Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Desert Edge Mobility Plan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Desert Edge Mobility Plan is a non-binding feasibility and planning study conducted by the Riverside County Transportation Department to evaluate potential future transportation improvements in the Northern Coachella Valley region, particularly focusing on pedestrian and bicycle mobility. The plan does not commit any funding, approve specific projects, or impose requirements on the County or other entities; its purpose is purely informational, serving as guidance for future infrastructure decisions. The project has been determined statutorily exempt from review under the California Environmental Quality Act (CEQA) based on Sections 15262 (Feasibility and Planning Studies) and 15276 (Transportation Improvement and Congestion Management Programs), and it aligns with previously certified environmental analyses, including Environmental Impact Report No. 521 and General Plan Amendment No. 960 adopted in 2015. The plan is consistent with the County’s General Plan, adopted Specific Plans, and regional transportation objectives, and it was formally adopted through a Notice of Exemption filed with the Riverside County Clerk & Recorder. The solicitation number associated with this effort is D3-0114E, with a submission deadline of May 29, 2025, and the primary point of contact for inquiries is Don Copeland, Senior Transportation Planner. The work is funded through internal County resources, referenced by a funding line of 537280-20000-3130500000, and any billing is processed via an internal journal voucher system administered by the County Clerk & Recorder. No formal contract type, pricing, deliverables, inspection criteria, or FAR contract clauses are specified, as the initiative is not a procurement of goods or services but a planning document. There is no contractor involved, no competitive bidding process, and no representation or certification requirements from offerors, as the County is acting solely in an administrative and planning capacity. The project has no defined performance period beyond the submission deadline and does not involve physical deliveries, FOB terms, or packaging requirements. Oversight is managed internally by Jan Bulinski, Environmental Project Manager, and no traditional government contracting roles such as COR, COTR, or PCO are designated.

General Info

Desert Edge Mobility Plan is a non-binding, CEQA-exempt planning study for pedestrian and bicycle improvements in Northern Coachella Valley.

Agency

California → Riverside County

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Desert Edge Mobility Plan Notice of Exemption May 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Jan BulinskiEnvironmental Project Manager

Full Description

Show more
Pursuant to the California Environmental Quality Act (CEQA), a review of the above referenced project has been done and has been determined to be statutorily exempt from CEQA under State CEQA Guidelines Section 15262 (Feasibility and Planning Studies) and Section 15276 (Transportation Improvement and Congestion Management Programs) and the Riverside County Rules to Implement CEQA. The Desert Edge Mobility Plan involves feasibility and planning studies for possible future actions which the County Board of Supervisors has not approved, adopted or funded. This Plan does not impose any requirements on others or the County, but is to provide information and serve as guidance for any possible future transportation improvements to the transportation network and infrastructure in the Desert Edge areas of the Northern Coachella Valley region. Such transportation improvements have been considered and evaluated in the County of Riverside's Environmental Impact Report No. 521 for its General Plan Amendment No. 960 which was certified by adoption of Resolution No. 2015-259 on December 8, 2015, M.O. 3-54 by the Riverside County Board of Supervisors. The Plan was reviewed to ensure consistency of the County's General Plan, adopted Specific Plans within this region and other regional plans as further described in the Plan. In addition, the Plan involves a regional transportation improvement program that describes possible transportation network and mobility options to improve the safety, access and circulation for pedestrians and bicyclists in the Northern Coachella Valley region. This proposed Plan does not commit funding or approve any implementing mobility options; but merely adopts a pedestrian and bicycle transportation plan to aid in efforts to achieve the goals described in the Plan.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project in California. The project involves designing a new municipal groundwater production well to replace and decommission the existing Corydon well, with work divided into two phases: Phase 1 focuses on technical specifications, civil site design, line-bid items for drilling and abandonment, and full-time on-site construction management oversight; Phase 2 covers detailed architectural, civil, mechanical, structural, electrical, and instrumentation and controls design, along with a line-item bid schedule for equipping, testing, and commissioning the new well. The well must comply with AWWA potable water standards, feature a 24-inch stainless steel Ful-Flo louvered screen, match existing vertical turbine pump systems, and tie into the Corydon Blend station and Malaga blending location, meeting all requirements from the State Water Resources Control Board, Department of Water Resources, and Elsinore Valley Municipal Water District. The consultant will prepare a Preliminary Design Report, review up to 200 submittals, assist with domestic water supply permit amendments, and develop record drawings reflecting field changes while supporting start-up, commissioning, and operator training. Proposals must demonstrate relevant qualifications and experience with utilities or government agencies, a clear understanding of the project scope, a feasible schedule with risk mitigation strategies, innovative yet practical solutions, cost transparency, and overall proposal quality. The award will be based on demonstrated competence and professional qualifications, not lowest cost. Submission requires strict adherence to formatting guidelines including a cover letter, detailed staff resumes, representative project lists, three professional references, district contract history, and a fully itemized cost proposal broken down by task. Required certifications and documentation include American Iron and Steel Compliance, Lobbying Certification, Debarment and Suspension Certification, System for Award Management information, Executive Order N-6-22 Certification, Conflict of Interest Disclaimer, Insurance Acknowledgment, and Public Works Contractor Registration—all submitted via Attachment “2.” Additionally, the contractor must comply with Build America Buy America requirements, including domestic-content certifications and waiver memoranda for non-compliant materials, and adhere to federal mandates on telecommunications restrictions, anti-trafficking, environmental recovered materials, civil rights compliance, and sanctions against Iran and Russia. The proposal submission deadline is September 1, 2026, via the PlanetBids portal, with questions due by August 2
Ardurra Group, Inc.

POSTED

about 12 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project - Professional Design, Bidding Support, Engineering Services During Construction
Solicitation # corydon-well-replacement-project-professional-design-bidding-support-engineering-services-during-0
The Corydon Well Replacement Project, managed by Elsinore Valley Municipal Water District, seeks professional design, bidding support, and engineering services during construction for a critical water infrastructure upgrade in Lake Elsinore, California. The scope of work encompasses full-service engineering support from initial design through construction phase, ensuring technical accuracy, regulatory compliance, and efficient project delivery. The solicitation is open to qualified firms with experience in water system engineering and is specifically set aside for Disadvantaged Business Enterprises under Department of Transportation guidelines, reflecting a commitment to inclusive contracting. The project is identified under bid/contract number C2305 and falls under NAICS code 541330 for architectural and engineering services. The solicitation was posted on August 7, 2026, with a response deadline of September 1, 2026, and is being administered by AKM Consulting Engineers, which serves as both the contracting agency and point of contact. Primary communications regarding the solicitation should be directed to Katie Neubauer via phone or email provided. Although specific address details for the office or performance location are not listed, the project’s physical performance is confirmed to be in Riverside County, California. Interested parties are encouraged to review the full solicitation details through the official SBA opportunity portal to ensure alignment with all submission requirements and eligibility criteria for DBE participation.
AKM Consulting Engineers

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project involves designing a new municipal groundwater production well to replace and permanently abandon the existing Corydon Well on Elsinore Valley Municipal Water District property, with full engineering and construction support services required throughout both design and implementation phases. The scope encompasses hydrogeological evaluation, aquifer analysis, well design adhering to AWWA standards and matching the existing casing depth with a 24-inch stainless steel Ful-Flo louvered screen, civil and structural site design including grading, drainage, and utility coordination, mechanical and electrical engineering for well equipping, instrumentation and SCADA systems, geotechnical and soil testing, water quality sampling, environmental permitting with SWRCB and NPDES compliance, borehole geophysical logging, and comprehensive construction management with full-time on-site oversight during drilling and equipping. The project is divided into two phases: Phase 1 focuses on technical specifications, site design, bidding support, and construction management for drilling and abandonment, while Phase 2 covers detailed architectural, mechanical, structural, and electrical designs for facility equipping, testing, and commissioning, supported by engineering services during construction. Compliance with the Build America, Buy America Act and 2 CFR Part 184 is mandatory, requiring documented sourcing of domestic iron, steel, and manufactured products, along with certification of non-collusion and adherence to federal procurement rules. The consultant must submit a cost proposal with hourly rates broken down by task, capped at a not-to-exceed amount of $1,000,000, partially funded by a $400,000 BOR Grant, with the remainder covered by non-federal sources. The solicitation requires proposers to demonstrate relevant experience in municipal groundwater projects, provide detailed resumes of proposed key personnel including licensed California professionals, and confirm current certifications including DBE, MBE, WOSB, or small business status, as the set-aside prioritizes small, disadvantaged, and minority-owned businesses. Subcontractors must also meet these certifications and be disclosed in the proposal. Required documentation includes a Conflict of Interest Disclaimer, American Iron and Steel Certification, Certification Regarding Lobbying, Debarment and Suspension Certification, SAM registration, Public Works Contractor Registration, Executive Order N-6-22 Certification confirming no ties to sanctioned Russian entities, and a California Air Resources Board Certificate of Reported Compliance. Proposals must be submitted via the PlanetBids portal by September 1, 2026, and must include a cover letter, three references, insurance
GEI Consultants, Inc.

POSTED

about 12 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541330
New
International
Forestry and Parks - Request for Proposal - ENGINEERING, DESIGN AND CONSTRUCTION ADMINISTRATION CONSULTANT SERVICES at Moose Mountain Parking Upgrades at Kananaskis Public Land Use Zone
Solicitation # AB-2026-05557
The Consultant will be responsible for reviewing and validating the Integrated Development Plan for parking area upgrades at three locations within the Kananaskis Public Land Use Zone — the Base of Moose Mountain Road, the 2 Kilometer Parking Area, and the Top of Moose Mountain Road — with total new disturbances of approximately 0.429 hectares across the sites. This includes conducting field validation of proposed improvements, refining designs based on ground conditions, constructability, environmental constraints, regulatory compliance, traffic flow, parking functionality, and operational needs, all while adhering to approved disturbance limits unless additional approval is obtained from Alberta Forestry and Parks. The Consultant must apply proven non-urban park design practices throughout all project phases, from assessment and conceptual design through detailed design, regulatory approvals, tender documentation, construction administration, and final project close-out. The work requires full engineering and design services to deliver safe, efficient, and environmentally responsible parking infrastructure upgrades, including improved traffic circulation, vehicle movement, and site access. The project must be initiated within five business days after contract execution and completed by February 28, 2028, with all design, approvals, and construction oversight delivered on schedule. The locations are precisely defined by geographic coordinates, and the Consultant must work closely with the Province to ensure alignment with all regulatory, environmental, and operational expectations. The project is managed by Alberta Forestry and Parks, with Monica Purewal serving as the primary point of contact, and the solicitation number AB-2026-05557 governs all aspects of engagement.
Forestry and Parks

POSTED

about 18 hours ago

DEADLINE

in 27 days
View Details
NAICS: 541330
New
SLED
26-0088-2 Design Engineering Consultant for Wahlstrom/Forbes Pavement & Drainage Reconstruction
Solicitation # PE-77548-NONST-2027-000000401
Chatham County is soliciting proposals from qualified consulting firms to provide professional engineering services for pavement and drainage improvements along Wahlstrom Road and Forbes Road, aiming to resolve existing drainage issues and enhance the structural integrity of the roadway. The project requires a comprehensive evaluation of the current pavement conditions and the development of targeted recommendations for resurfacing and structural upgrades capable of supporting the high volume of heavy truck traffic alongside regular passenger vehicles. The selected firm must assess existing infrastructure, identify deficiencies, and propose durable solutions that extend the service life of the roads while improving overall performance and safety. The solicitation, titled Design Engineering Consultant for Wahlstrom/Forbes Pavement & Drainage Reconstruction with number PE-77548-NONST-2027-000000401, was posted on August 6, 2026, with a response deadline of September 8, 2026. The work is to be performed within Chatham County, Georgia, and the procurement is conducted under the state’s SLED agency framework. Interested firms should submit their proposals by the stated deadline, with all inquiries directed to Sabrina Tippett at stippet@chathamcounty.org. The opportunity is open to qualified vendors with demonstrated expertise in roadway design, pavement analysis, and drainage system engineering.
Chatham County

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details