Deep Well and Chemical Feed System Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract mandates the installation of a 500 gallons per minute gravel-packed deep well alongside a chemical feed building equipped with systems for sodium hypochlorite, phosphate, fluoride, and lime slurry dosing. The project includes the integration of standby power infrastructure to ensure continuous operation during utility outages, as well as full SCADA system integration for remote monitoring and control of water treatment processes. Electrical controls must be installed and commissioned to support automation, safety, and regulatory compliance. All components are to be coordinated for seamless operation within a single, unified water treatment facility, with attention to material quality, installation standards, and long-term reliability. The work is to be performed under a subcontract with a response deadline of August 14, 2026, and falls under NAICS code 221112 for water supply and irrigation systems.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Georgia → City of Reynolds
Same awarding agency
