This Solicitation opportunity from Colorado was posted on January 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Exhibit A-Addendum 01: TCLP Sampling - Building #8 Burnham Yard: Technical report and field sampling forms regarding Toxicity Characteristic Leachate Procedure (TCLP) testing for lead-based paint (LBP) at the Wood, Tin and Coach Repair Shop (Building #8), Burnham Yard. The document details sampling conducted in November 2022, identifying that red clay painted brick exceeded the Federal Lead Standard for hazardous waste (65 mg/L vs 5 mg/L criterion), while other waste stream components remained below limits.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for General Decision Number C020240002 - Colorado Heavy Construction Wage Determination: U.S. Department of Labor wage determination (General Decision Number C020240002, dated 02/23/2024) for heavy construction projects in various Colorado counties. The document specifies minimum hourly wage rates and fringe benefits for multiple labor classifications, including electricians, plumbers, ironworkers, and power equipment operators, while incorporating requirements from Executive Orders 14026 and 13658.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB AAAA 2025-0131 - P3 Burnham Yard Demolition Addendum 01: Addendum No. 01 dated January 13, 2025, for solicitation IFB AAAA 2025-0131 regarding the P3 Burnham Yard Demolition. This document provides revisions to solicitation documents, including new exhibits for lead-based paint sampling, supplementary general conditions, and a bid alternate form. It also includes a Q&A section addressing project timelines (Feb 1 to May 15, 2025), lump sum award structure, noise ordinances, permit fees, and specific technical clarifications regarding asbestos abatement and demolition requirements for Building 1 and Building 17.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for P3CO-2403 Burnham Yard Redevelopment - Bid Alternates Form: A Bid Alternates Form for the State of Colorado Office of the State Architect, Project P3CO-2403 (Burnham Yard Redevelopment - Demolition). The document provides a structure for bidders to enter deductive alternate amounts, specifically referencing the removal of lead paint for Building #1.
DOCX
DOCX, High priority: read this firstbid-bond
HighAI Summary for P3CO-2403 Burnham Yard Redevelopment - Bid Bond Form: A standard bid bond form for the State of Colorado Office of the State Architect, State Buildings Program. It pertains to Project P3CO-2403 (Burnham Yard Redevelopment - Demolition) and requires a guaranty of 5% of the total bid price to ensure the principal executes the agreement and provides required bonds/insurance upon award.
DOCX
DOCX, High priority: read this firstifb
HighAI Summary for P3CO-2403 Burnham Yard Redevelopment – Demolition: Advertisement for Bids issued by the State of Colorado Department of Personnel & Administration for the demolition of five buildings and a turntable pit at the Burnham Yard site in Denver. The scope includes the removal of structures, foundations, and hazardous materials (including lead-based paint and ACM) in accordance with OSHA and CDPHE regulations. Estimated construction cost is between $500,000 and $5,000,000.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for P3CO-2403 Burnham Yard Redevelopment – Demolition Agreement: A State of Colorado Office of the State Architect Design/Bid/Build (D/B/B) Agreement (Form SC-6.21) for the Burnham Yard Redevelopment – Demolition project (P3CO-2403). The document includes the signature page, recitals, and articles governing the performance of work, time of completion, contract sum, and references the General Conditions (SC-6.23).
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for P3CO-2403 Burnham Yard Redevelopment - Demolition Bid Form: Official bid form for the State of Colorado Office of the State Architect, Project No. P3CO-2403 (Burnham Yard Redevelopment - Demolition). The document outlines requirements for the base bid, completion timelines, Colorado labor compliance (80%), SDVOSB certification, and bid guarantee requirements. It includes sections for bidder signatures and certifications regarding site examination and interested parties.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for P3CO-2403 Burnham Yard Redevelopment - Direct Labor Burden Calculation: A State of Colorado Office of the State Architect form for the Burnham Yard Redevelopment - Demolition project (P3CO-2403). This document requires contractors and major subcontractors to provide a detailed labor burden calculation (including taxes, pensions, and insurance) to be used in the construction agreement and for calculating future Change Order Proposals.
DOCX
DOCX, High priority: read this firstifb
HighAI Summary for P3CO-2403 Burnham Yard Redevelopment - Information for Bidders: This document provides detailed instructions for bidders regarding the Burnham Yard Redevelopment - Demolition project (P3CO-2403) for the State of Colorado. It outlines requirements for the bid form, electronic submission via Box.com, bid security (5% for bids over $50,000), and the 'lowest responsible bidder' award method involving additive and deductible alternates. It also specifies compliance with Colorado state laws, including prevailing wage and embodied carbon emissions reporting.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Section 01 41 00 Regulatory Requirements: Technical specifications detailing regulatory requirements for construction projects. It covers compliance with the Office of the State Architect, OSHA safety standards, confined space protocols, and comprehensive Storm Water Management Plan (SWMP) requirements, including permit obligations for the City of Denver and CDPHE.
PDF
PDF, Low priorityindustry-day
LowAI Summary for Burnham Yard Redevelopment - Demolition Pre-Bid Meeting Attendance: Attendance sign-in sheet for the Demolition Pre-Bid Meeting held on January 7 for the Burnham Yard Redevelopment project, conducted by the Colorado Office of the State Architect, Division of State Property. The document lists 33 attendees, including their names, companies, and contact information.
DOCX
DOCX, Low prioritycertification
LowAI Summary for P3CO-2403 Burnham Yard Redevelopment - Apprenticeship Utilization Certification: An Apprenticeship Utilization Certification form for the State of Colorado Office of the State Architect, specifically for Project P3CO-2403 (Burnham Yard Redevelopment - Demolition). The document requires the General Contractor to certify that subcontractors in specific trades participate in US Department of Labor registered apprenticeship programs per C.R.S. § 24-92-115.