CRAIG ROAD ELEVATED STORAGE TANK REHABILITATION (CIP 2520-WA)

Active
2026-22-BState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Town of Prosper is soliciting competitively sealed proposals for the Craig Road Elevated Storage Tank Rehabilitation project, identified as CIP 2520-WA under solicitation number 2026-22-B, with an engineer’s estimate of $2,216,754. Proposals must be submitted either online via IonWave.net or in hard copy to the Purchasing Office at Town Hall, 250 W. First St., Prosper, Texas, no later than 2:00 P.M. on Thursday, August 13, 2026; late submissions will be returned unopened. The proposal opening will occur online at 3:00 P.M. the same day via Microsoft Teams. Bidders are required to submit a cashier’s check or bid bond equal to 5% of their proposed amount, payable to the Town without recourse, as a guarantee of contract execution should they be awarded. Upon notification of award, the successful contractor must provide a Performance Bond equal to 115% of the contract value, a Payment Bond equal to 100%, and a Maintenance Bond covering defects in materials and workmanship for two years, all issued by a surety company licensed in Texas. Additionally, the contractor must furnish evidence of required insurance coverage within ten calendar days, including general liability, workers’ compensation, automobile liability, builders’ risk, and umbrella coverage, as outlined in the Town’s 2019 Insurance Requirements document. All contract documents, including plans, specifications, and the General Conditions for Construction (revised 2025), are available for free download at the Town’s bidding portal or may be purchased for $125 per set from the Engineering Department. Bidders must complete and submit a Completed Projects and References Worksheet providing details of at least three comparable projects in the Dallas-Fort Worth Metroplex completed within the past five years, along with three verifiable references. Questions must be submitted in writing through IonWave.net or via email to Purchasing Manager Jay Carter by 12:00 P.M. on Monday, August 3, 2026, after which no further clarifications will be provided. All proposals must comply with the Town's Standard Terms and Conditions for Construction Procurements (revised 2020), which govern submission formats, pricing, taxation, addenda, and procedure for bid openings. The project requires full mobilization of labor, equipment, and materials for complete rehabilitation

General Info

Town of Prosper seeks bids for Craig Road tank rehab by Aug 13, 2026, with $2.2M estimate and strict bonding and insurance requirements.

Agency

Texas → Town Of ProsperView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

(8)

CSP 2026-22-B Craig Road Elevated Storage Tank Rehabilitation

PDFrfp

Conflict of Interest Questionnaire R8-14-2024

PDFconflict-of-interest-questionnaire

CSP NO. 2026-22-B Craig Road Elevated Storage Tank Rehabilitation Contract Documents and Specifications

PDFcontract-document

2026-22-B Craig Rd EST Rehabilitation - Plans IFB

PDFifb

Town of Prosper General Conditions for Construction 1-31-2025

PDF16 pagesother

Completed Projects and References Worksheet 5-7-20

PDF3 pagespast-performance

Town of Prosper Standard Terms and Conditions for Construction Procurements April 24, 2020

PDF5 pagesother

Insurance Requirements for Construction Services R7-25-19

PDF2 pagesother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Town Of Prosper
Contacts1 person available
OfficeTX, USA
Organization / Agency
Texas → Town Of Prosper
View Agency Profile
Office AddressTX, USA
Contacts
Jay Carter PurchasingManager

Full Description

Show more
ENGINEER'S ESTIMATE: $2,216,754 The Town of Prosper is accepting competitively sealed proposals for CSP NO. 2025-22-B CRAIG ROAD ELEVATED STORAGE TANK REHABILITATION. Proposals will be accepted online through IonWave.net, the Town’s e-procurement system, or in hard copy in the Purchasing Office located in the 3rd Floor Finance Suite of Town Hall, 250 W. First St., Prosper, Texas 75078 until 2:00 P.M. on THURSDAY, AUGUST 13, 2026. Any proposals received after this time will not be accepted and will be returned unopened. The proposal opening will be held online on THURSDAY, AUGUST 13, 2026, at 3:00 P.M. To participate in the proposal opening, please use the following: Microsoft Teams meeting Join: https://teams.microsoft.com/meet/21570804707821?p=dGAAbgz7ry7YOGYnpR Meeting ID: 215 708 047 078 21 Passcode: Tp7Cq9ny The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of CRAIG ROAD ELEVATED STORAGE TANK REHABILITATION. Each proposal submitted shall be accompanied by a cashier's check in the amount of 5% of the maximum amount proposed, payable without recourse to the Town of Prosper, or a Bid Bond in the same amount from a reliable surety company as a guarantee that, if awarded the contract, the successful Contractor will execute a Construction Agreement with the Town, including all required bonds and other documents. The successful Contractor shall furnish a Performance Bond in the amount of 115% of the contract amount, and a Payment Bond in the amount of 100% of the contract amount, as well as evidence of all required insurance coverage within ten (10) calendar days of notice of award. The successful Contractor shall also furnish a Maintenance Bond in the amount of 100% of the contract amount covering defects of material and workmanship for two calendar years following the Town's approval and acceptance of the construction. An approved surety company, licensed in the State of Texas, shall issue all bonds in accordance with Texas law. Copies of Plans, Specifications, and Contract Documents may be examined at Town of Prosper Engineering Department, 250 W. First Street, Prosper, Texas, 75078, Phone: (972) 569-1198 without charge. These documents may be acquired from that office for the non-refundable purchase price of $125 per set, payable to the Town of Prosper. Copies of Plans, Specifications, and Contract Documents may also be downloaded free of charge from Current Bidding Opportunities, at the following link: http://www.prospertx.gov/business/bid-opportunities/. Questions and requests for clarifications in regard to this proposal should be submitted in writing through IonWave.net, the Town’s e-procurement system, or emailed directly to Jay Carter, NIGP-CPP, CPPB, C.P.M., Purchasing Manager, at jcarter@prospertx.gov. The deadline for receipt of questions and requests for clarifications is 12:00 P.M. on MONDAY AUGUST 3, 2026. After that day and time, no further questions or requests for clarifications will be accepted or answered by the Engineer or Town.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive modernization and maintenance initiative for aviation infrastructure at the Port of Seattle, focusing on critical airfield systems and safety enhancements. Key components include replacing aging airfield lighting circuits that exhibit low megger readings with new LED fixtures and signage to improve visibility, energy efficiency, and reliability. The project also involves the replacement of deteriorating pavement sections and vital underground utilities to ensure structural integrity and operational continuity. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signs to deter birds, and the implementation of regrading and storm drainage systems to eliminate ponding that attracts wildlife. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. This initiative is part of the AIRFIELD 2028 ALL PROJECTS bundled under NAICS code 237990 and is being managed by the Aviation Project Management Group. The procurement is forecasted with a posted date of July 18, 2026, and the primary point of contact is Yanet Maldonado of the Port of Seattle, reachable via phone and email. All work is expected to occur on-site at the airport, with no specified set-aside preferences or small business targeting outlined. The scope reflects a multi-faceted approach to enhancing safety, compliance, and long-term operational resilience across the airfield environment.
Aviation Project Management Group

POSTED

6 minutes ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract involves a comprehensive modernization and safety upgrade of the airfield infrastructure at the Port of Seattle, focusing on critical systems that enhance operational reliability and compliance with aviation safety standards. Key components include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to improve visibility, energy efficiency, and maintenance performance. The scope further encompasses the replacement of deteriorating airfield pavement and essential utilities to prevent failures and ensure uninterrupted airfield operations. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter bird activity, and the regrading of areas with ponding issues coupled with new storm drainage infrastructure to eliminate standing water that attracts wildlife. Additionally, the project includes replacing failing flush fire hydrant access hatches to ensure rapid and unobstructed access for emergency services during critical incidents. The work is part of the larger AIRFIELD 2029 ALL PROJECTS initiative under NAICS code 237990, managed by the Aviation Project Management Group of the Port of Seattle. Solicitations for this forecasted procurement are open with Yanet Maldonado listed as the primary point of contact for inquiries. All work will be conducted at the Port of Seattle airfield facilities, with an anticipated timeline aligned with the 2029 planning horizon to coordinate with broader infrastructure upgrades.
Aviation Project Management Group

POSTED

6 minutes ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 1The contract, titled 2027 Airfield Project - Contract 1, issued by the Port of Seattle through its Aviation Project Management Group, encompasses a broad range of airfield infrastructure upgrades aimed at enhancing safety, efficiency, and compliance. Key components include the replacement of airfield lighting circuits with poor megger readings with modern LED fixtures and signs, improving visibility and reliability while reducing long-term maintenance. Simultaneously, failing pavement sections and critical utilities across the airfield will be removed and replaced to ensure structural integrity and operational continuity. Wildlife hazard mitigation is a major focus, involving the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signs to deter birds, and comprehensive regrading and storm drainage installation to eliminate ponding areas that attract wildlife. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid emergency access and compliance with safety standards. All work is scheduled under a forecasted timeline with a posting date of July 18, 2026, and falls under the NAICS code 237990 for other heavy and civil engineering construction. Primary point of contact for inquiries is Jay Kim of the Port of Seattle, reachable via email or phone, with Mengqi Wu serving as the project manager. The contract is not currently soliciting bids but is posted as a forecast to notify potential bidders of upcoming opportunities. The place of performance is at the Port of Seattle’s airfield facilities, though specific city or state details are not provided in the data. Interested parties are directed to the provided UI link for further information and future solicitation details. The contract is structured without a set-aside designation, meaning open competition is anticipated.
Aviation Project Management Group

POSTED

6 minutes ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract involves a comprehensive upgrade of airfield infrastructure at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance with aviation standards. Key components include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signage to improve visibility and reduce energy consumption. Simultaneously, failing pavement sections and critical utility systems will be removed and replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation efforts are underway to reduce bird and animal activity near runways and taxiways by removing turf edge dams, installing anti-perching devices on signs, and addressing ponding issues through regrading and the installation of new storm drainage infrastructure. Additionally, deteriorated flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response teams. The project is officially titled 2027 Airfield Project - Contract 2, forecasted for release on July 18, 2026, under NAICS code 237990 for other heavy and civil engineering construction. It is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Moraa Omwega and Project Manager David Neds available for inquiries. All work is expected to take place on-site at the Port of Seattle’s airfield facilities, with no set-aside type specified. The contract reflects a multi-faceted modernization initiative designed to improve safety, reduce maintenance costs, and support long-term airfield sustainability.
Aviation Project Management Group

POSTED

6 minutes ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
North Carolina Department of Natural and Cultural Resources, Division of Parks and RecreationThe North Carolina Department of Natural and Cultural Resources, Division of Parks and Recreation, is soliciting proposals for improvements at the Kerr Lake State Recreation Area, specifically targeting the campground and maintenance areas. This project aims to enhance visitor experience and operational efficiency through targeted infrastructure upgrades, though specific scope details are not outlined in the provided data. The solicitation is open to qualified contractors under the State of North Carolina’s Construction Office, with all work required to be performed within the state. The opportunity is publicly posted under solicitation number SCO-24-27518-01A and is accessible through the state’s electronic procurement portal. Proposals must be submitted by the response deadline of August 19, 2026, at 6:30 PM Eastern Time, with the solicitation having been posted on July 17, 2026. Kadisha Molyneaux is listed as the primary point of contact for inquiries, and the process falls under the state’s procurement framework without any specified set-aside criteria. Interested parties are encouraged to review the official solicitation through the provided link to access full technical specifications, evaluation criteria, and submission requirements. The project reflects a broader commitment by the state to maintain and upgrade public recreational facilities to serve growing visitor demand.
State of NC - Construction Office

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Courtney Bend Water Treatment Plant Paste Slaker ReplacementThe City of Independence, Missouri is soliciting bids for the replacement of paste slaker units and ancillary equipment at the Courtney Bend Water Treatment Plant under solicitation number 26042, with a response deadline of September 3, 2026. Bids must be submitted exclusively online via PublicPurchase.com, and paper, fax, or email submissions will not be accepted. A virtual bid opening will be held using Microsoft Teams, with login details provided. The NAICS code for this procurement is 237990, and it is classified as a solicitation under SLED government procurement. The contract requires full compliance with Missouri prevailing wage laws as outlined in Annual Wage Order No. 33, effective May 28, 2026, which mandates payment of at least one and one-half times the prevailing hourly rate for overtime work. Contractors must submit completed affidavits affirming adherence to Missouri’s prevailing wage requirements, and failure to do so disqualifies the bid. Additional mandatory certifications include confirmation of enrollment in E-Verify, prohibition on knowingly employing unauthorized aliens, and assurance that the bidder and its principals are not suspended or debarred by federal, state, or local authorities. Contractors must also certify they are not engaging in, and will not engage during the contract term, any boycott of goods or services from the State of Israel in compliance with Missouri Revised Statute 34.600. A payment, performance, and maintenance bond is required, with the contractor obligated to ensure all work endures without defects for a full year following completion and acceptance. Non-collusion and conflict of interest affidavits must be signed, affirming no financial interest by city officials and no collusion in the bidding process. While specific technical specifications, quantities, delivery schedules, and contract value are not provided in the documentation, the scope centers on supplying and installing new lime slaking units. The place of performance is in Jackson County, Missouri, and all compliance documentation must be submitted as part of the bid package.
City of Independence

POSTED

about 15 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
CI 5634 HCTP In-Plant Meter ReplacementThe project at the Hill Canyon Treatment Plant in Camarillo, California, involves the removal and replacement of five magnetic flow meters ranging from 4-inch to 36-inch diameter, with installation of City-provided Endress+Hauser models, modification of an existing concrete vault deck to accommodate a larger access hatch for the 24-inch meter, and reconnection of power and communication conduits. The Contractor is responsible for transporting, loading, unloading, and installing the meters, procuring bolt, nut, and gasket kits, and ensuring all work complies with the Standard Specifications for Public Works Construction ("Greenbook"), the latest editions of the City of Thousand Oaks Water and Wastewater Standards, Road Standards, and applicable building codes including the International Building Code, Uniform Mechanical Code, National Electric Code, and California Title 24 and Title 19. All materials must be delivered in undamaged, manufacturer-sealed packaging and stored according to manufacturer instructions, with 100 percent of uncontaminated packaging materials salvaged or recycled. The scope includes assisting the City with final SCADA and electrical connectivity, while the City handles the final landing of conductors and system integration. Bids must be submitted electronically via the OpenGov portal by 3:30 p.m. on August 12, 2026, using only City-provided forms with all blanks completed and no alterations to printed text. A bid security of at least 10 percent of the maximum bid amount is required, either as an electronic bond through Surety2000 or a hard copy bond, certified check, or cash. The successful bidder must provide 100 percent Performance and Payment Bonds, carry insurance as specified in the contract, proof of workers’ compensation coverage, and comply with California’s Iran Contracting Act and non-collusion requirements. Bidders must demonstrate at least three similar projects valued at $50,000 or more within the past five years and specifically identify two projects involving large diameter meter replacement, both of which are pass/fail criteria for responsiveness. The contract will be awarded on a lowest responsive, responsible bidder basis based solely on the base bid. Work must be completed within 75 calendar days of the Notice to Proceed, with monthly progress payments at 95 percent of work completed, retaining 5 percent until final payment, which is due within 60 days of Notice of Completion. The City of Thousand Oaks, acting through its Public Works department, is the contracting agency
Public Works

POSTED

about 16 hours ago

DEADLINE

in 26 days
View Details

More opportunities from Texas → Town Of Prosper

Same awarding agency