This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on March 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Deck Tile Covering System (Ripout/Install)_Rev3

Closed
N3904025Q0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
TSV4 NARR MESSING AND MODERNIZATION
Solicitation # N0018927QL008
NAVSUP FLT LOG CTR Norfolk is soliciting a firm-fixed-price contract for the development of a drawing package and Bill of Materials (BOM) to support habitability upgrades for the TSV4 Narragansett. The scope of work focuses on the vessel's messing, berthing, stateroom, and sanitary spaces at Joint Expeditionary Base Little Creek-Fort Story in Virginia Beach, Virginia. This effort is strictly limited to assessment and documentation; it specifically excludes any procurement, fabrication, removal, or installation of shipboard components. The project is a total set-aside for small businesses, including service-disabled veteran-owned small businesses, under NAICS code 336611. Key deliverables include a draft drawing package and BOM due 40 calendar days after award, with the final delivery of two electronic files and two full-size paper copies in NAVSEA format due within 61 calendar days. Contractors must adhere to several technical standards, including MIL-STD-2003 for electric plants, MIL-STD-777 for piping, and General Specifications for Overhaul of Surface Ships. A mandatory ship check at Colonna's Shipyard in Norfolk is required for eligibility, and failure to attend will result in disqualification. Award will be based on the best value, evaluating the mandatory ship check on a pass/fail basis and the technical approach on an acceptable/unacceptable basis, with the final selection going to the lowest total evaluated price.
Navsup Flt Logistics Ctr Norfolk

POSTED

about 18 hours ago

DEADLINE

in 8 days
NAICS: 336611
New
Federal
Voyage Repair (VR)
Solicitation # N6817127QN006
Solicitation N6817127QN006 is a request for a firm fixed price contract to perform voyage repairs for the USS RAFAEL PERALTA (DDG 115) in Mombasa, Kenya. The period of performance is scheduled from November 12, 2026, to November 19, 2026. The scope of work includes hull maintenance such as high-pressure washing and corrosion removal, systems repair involving the cleaning and inspection of refrigeration and air conditioning plant condensers, and general services including the provision of rigging, scaffolding, and furniture upholstery replacement. All work must adhere to NAVSEA Standard Items (FY27 CH-2) and specification package #NAPL-009-27, with safety standards governed by OSHA Part 1915 for shipyard employment. The contract will be awarded to the Lowest Priced Technically Acceptable offeror, with technical capabilities evaluated on an acceptable or unacceptable basis. Prospective contractors must be registered in the System for Award Management and submit quotes in English and US dollars by October 30, 2026. Required submission documentation includes Standard Forms 18 and 30, a completed price breakdown, and a signed non-disclosure agreement. Administration is managed by the Navsup Flc Sigonella Naples Office, with electronic invoicing processed through Wide Area WorkFlow. Key compliance requirements include the Defense Base Act for workers compensation and the submission of a detailed Test and Inspection Plan prior to the commencement of work.
Navsup Flc Sigonella Naples Office

POSTED

about 18 hours ago

DEADLINE

in 2 days
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified marine contractor to perform a complete propulsion repower and helm system integration for a 30 foot Munson Packman landing craft. The project involves a six-phase process including the decommissioning and removal of two existing Honda BF250A outboard engines, a structural assessment of the transom, and the installation of two new Honda BF250D Drive-by-Wire outboards. Key technical requirements include the installation of new-generation Honda iST electronic control heads at primary and secondary helm stations, integration with the existing NMEA 2000 backbone and SeaStar PA1315-2 Power Assist Steering system, and a comprehensive fuel system upgrade using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two-hour sea trial to validate performance and safety protocols. The Tribe will deliver the vessel to the contractor's facility, which must provide a secure, fenced yard or indoor shop. Proposals are due by November 13, 2026, and must be submitted in PDF format. Evaluation is based on a 100-point scale with significant preference given to Colville Business Enterprises and other Indian-owned businesses. Award criteria prioritize reliability and effectiveness over the lowest cost. Selected contractors must provide proof of Honda Marine Authorized Dealer status, maintain appropriate liability insurance, and agree to either a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. All payments are subject to the Tribes appropriation process and availability of funds.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 17 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Kittery, ME, 03904, USA

Set-Aside

SBA

Documents

4

N3904025Q0015 - Request for Quote (RFQ)

PDF, High priority: read this firstrfq
High

PNSY OPSEC Contract Requirements 24-138

PDF, High priority: read this firstspecifications
High

Portsmouth Naval Shipyard - QASP for Replacement of the Deck Covering System

PDF, High priority: read this firstqasp
High

Statement of Work for Vinyl and Wet Deck Tile Removal and Replacement at Portsmouth Naval Shipyard

PDF, High priority: read this first39 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Jan 30, 2025 to Feb 5, 2025. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 5, 2025 to Feb 6, 2025. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Feb 6, 2025 to Mar 18, 2025. The notice title changed. The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Portsmouth Naval Shipyard Gf
Contacts1 person available
OfficePORTSMOUTH, NH, 03801-5000, USA
Office AddressPORTSMOUTH, NH, 03801-5000, USA

Full Description

Show more
COMBINED SYNOPSIS/SOLICITATION NOTICE: Requirement Title: Replacement of the current Deck Covering System Solicitation Number: N3904025Q0015 Response Deadline: 1/30/2025 05:00 PM ET EXTENDED TO 2/5/2025 5:00PM ET EXTENDED TO 2/5/2025 11:59 ET POC: Alyssa Cress, +1 (555) 000-0000, contact@example.gov GENERAL INFORMATION: 1. This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued Paper copies of this solicitation will not be available. 2. This solicitation documents and incorporates provisions and clauses in effect through FAC 2025-03 and DFARS Change Notice 2025-0117. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these addresses: https://www.acquisition.gov/browse/index/far and http://www.acq.osd.mil/dpap/dars/change_notices.html 3. This solicitation is being issues as a(n): Request For Quotation (RFQ) 4. The Navy intends to award a firm, fixed price contract to the vendor who is evaluated to provide the best possible service IAW the SOW utilizing a price/technical tradeoff method as the source selection technique in accordance with FAR 15.101-1. 5. North American Industry Classification System Code (NAICS): 336611 6. Product Service Code (PSC): 2040 7. The size standard is: 1300 (Size standards in number of employees) REQUIREMENT INFORMATION: The Portsmouth Naval Shipyard requests responses from sources capable of providing the following: Remove/Replace Vinyl and Wet Deck Covering Systems IAW SOW RDD: 14 days after receipt of Notice to Proceed Rip out to occur approx. May of 2025 Rip out schedule of spaces to be determined with the ship Re-install to occur approx. January 2026 Place of Performance: Portsmouth Naval Shipyard, Kittery, ME 03904 ATTACHMENTS: Statement of Work (SOW) N3904025Q0015 Request for Quote (RFQ) Quality Assurance Surveillance Plan (QASP) Enclosure 2 PNSY OPSEC Contract Requirements 24-138 METHOD OF PROPOSAL SUBMISSION: Quotes shall be emailed. All responsible sources may submit a quote which shall be considered by the agency. System for Award Management (SAM): Vendors must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/. All quotes shall include this form filled out in its entirety, any pricing breakdown that explains the quote, and any technical information needed for technical evaluation. REVISION 1 TO ANSWER THE FOLLOWING QUESTIONS: Q: Could you confirm the period of performance, we are still not sure if the work is required to be done this year or next year. Ideally, we want to come start and be able to finish and mobilize one-time to site. A: the POP outlined in the RFQ is accurate; it is essential for this work to be performed in two visits. Q: Can you confirm if you have pics of the designated areas? A: Pictures are not available. Q: Are there any interferences in the areas that need to be removed? A: There are various small interferences that you as the WIL will have to be notified when they need to be removed so you can coordinate to have either shipyard or ship's force personnel remove them. There are also some areas that might have to be worked underneath components/desks that sit at various heights above the deck. Q: Will Navy ensure all personal items are removed prior to work starting? A: Personal items should be removed prior. Q: Will we be provided a staging area? A: Staging area will be negotiated - space is limited so depends on how much they want and can't guarantee how close to the sub it will be. Q: Are we removing all deck covering and going down to bare metal? A: All deck tile and deck leveler at least down to the paint layer will be removed. Most paint comes up when chipping up the deck leveler and it becomes down to bare steel and that is OK. If there is paint residue left that is also OK, as the paint is set to be prepared by shipyard personnel at a later date prior to reinstall. REVISION 2 TO EXTEND THE SOLICITATION DEADLINE TO 5:00 PM EST ON 2/5/2025 REVISIONS 3 TO CLARIFY THE FOLLOWING & EXTEND THE SOLICIATION DEADLINE TO 11:59 EST IB 2/5/2025: Q: Can the removal be accomplished all the same time? (meaning every space be available to be worked) over a period of approx. 1 month. Then come back when ready to re-install? A: All of the spaces will not be available at once. There will be other work going on. Contractor will have to work around any high priority work. We will work with the vendor on spaces available. In addition, there will be critical passageways that won't be able to be completely blocked off, they will have to do part of the passageway at a time so people can still pass through if necessary. With the processes and requirements for tenting work areas due to environmental and/or potential hazmat reasons, as well as the possibility that certain spaces won't be available due to conflicting work, I would doubt it would be able to be done in 1 month. However, the number of personnel the vendor plans on using and their proficiency and knowledge would influence this greatly. Working at night will allow the greatest ability to progress work.

More opportunities from Department Of Defense → Portsmouth Naval Shipyard Gf

Same awarding agency

NAICS: 532490
New
Federal
Rental of Propane Water Heater (600,000 BTU/hr) and associated components
Solicitation # N3904027Q3102
Portsmouth Naval Shipyard is soliciting quotes for the rental of one propane-powered water heater with a minimum output of 600,000 BTU/hr and associated components for use at Naval Base Point Loma in San Diego, California. This total small business set-aside under NAICS 532490 requires a frame or skid-mounted system equipped with lifting pad eyes, fork truck pockets, and a minimum 200-gallon external propane supply. The contractor is responsible for providing all necessary monitoring gauges, isolation valves, and safety features in compliance with ASME Boiler and Pressure Vessel Code Section IV and California emissions standards. The scope of work includes the equipment lease, freight, training, and comprehensive maintenance consisting of surveillance checks, weekly inspections, and repairs. The contract is a firm-fixed-price award based on the lowest price technically acceptable criteria, with the government reserving the right to award based on the ability to meet the required schedule. The base period of performance is from March 1, 2027, to May 31, 2027, with two optional one-month extensions available. Key deliverables include certification data reports, technical manuals, personnel rosters, and maintenance support plans, with electronic submissions managed through Wide Area Workflow. Additionally, contractors must adhere to strict Operations Security and Portable Electronic Device requirements to protect sensitive government information. Responses are due by November 3, 2026, and must include technical documentation of capabilities and past performance from the last three years.
Other Commercial and Industrial Machinery and Equipment Rental and Leasing

POSTED

5 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS