This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on March 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Dam Valve Replacement/Repair for the Hoosier National Forest
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves maintenance work on three earthen dams within the Hoosier National Forest located on the Tell City Ranger District in Indiana. Specifically, the project includes replacing the dam valve assemblies at Celina Lake and Saddle Lake dams, as well as repairing the valve assembly at the U-38 dam. Each dam currently has distinct valve systems, with existing equipment details and diagrams provided as part of the solicitation. Additional technical information, including as-built drawings, is available upon request to aid in the execution of the work. This solicitation, identified by number 12444526Q0013, was posted on March 5, 2026, and the deadline for response submissions is March 20, 2026. It is a combined-type contract issued by the Department of Agriculture under the USDA Forest Service, specifically the Csa East 6 office, with a total small business set-aside designation under FAR 19.5. The contract performance location is Bristow, Indiana, and the applicable NAICS code for this contract is 237990, which relates to other heavy and civil engineering construction. The primary point of contact for the contract is Jordan Wheelock, reachable via email and phone for further inquiries.
General Info
Place of Performance
Bristow, IN, 47515, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Hoosier National Forest has three earthen dams that have maintenance needs with their valve operations. These dams are located on the Tell City Ranger District (See attached maps for locations and directions). The existing valve systems for all three dams are different. Known equipment and diagrams for each dam have been included in attachments to this solicitation. A copy of the as-builts can be acquired upon request.
The scope of work includes the replacement of the dam valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the dam valve assembly at the U-38 dam located on the Hoosier National Forest
More opportunities from Department Of Agriculture → Csa East 6 Usda-Fs
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
