Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

CSH014_ CSH-7216J - Renovate Facility

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project Scope of Work (Objective): 1. Replace Air Handling Units & Control Panels in 1, 2 and 3 F. a. Reason: i. The AHUs in mechanical rooms need to be replaced since they are old and deteriorated. (Manufactured at 1998) ii. Since 2016, many of BEQ rooms have inadequate air flow, which causes uneven temperatures / humidity in BEQ rooms and also occurs the severe mold/mildew problems in several rooms, even after the main chiller unit replacement on 2017. iii. Replacement option recommend to increase unit capacity and energy saving for long term. b. Additional info: i. AHU sirocco fans @1~3F were replaced by 2016 T/O. Recommend to salvage those fans for other units, when replacing the existing AHUs. ii. Only 4F AHU has been just replaced on 2017 by CSH037. c. Require PWD engineers to determine i. Increase the scope of work such as replacement of sensors / HVAC thermostat / HVAC ducts / dampers in Mech / Corridor / BEQ Rooms. ii. Consider any better design capable to provide sufficient air flow to every BEQ units. 2. Replace all of Bath/Shower room exhaust fans (100~120EA) in 1~4 F. a. Most of Bathroom exhaust fans (90%) are broken or provide extremely weak air exhaust. (See the attached the survey result conducted by NMCB 3&FOS.) b. The new exhaust ventilators can prevent from building up dirt, mildew, and mold growth in the bathroom. 3. Replace Exterior doors for entrance & exterior stairs. (Total: 10ea) a. Recommend the new exterior doors should be more durable and anti-rust. (heavy duty aluminum commercial door type) b. Equip with panic bar /typhoon latches/ smart card lock system. 4. Replace smart card lock system for the entire BEQ rooms (125ea) and exterior doors (10ea). 5. Replace floor tiles for interior/exterior stair ... NOTE: description has been truncated, please see Project Note for full description.