This Combined Synopsis/Solicitation opportunity from Department Of Transportation was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Demolition, Removal, and Remediation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Contractor is required to perform demolition, removal, and remediation services at the GFL VOR facility in Glens Falls, New York, under a firm-fixed-price contract with a period of performance from August 10, 2026, to September 30, 2026. The scope includes abating approximately 850 square feet of asbestos-containing floor tiles and mastic, 2,100 square feet of asbestos-containing roofing, and two presumed asbestos-containing fire doors, as well as removing a lead-paint-containing TACAN antenna and support pole. The contractor must demolish a 36 ft. x 36 ft. equipment building and its attached radome, remove all associated foundations, site improvements including shelters, fencing, wooden power poles, electrical equipment, underground wiring and piping, and restore the site by excavating foundations to at least 1.5 feet below grade, backfilling with suitable material, and spreading a uniform 0.5-foot layer of fill over disturbed areas. The work must comply with all applicable federal, state, and local regulations, adhering to the most stringent requirement where conflicts exist. The contractor must submit a draft Demolition, Removal, and Restoration Work Plan within 10 business days after a kickoff meeting, which must detail technical methods, schedules, waste characterization sampling protocols, disposal facility identification, required permits, a Site Safety and Health Plan, and a Risk Management Plan. After a five-day government review period, the contractor must address feedback and submit a final work plan within five business days. All permits must be obtained by the contractor and appended to the final plan, and site close-out documentation is required. The contractor must possess required certifications for asbestos abatement and other specialized work, and all proposal submissions must include a completed SF-1449, a two-page technical narrative demonstrating competence, and a detailed firm-fixed-price breakdown covering labor, equipment, laboratory analysis, trucking, disposal, surveys, and permits, all submitted via email to roland.regan@dot.gov no later than August 4, 2026. The award will be made on a best-value basis, selecting the offeror with the lowest price among those submitting an acceptable technical proposal. The contract includes numerous FAR and TAR clauses governing whistleblower rights, small business set-asides, labor standards, cybersecurity, data protection, Buy American requirements, electronic invoicing via iSupplier, compliance with DOT safeguarding controls, seat belt use policies, and
General Info
Agency
Contract Value
$134,325.1NAICS
Place of Performance
Glens Falls, NY, 12801, USASet-Aside
Awardee
Award Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition.
The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1. Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report. The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary. Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped. In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required. Copies of the permits shall be attached to the work plan as an appendix.
Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a Risk Management Plan that identifies major risks and hazards on the site and discusses ways to minimize these risks. The contractor should expect a 5 business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.
See SOW for details.
More opportunities from Department Of Transportation → 6913G6 Volpe National Transportation System Cntr
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS