This Solicitation opportunity from Texas was posted on March 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The CWWTP Non-Potable Water System Improvements project (Solicitation No. CIZ-DWU-24 262) is a construction effort managed by Dallas Water Utilities for the City of Dallas, Texas. The scope of work involves the construction of a new non-potable water pump station, intake and transfer piping, a distribution loop, an electrical building, and associated civil infrastructure upgrades, including excavation retention systems and road repairs. An additive alternate for influent line rehabilitation is also included. The project is expected to be substantially complete within 900 days after the Notice to Proceed, with a base bid amount of 2,000,000 dollars.
Proposals were due by May 8, 2026, and submitted via the Bonfire portal. Evaluation is heavily weighted toward technical capability and past performance, requiring bidders to provide detailed project experience from the last 5 to 10 years and a comprehensive personnel plan. Contractors must submit an organizational chart and identify both primary and alternate candidates for key roles, including Project Manager, Superintendent, Quality Manager, Commissioning Manager, and Safety Manager. Documentation must include specific time allocation narratives for personnel and evidence of Small Business Enterprise (SBE) utilization and local workforce impact.
HighAI Summary for 24-262 CWWTP Non-Potable Water System Improvements RFcSP: This document is a Request for Competitive Sealed Proposal (RFcSP) for the CWWTP Non-Potable Water System Improvements project under contract number 24-262 by Dallas Water Utilities. The due date for submissions is May 8, 2026, at 1:00 PM. It includes instructions for proposers, general conditions, submission requirements, and compliance mandates such as registration with the Texas Secretary of State and prohibitions on contracts with companies boycotting Israel or engaging with foreign terrorist organizations. The document outlines pre-submittal conference dates and locations, submission procedures via Bonfire, and emphasizes adherence to all solicitation terms and conditions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 24-262 CWWTP NPW IFB Specifications Volume 2: This document is Volume 2 of the specifications for the Invitation for Bid (IFB) 24-262 CWWTP NPW. It includes a table titled 'Demonstration of On-Time Performance' which requests information on all projects completed by the organization within the last 5 years, including contract dates for substantial and final completion. The document appears to be part of the technical specifications for the procurement, providing criteria related to past performance and project timelines.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 for Contract 24-262 Central Wastewater Treatment Plant Non-Potable Water System Improvements: This document is Addendum No. 1 dated April 2, 2026, for Contract No. 24-262 concerning the Central Wastewater Treatment Plant Non-Potable Water System Improvements. It provides clarifications, revisions, and updates to the original bidding documents, including instructions for submitting forms and bid spreadsheets via Bonfire, revised file names for tables, changes to specification language, and updates to proposal requirements and evaluation criteria. The addendum also addresses questions from bidders and modifies certain articles related to proposal submission, evaluation, and project approach. This addendum is integral to the contract documents and must be incorporated into the bidding process.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 452Q-106 SH 50 Attachment No. 2 - Project Experience Table: This document is Addendum No. 2 for solicitation 452Q-106 SH 50, specifically Attachment No. 2. It contains a detailed table listing current projects and projects completed within the last 10 years with other entities. The table includes information on project owners, project names, general descriptions, project costs, completion dates, key project personnel (such as project manager, superintendent, safety manager, and quality control manager), and reference contact information. This attachment serves as an amendment providing additional project experience details relevant to the solicitation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 452Q-46 SH 78 Attachment No. 1 - Project Managers Table: This document is Addendum No. 2 Attachment No. 1 for solicitation 452Q-46 SH 78. It contains Table 5, which details proposed project managers including primary and alternate candidates. The table captures information such as names, years of experience, number of similar projects, current project assignments, and reference contact information. This addendum provides critical personnel information relevant to project management for the solicitation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No.2 Electrical Attachment No. 3 - Project Safety Managers Table: This document is Addendum No.2 Electrical Attachment No. 3, containing Table 7 which outlines the proposed project safety managers. It includes detailed information fields for both primary and alternate candidates such as names, years of experience as project safety managers, years with the organization, number of similar projects managed, current project assignments with time allocation and estimated completion dates, and reference contact information. The table is designed to support evaluation of safety management qualifications for a project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 for Contract 24-262 Central Wastewater Treatment Plant Improvements: This document is Addendum No. 2 dated April 14, 2026, for Contract No. 24-262 concerning the Central Wastewater Treatment Plant Non-Potable Water System Improvements in Dallas. It includes clarifications, answers to bidder questions, revisions to electrical sheets, and additional details such as flexbase road repairs, flume and rip rap details, and excavation retention system requirements. The addendum also specifies testing procedures and project estimates, and attaches revised drawings and details to be incorporated into the bidding and contract documents.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 10 05 29-04-2026: This document is Addendum No. 3 dated 29-Apr-2026. It provides detailed information about proposed project managers, including primary and alternate candidates. The content includes tables listing names, years of experience as project managers, years with the organization, number of similar projects managed, current project assignments with time allocation and estimated completion dates, and reference contact information. This addendum likely serves to update or clarify project management personnel details for a procurement or contract.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 - Project Superintendents Table: Addendum No. 4 includes a detailed table (Table 6) outlining proposed project superintendents for a project. It lists primary and alternate candidates with fields for their names, years of experience as project superintendents, years with the organization, number of similar projects in various roles, current project assignments with time allocation and estimated completion dates, and reference contact information. This document serves as an amendment providing critical personnel information relevant to the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 5 24 262 - Project Superintendents Table: This document is Addendum No. 5 for solicitation 24 262, containing a detailed table of proposed project superintendents. It includes information on primary and alternate candidates such as names, years of experience as project superintendent, years with the organization, number of similar projects, current project assignments with time allocation and estimated completion dates, and reference contact information. The document serves as an amendment providing critical personnel details relevant to the project execution.
DOCX
DOCX, High priority: read this firstsbe-good-faith-effort-form
HighAI Summary for BEH-FRM-607 SBE Good Faith Effort Documentation Form: This document is the BEH-FRM-607 SBE Good Faith Effort Documentation Form. It includes a project information table for key personnel, requiring submission of a project organization chart showing proposed key and alternate personnel and their relationships with subcontractors and suppliers. It also requests detailed information on key personnel roles such as Project Manager, Superintendent, Quality Manager, Commissioning Manager, and Safety Manager, including primary and alternate candidates. Additionally, it requires a narrative describing time allocation and qualifications if personnel fulfill multiple roles, specifying the percentage of time devoted to this project versus other assignments.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract 24-262 Dallas Water Utilities CWWTP NPW System Improvements Technical Specifications Volume 2: This document is Volume 2 of 3 for Contract No. 24-262 concerning the Dallas Water Utilities Central Wastewater Treatment Plant Non-Potable Water System Improvements. It contains detailed technical specifications and contract documents including general requirements, site work, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, equipment, special construction, mechanical, electrical, earthwork, and appendices such as geotechnical reports. The document outlines the scope of work, project management, construction procedures, materials, and quality requirements essential for the project execution.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract 24-262 Dallas Water Utilities NPW System Improvements Volume 2 Specs: This document is Volume 2 of 3 for Contract No. 24-262 concerning the Dallas Water Utilities Central Wastewater Treatment Plant Non-Potable Water System Improvements. It contains detailed technical specifications and contract documents including divisions on general requirements, site work, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, equipment, special construction, mechanical, electrical, earthwork, and appendices such as geotechnical reports. The document serves as a critical technical reference for construction and project management activities related to the contract.
XLS
XLS, High priority: read this firstbid-proposal-spreadsheet
HighAI Summary for Contract 24-262 Revised Bid Proposal Spreadsheet Addendum No. 4: This document is a revised bid proposal spreadsheet for Contract No. 24-262 related to the CWWTP Non-Potable Water System Improvements project by Dallas Water Utilities. It is identified as Addendum No. 4 and includes instructions to bidders, base bid items with quantities, units, descriptions, unit prices, and total amounts. The spreadsheet also lists additive alternate bid items. The total base bid amount is $2,000,000. Bids were received on May 8, 2026. The document is intended for bidders to complete and upload as part of the bid submission process.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Dallas Water Utilities CWWTP Non-Potable Water System Improvements Contract 24-262 Specifications: This document contains the specifications and forms of contract and bonds for the Dallas Water Utilities Central Wastewater Treatment Plant Non-Potable Water System Improvements, Contract No. 24-262. It includes an index to specifications, contract documents, general requirements, bid instructions, wage schedules, insurance requirements, and technical specifications. The project involves construction of a new non-potable water pump station, intake and transfer piping, distribution loop, electrical building, and ancillary civil works, with an additive alternate for influent line rehabilitation. The project is to be substantially complete within 900 days after Notice to Proceed. The document also details pre-bid conferences, site visits, proposal submission deadlines, and minimum contractor qualifications. The specifications are essential for bidders preparing competitive sealed proposals for this construction project.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for DWU-FRM-170-CS Request For Competitive Sealed Proposals 24 262 - Project Experience Table: This document is part of a Request For Competitive Sealed Proposals (RFP) identified as DWU-FRM-170-CS 24 262. It includes a detailed table listing current projects and projects completed within the last 10 years with Dallas Water Utilities. The table captures information such as organization name, division, project name, general description, project cost, completion date, key project personnel including project manager, superintendent, safety manager, and quality control manager, as well as reference contact information for owners, designers, and construction managers. This information is critical for evaluating past performance and qualifications of bidders.
PDF
PDF, Low priorityother
LowAI Summary for 24-262 CWWTP NPW IFB Plans Project Completion Information: This document appears to be a project completion information form related to the 24-262 CWWTP NPW IFB Plans. It requests details on all projects completed by an organization within the last 5 years, including owner name, project description, original and amended contract dates for substantial and final completion, and actual contract completion dates. The document is blank with no data filled in.
DOCX
DOCX, Low priorityother
LowAI Summary for Acknowledgement of Addendum - Project Experience Table: This document titled 'Acknowledgement of Addendum' contains a table format listing current projects and projects completed within the last 10 years with other entities. It includes fields for organization names, project owners, project descriptions, costs, completion dates, key project personnel, and reference contact information. The document appears to be a template or form for recording project experience details, likely used in a contracting or procurement context. No specific project data is filled in.
DOCX
DOCX, Low prioritysbe-affidavit
LowAI Summary for BEH-FRM-602 SBE Affidavit - Project Safety Managers: This document is the BEH-FRM-602 SBE Affidavit form focused on proposed project safety managers. It includes tables for listing primary and alternate candidates with details such as name, years of experience as project safety manager, years with the organization, number of similar projects, current project assignments, and reference contact information. The form is intended to capture qualifications and assignments of safety managers for a project, but no specific candidate data is filled in this version.
DOCX
DOCX, Low priorityform
LowAI Summary for BEH-FRM-604.SAW Local Participation & Workforce Impact - Project Quality Control Managers Form: This document is a form titled 'BEH-FRM-604.SAW Local Participation & Workforce Impact' that captures detailed information about proposed project quality control managers. It includes sections for primary and alternate candidates, requesting data such as names, years of experience, number of similar projects, current project assignments, and reference contact information. The form is designed to document qualifications and availability of quality control managers for a project.
DOCX
DOCX, Low priorityother
LowAI Summary for BEH-FRM-605 SBE Utilization Plan & Commitment to Local Economic Impact: This document appears to be a form or template related to project quality control management, specifically listing proposed project quality control managers. It includes sections for primary and alternate candidates, detailing their experience, current project assignments, and reference contact information. The document does not contain solicitation or contract-specific information but serves as a supporting or internal planning document for quality control personnel assignments.
DOCX
DOCX, Low prioritypast-performance
LowAI Summary for BEH-FRM-606 Engagement Score & Past Commitment Form: This document is the BEH-FRM-606 Engagement Score & Past Commitment Form. It requests information about the project organization chart, key personnel proposed for the project including roles such as Project Manager, Superintendent, Quality Manager, Commissioning Manager, and Safety Manager. It also asks for a narrative describing the allocation of time and qualifications of personnel fulfilling multiple roles. The form is used to assess past commitment and personnel engagement for a project.
PDF
PDF, Low prioritypast-performance
LowAI Summary for Dallas Water Utilities Project Experience Table: This document contains a table listing current projects and projects completed within the last 10 years with Dallas Water Utilities. It includes fields for organization name, division, project name, general description, project cost, completion date, key project personnel (project manager, superintendent, safety manager, quality control manager), and reference contact information for owners, designers, and construction managers. The table is intended to document past performance and project experience relevant to Dallas Water Utilities.
XLSX
XLSX, Low prioritysbe-list
LowAI Summary for DWU RFCSP Non-Potable Water System Improvements SBE List: This document is a Small Business Enterprise (SBE) list related to the Dallas Water Utilities (DWU) Request for Competitive Sealed Proposal (RFCSP) for Non-Potable Water System Improvements. It contains a detailed table of businesses classified under NAICS 237110 - Water and Sewer Line and Related Structures Construction, including company names, contact information, addresses, websites, and business descriptions. The list serves as a resource for identifying qualified small businesses for participation in the project.
XLSX
XLSX, Low prioritypast-performance
LowAI Summary for DWU RFCSP Non-Potable Water System Improvements SBE List: This document is a Small Business Enterprise (SBE) list template related to the DWU RFCSP for Non-Potable Water System Improvements. It requests information on all projects completed by the offeror within the last 5 years, including details such as owner name, project description, original contract price, value of change orders, and reasons for changes like owner enhancements, unforeseen conditions, and design issues. The document appears to be a spreadsheet format intended to capture past performance data for evaluation purposes.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The CWWTP Non-Potable Water System Improvements project (Project No. 24-262) consists of building a new non-potable water pump station, intake piping, and distribution system, supported by electrical and site infrastructure upgrades. Plans, Specifications, Bid Proposal Spreadsheet, and any additional files will be available on Bonfire at https://dallascityhall.bonfirehub.com/ on Friday, March 20, 2026, prior to 4:00 p.m. Project Manager: Haibo Cao, PE