remains active, the contractor must implement a phased sequencing plan to ensure at least ten filter cells remain operational at all times. Quality assurance is heavily dependent on the filter equipment manufacturer, Evoqua, whose technicians must conduct initial and final inspections to approve cleaning and rehabilitation work. The contract will be awarded to the lowest responsible and responsive bidder, requiring a 10 percent bid security and the provision of payment and performance bonds. All work must adhere to City of Clearwater standards and EPA NPDES stormwater permits.

General Info

Rehabilitate twelve sand filters and upgrade SCADA systems at Marshall Street WRF, Florida.

Documents

9

25-0008-UT Marshall Street WRF Sand Filter Rehabilitation ITB

PDF, High priority: read this firstitb
High

Marshall Street WRF Sand Filter Rehabilitation (25-0008-UT)

PDF, High priority: read this firstitb
High

Marshall Street WRF Sand Filter Rehabilitation - Addendum 1

PDF, High priority: read this first2 pages · amendment
High

Marshall Street WRF Sand Filter Rehabilitation - Invitation to Bid

PDF, High priority: read this first16 pages · itb
High

Marshall Street WRF Sand Filter Rehabilitation - Supplemental Technical Specifications

PDF, High priority: read this firstspecifications
High

Marshall Street WRF Sand Filter Rehabilitation - Supplemental Technical Specifications

PDF, High priority: read this firstsow
High

Marshall St WRF Sand Filter Rehabilitation - Bid Set Drawings

PDF, High priority: read this firstspecifications
High

25-0008-UT Marshall Street WRF Sand Filter Rehabilitation Pre-Bid Agenda

PDF, Low priority2 pages · industry-day
Low

Pre-Bid Conference Sign-in Sheet - 25-0008-UT Marshall Street WRF Sand Filter Rehabilitation

PDF, Low priority2 pages · industry-day
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 8, 2026 to Oct 29, 2026.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts2 people available
OfficeClearwater, FL, 33756, USA
Organization / AgencyFlorida → Public Works
Office AddressClearwater, FL, 33756, USA
Contacts
Jennifer BurgettContract and Procurement Specialist
Kelly RogersProcurement Analyst II

Interested Companies (52)

U.S. Water Services Corporation DBA Rocha ControlsTampa, FL
KAT Construction & MaterialsPort Richey, FL
Shamrock Restoration ServicesBrooksville,, FL

See All 52 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Rehabilitate twelve (12) existing sand filters, associated equipment, remove and replace seven (7) pneumatic actuators on 20-inch Butterfly Valves (Filter Cells 1, 2, 7, 8, 11, and 12), flange bolts on 20-inch Backwash Inlet Butterfly Valve (Filter Cell 7, will only be necessary if Contractor confirms the valve is not functioning), two (2) 18-inch backwash pump discharge Check Valves (will only be necessary if Contractor tests and confirms the backwash flow rate is compromised), sodium hypochlorite pumps and associated piping. Other improvements include replacement of the touch screen for the main filter control panel with improved graphics and functionality, and upgrading the SCADA interface in the filter control room to facilitate total local control of the filtration system at the Marshall Street WRF. Sequence Constraints The facility is an active wastewater treatment plant and the work must be performed in such a manner and phased to minimize the operational impact on the plant and the plant staff. The work shall be scheduled and performed such that a minimum of ten (10) filters cells (existing and rehabilitated) remain in service, including the ability to backwash the operational cells, throughout the duration of construction and the Contract Period listed at the end of this section. Contractor shall submit a sequencing plan for review and approval prior to commencement of construction. Contractor shall coordinate any changes to the treatment process such as shutdowns with the Owner at least forty-eight (48) hours in advance. The plant Lead Operator or a representative of the Lead Operator shall be present for operation of all process valves. The Contractor shall not operate any process valves or equipment. Contractor shall schedule Initial Filter Inspections with the Owner and Engineer at least forty-eight (48) hours in advance. Contractor shall schedule Concrete Repair Inspections with the Owner and Engineer at least forty-eight (48) hours in advance. Final inspections shall be scheduled at least five (5) days in advance with the Owner and shall take place prior to filter start-up and acceptance by the Owner. Filter Cleaning and Initial Filter Inspections Contractor shall completely remove all filter media and debris from the interior of the filter cells and expose all six (6) underdrain assemblies in each filter. Contractor shall be responsible for washing and reusing media if capable of being salvaged (as determined by the Owner and Manufacturer's Rep), if not, hauling and disposal of filter media and debris removed from each filter cell. Replace with approved media following repair of underdrain systems. Filter walls and equipment shall be completely cleaned in accordance with the Contract Documents and made suitable for a visual evaluation but left in place for evaluation by the filter equipment manufacturer (Evoqua) on a per cell basis. Contractor shall furnish the services of Evoqua's field service technician, who has complete knowledge of proper operation and maintenance of the equipment to inspect the existing equipment and provide recommendations for repair and/or replacement of equipment as required for satisfactory operation. Prior to initial inspections, Evoqua and the Engineer must provide approval in writing that the filter cells have been cleaned in accordance with the Contract Documents. Contractor shall take all necessary actions, as recommended by Evoqua and the Engineer, to clean the filter cells in accordance with the Contract Documents until approval is provided. Contractor shall assume six (6) separate site visits will be required for Initial Filter Inspections of all twelve (12) filter cells. Each site visit will consist of an eight (8) hour day. Two (2) filters will be inspected per day. Additional site visits required due to incomplete work shall be the responsibility of the Contractor at no additional cost to the Owner. Concrete Repairs During the Initial Filter Inspections, the Engineer will recommend the concrete repairs to be made by the Contractor. The Contractor shall repair all concrete defects identified by the Engineer. Following repair of concrete in the filter cells, the Contractor shall schedule a Concrete Repair Inspection with the Engineer to confirm the repairs have been made in accordance with the Contract Documents. Approval shall be provided by the engineer prior to proceeding with repair, replacement, or reinstallation of any filter components. The Contractor shall take all necessary actions, as recommended by the Engineer, to repair the concrete in accordance with the Contract Specifications until approval is provided. Filter Rehabilitation Contractor shall repair or replace the existing equipment and components for each filter cell as shown in the drawings and Bid Form as recommended by the filter equipment manufacturer (Evoqua) during the Initial Filter Inspections. Final Filter Inspections The Contractor shall furnish the services of Evoqua's field service technician, who has complete knowledge of proper operation and maintenance of the equipment, as required to inspect the installed equipment. Following filter rehabilitation prior to placing filters into service, Evoqua shall provide visual inspections of the filter cells and determine if the cells have been rehabilitated in accordance with the Contract Documents. Contractor shall take all necessary actions, as recommended by Evoqua, to completely rehabilitate the filter cells in accordance with the Contract Documents until approval is provided by Evoqua. Contractor shall assume six (6) separate site visits will be required for Final Filter Inspections of all twelve (12) filter cells. Each site visit will consist of an eight (8) hour day. Two (2) filters will be inspected per day. Additional site visits required due to incomplete work shall be the responsibility of the Contractor at no additional cost to the Owner. Contractor shall assume one (1) site visit will be required for Final system functional check out of the HMI Operator Interface for a period of three (3) onsite eight (8) hour days. Additional site visits required due to incomplete work shall be the responsibility of the Contractor at no additional cost to the Owner. Valves Contractor shall be responsible for retaining a representative of the valve and actuator manufacturers for inspections of all new valves, actuator, and appurtenances. The manufacturers shall inspect the installed equipment and certify that the components are properly installed and ready to be placed into service. The drawings identify which valves and actuators require replacement or enhancement. Where valve pneumatic actuators are replaced, Contractor shall also replace stem risers and actuator pedestals. Replaced Stem Risers and actuator pedestals shall be of like kind as the existing stem risers and pedestals and sized appropriately for the valve service Contractor shall submit a written plan describing their proposed procedures for repairing or replacing the valves while maintaining the required number of filters in service. Startup and Testing Prior to placing any filter back in service, the Contractor shall test any valves which have been repaired or replaced. All quantities are estimates only and the city of Clearwater (city) is not obligated to purchase any minimum or maximum amount during the life of the contract. All of the work is to be administered per Section III, Section 11.3, Unit Price Work, of the Contract Documents. The Contractor shall provide copies of a current Contractor License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response. The Contractor shall provide one (1) Fixed project sign as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor's schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor's schedule of work. Contract Period: 420 Calendar Days from Notice to Proceed
Official Notice #1: Pre-Bid Meeting Agenda: Attachments: PreBid_Agenda.pdf
Addendum #1: Please use the See What Changed link to view all the changes made by this addendum. Attachments: Addendum.pdf
Official Notice #2: Pre-Bid Meeting Sign-in: Attachments: PreBid_Sign_In.pdf
Addendum #2: Please use the See What Changed link to view all the changes made by this addendum. Attachments: Addendum_2.pdf

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 5 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 236220
New
SLED
Construction of Building at Eagle Skate Park
Solicitation # 2026-ITB-PW-055-MR
The City of Cape Coral, Florida, is soliciting bids for the construction of a new building at Eagle Skate Park under solicitation number 2026-ITB-PW-055-MR. The project involves the construction of approximately 3,870 square feet of facility space, which will include office space, multipurpose rooms, a pro shop, a concession area, and various storage and building support services. The scope of work requires the contractor to provide all labor, materials, and equipment, with a performance period of 365 calendar days for substantial completion and 395 calendar days for final completion. Technical requirements include adherence to the 2017 NEC and NFPA standards, the 8th Edition Florida Building Code, and specific guidelines for electrical, plumbing, mechanical, and landscape installations. Bids must be submitted electronically via the OpenGov platform, with a final deadline of November 10, 2026, at 2:00 PM EST. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a local vendor preference available for those within 2.5 to 10 percent of the low bid. Required submittal documentation includes a bid bond equal to 5 percent of the base bid, a corporate resolution, a non-collusion affidavit, and proof of E-Verify enrollment. Additionally, the contractor must comply with strict environmental protections for the threatened burrowing owl and provide performance and payment bonds recorded in the Lee County Clerk of Courts within 15 days of contract execution. Payments will be issued via direct deposit, contingent upon annual appropriation by the City Council.
Commercial and Institutional Building Construction

POSTED

about 9 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
SLED
Construction of Oasis Sports Fields
Solicitation # 2026-ITB-CP-058-JM
The City of Cape Coral, Florida, is soliciting sealed bids for the construction of the Oasis Sports Fields located at 3415–3519 Oasis Boulevard. This comprehensive project involves the development of a multi-purpose athletic complex featuring seven facilities: a two-story gymnasium and locker building, a concession hall, home and away dugouts, a baseball equipment shed, a track and field equipment shed, and a ticket kiosk. The scope of work includes all labor, materials, and equipment necessary for a code-compliant facility, including structural supports for spectator bleachers, scoreboards, shot clocks, and a wheelchair lift, as well as ADA-compliant access and parking improvements. The contract is based on EJCDC C-700 Standard General Conditions and requires substantial completion within 450 calendar days of the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by December 2, 2026, at 1:30 PM ET. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluations focusing on capacity, past performance, and financial stability. Required submission documents include a bid bond equal to 5 percent of the base bid, a non-collusion affidavit, and a full list of proposed subcontractors. Awarded contractors must provide construction performance and payment bonds. Project specifications mandate strict adherence to ASTM, ANSI, ASME, and IEEE standards, with specific environmental protections in place for gopher tortoise burrows. Payments will be made via direct deposit, contingent upon annual appropriation by the City Council.
Commercial and Institutional Building Construction

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 339950
New
SLED
2709ITB - Citywide Banner Printing & Fabrication
Solicitation # 2709ITB
The City of Daytona Beach is soliciting bids under solicitation 2709ITB for the as-needed printing, fabrication, finishing, packaging, and delivery of various large-format signage, including vertical and horizontal pole banners, event banners, facility banners, and yard signs. This is a production and delivery only contract; installation, removal, and maintenance are specifically excluded. All bids must be submitted electronically via the OpenGov platform by November 19, 2026, at 3:00 pm, as paper submissions will not be accepted. Award will be granted to the lowest responsive and responsible bidder based on the combined total of all line item unit costs in the base bid pricing proposal. Qualified bidders must have at least three years of successful operation and possess the necessary organizational capacity and equipment to meet the city's requirements. Technical specifications mandate the use of heavy-duty vinyl for vertical pole banners with specific tensile ratings and double-sided full-color printing. Bidders are required to provide a bid security equal to 10 percent of the bid and, upon award, performance security equal to 100 percent of the contract price. Additionally, the successful contractor must maintain insurance with a combined single limit of at least 1 million dollars per occurrence and a general aggregate of 2 million dollars. The contract emphasizes strict quality control, requiring vendors to inspect products for dimensions and material quality before delivering them to the Public Works facility at 950 Bellevue Ave. Bidders must also comply with the U.S. Department of Homeland Security E-Verify system and provide a drug-free workplace certification. Local vendor preference under Code 30-86 will be considered as a primary tie-breaking factor. All artwork and production files provided by the city remain its exclusive property and must be protected from unauthorized distribution.
Sign Manufacturing

POSTED

1 day ago

DEADLINE

in 22 days
View Details
NAICS: 541330
New
SLED
Construction, Engineering And Inspection (CEI) Services For The Sands Boulevard And Surfside Boulevard Bridge Repair Projects
Solicitation # 2026-RFP-PW-070-KR
The City of Cape Coral is soliciting proposals for Construction Engineering and Inspection (CEI) services for two federally funded bridge repair projects: the Sands Boulevard Bridge over Eternity Canal and the Surfside Boulevard Bridge over Maxine Canal. The selected engineering firm will provide construction contract administration to restore resiliency to bridge approaches, bulkheads, and shoreline protection. These projects are funded through the FDOT Local Agency Program and must adhere to FDOT manuals, FHWA requirements, and federal-aid compliance standards. The contract duration is 300 calendar days from the Notice to Proceed, and the consultant must be capable of supporting both projects concurrently or independently. The procurement follows a Qualifications-Based Selection process, with proposals due by November 5, 2026. To be responsive, firms must be FDOT prequalified and provide evidence of professional licensure in Florida. Evaluation is conducted by a Selection Advisory Committee based on personnel qualifications, team management, and prior experience. Awarded consultants must provide payment and performance bonds and meet comprehensive insurance requirements for professional and general liability. Compliance mandates include the Davis-Bacon Act, Build America Buy America Act, and specific environmental protections for threatened burrowing owls.
Engineering Services

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
SLED
Wastewater Collections Point Repair and Improvements
Solicitation # 26-0060-UT
Solicitation 26-0060-UT is a unit price contract issued by the City of Clearwater Public Works department for Wastewater Collections Point Repair and Improvements. The scope of work is divided into six groups: Group A for sanitary sewer trenchless reconstruction, Group B for sewer cleaning and televising inspection, Group C for wastewater point repair, Group D for sanitary cleanouts and laterals, Group E for polyurethane manhole surfacing, and Group F for smoke and dye testing. Work is performed on an as-needed basis authorized through individual work orders, and the City is not obligated to a minimum or maximum quantity of work. The initial contract period is 365 consecutive calendar days from the Notice to Proceed, with the City reserving the right to renew for up to three additional years. The contract will be awarded to the lowest responsible and responsive bidder. Bidders must provide bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds upon award. Key technical requirements include compliance with the Florida Trench Safety Act, OSHA provisions, and the City's Utilities Standards and Specifications Manual. Performance is verified through pre- and post-installation CCTV inspections, and payment is contingent upon work being watertight and free of defects. Contractors are required to provide a one-year warranty, or a two-year manufacturer warranty if the standard term cannot be met from the date of substantial completion. Invoicing requires electronic submission of applications for payment accompanied by progress photographs, as-built documentation, and lien waivers.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS