Site Plan Review No. 24-003, General Plan Amendment No. 24-001, Zone Change No. 24-001

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Synergy Consulting proposes the construction and operation of two industrial buildings in the City of Lancaster, California, totaling 807,005 square feet. The project consists of one building of 401,973 square feet and another of 405,032 square feet, both standing 50 feet tall. Each facility will feature 51 loading docks and truck dock doors. The site plan includes 148 trailer parking spaces, 443 automobile parking spaces with EV capabilities, and 239,667 square feet of landscaping. Access to the property will be provided via driveways on Avenue L-12, Division Street, and Avenue M, with utility connections for electricity, natural gas, water, and wastewater utilizing existing adjacent infrastructure. The project, identified as Site Plan Review No. 24-003, General Plan Amendment No. 24-001, and Zone Change No. 24-001, was approved by the City of Lancaster on August 12, 2025. A critical component of the approval involves a general plan amendment and zone change to transition the property from Office Professional (OP) to Light Industry (LI) and Light Industrial (LI). Environmental compliance was addressed through a Mitigated Negative Declaration prepared under CEQA, which determined that the project would not have a significant environmental effect provided that specific mitigation measures are implemented. The project is located at the northwest corner of Avenue M and Division Street.

General Info

Synergy Consulting to build two 400K+ sq ft industrial buildings in Lancaster, CA, with zoning change to Light Industry, approved August 2025.

Agency

California → City of Lancaster

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Avenue M, Division Street, Lancaster, CA, 93534

Set-Aside

NONE

Documents

(1)

Notice of Determination for SPR24-003 GPA24-001 ZC24-001

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Lancaster
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Lancaster
Office AddressN/A
Contacts
Kendall BrekkeSenior Planner
Jessica HaughtonPresident

Full Description

Show more
The applicant (Synergy Consulting) proposes to construct and operate two industrial buildings totaling 807,005 square feet with one building totaling 401,973 square feet and the other totaling 405,032 square feet. Both buildings would be 50 feet in height and provide 51 loading docks/truck dock doors each. A total of 148 trailer parking spaces and 443 automobile parking spaces, including EV, would be provided on-site. Access to the project site would be provided from driveways located along Avenue L-12, Division Street, and Avenue M. A total of 239,667 square feet of landscaping will be provided throughout the project site. The project will connect to the existing utilities (e.g., electricity, natural gas, water, wastewater, etc.) with these utilities already existing adjacent to the project site. Connections would occur within the project site or existing roadways/rights-of-way. As part of the proposed project, a general plan amendment and zone change have also been requested. The general plan designation and zoning on the subject property is currently Office Professional (OP). The General Plan Amendment and Zone Change would change these designations to Light Industry (LI) and Light Industrial (LI), respectively.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity sewer mainline, decommissioning existing pump stations in the Romaine Village area, and installing service laterals for properties currently using onsite septic. The scope may also include minor transportation improvements, such as ADA curb ramp and intersection designs, with the selected consultant serving as the Engineer of Record during construction. The project is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The solicitation, numbered 27-3214, has a response deadline of September 29, 2026. Proposals will be evaluated based on project understanding and approach, team qualifications, and firm experience, with the City of Bend selecting the highest scoring proposer to negotiate a final scope and fee schedule. The goal is to have the project advertised for construction services in Fall or Winter 2027. Parametrix is specifically soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small and disadvantaged businesses.
Parametrix

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 541330
New
College Park East Stormwater Infrastructure Design Services - Seal Beach, CA
Solicitation # CIP SD2601
The City of Seal Beach is soliciting professional engineering and environmental design services for the College Park East Stormwater Infrastructure Project (CIP SD2601) to mitigate chronic flooding in the College Park East neighborhood. The primary objective is to advance the project to a shovel-ready condition through a comparative evaluation of two pump station siting alternatives, Ironwood and Aster Park, and the subsequent development of 60, 90, and 100 percent plans, specifications, and estimates. The scope of work includes the design of storm drain lines, culverts, catch basins, and detention basins, as well as providing supplemental field surveys, public outreach, and environmental permitting in compliance with CEQA and NEPA. This procurement is funded in part by a U.S. EPA Community Project Funding award and is subject to federal procurement standards under 2 CFR Part 200, including domestic-preference requirements and non-discrimination mandates. Selection is qualifications-based per the Brooks Act and California Government Code, with evaluation weighted toward scope understanding (40 percent), team qualifications (25 percent), and project approach (25 percent). The contract is structured as a professional services agreement on a time-and-materials basis with a not-to-exceed value of 1.3 million dollars. Key requirements include adherence to California prevailing wage laws, monthly invoicing, and the maintenance of detailed project records for three years following completion. Proposals are due by 2:00 PM on September 22, 2026.
PACIFIC Advanced Civil Engineering, Inc.

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-ready-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive and includes utility locating, potholing, geotechnical and geophysical investigations, LIDAR, and a wide array of engineering support covering civil, structural, mechanical, electrical, and instrumentation and controls. Additional requirements include cathodic protection system design, BIM/3D modeling, commissioning and startup planning, land surveying, CPM scheduling, and comprehensive environmental services such as hazardous materials surveys, permitting support, and compliance monitoring. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system. Responsive bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and OBE firms. Bidders must demonstrate the ability to maintain labor harmony, as Kiewit is a signatory to several collective bargaining agreements. The bid date is September 11, 2026, and the primary point of contact for the project is Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS