Davis Road Resurfacing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Davis Road Resurfacing project, managed by the San Joaquin County Public Works Department, involves the rehabilitation of a 21-foot-wide roadway extending from Peltier Road to the North End in California. The scope of work includes resurfacing the road with 0.25 feet of Hot Mix Asphalt (HMA), repairing structural failures with full-depth HMA, and constructing 8-foot HMA driveways and frontages. Additionally, the project requires the installation of 4-foot-wide gravel shoulders with specific sloping, the application of penetration treatment at intersection radii, and the verification and placement of survey monuments by a Professional Land Surveyor. The project is categorized as a forecast with a posted date of August 4, 2025, and is qualitatively exempt under CEQA Section 15301(c) for existing facilities. Due to the rural environmental setting and the presence of protected species, a pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if work occurs between February 15 and September 1 to comply with the Migratory Bird Treaty Act. The primary point of contact is Fatima Gutierrez, Assistant Planner. While the project aims to increase public safety and reduce maintenance hazards, no specific contract value, formal solicitation number, or federal acquisition clauses have been established.

General Info

Davis Road resurfacing with HMA, gravel shoulders, bird survey required, CEQA exempt, San Joaquin County, Feb–Sept 2025.

Agency

California → San Joaquin County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Peltier Road, CA

Set-Aside

NONE

Documents

(1)

Davis Road Resurfacing Notice of Exemption and Environmental Filing Fee Receipt

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Fatima GutierrezAssistant Planner

Full Description

Show more
Project Location: Davis Road from Peltier Road to North End. See attached Vicinity Map. Project Justification: Davis Road’s original construction date and existing structural sections are unknown. The road has been periodically chip sealed by Road Maintenance with the most recent application occurring in 2019. The existing roadway exhibits frequent transverse and longitudinal cracking throughout the project limits with minimal to no shoulder backing. Scope of Work: The project will consist of: 1. Resurfacing existing 21-foot-wide roadway with 0.25 feet of Hot Mix Asphalt (HMA). No paving fabric will be used. 2. Repairing all pavement structural failure areas with full depth 0.25 feet HMA. 3. Constructing HMA driveways and frontages 8 feet in length from edge of pavement. 4. Placing 4-foot-wide gravel shoulders on both sides: 2 feet (8% slope) and 2 feet to conform. 5. Applying Penetration Treatment at all intersection radii plus 50 feet or to conform. 6. Professional Land Surveyor (PLS) verifying monuments in the field and advising placement of one new survey monument box to finished grade. Environmental Setting: In these portions of the San Joaquin County, land usage is rural with single family homes. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with this well-maintained road. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS