Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 2, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DESIGN/BUILD HVAC SYSTEM BLDG 133 LUKE AFB, AZ

Awarded
FA4887-11-R-0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing approximately ten linear feet of leaking heat pipe sections in both the Administration Building and King Hall. All work must conform to the Massachusetts State Plumbing Code and International Plumbing Code, utilizing new commercial-quality materials suitable for hydronic heating service. The contractor is responsible for removing all debris and repairing any facility damage caused during performance at no additional cost. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a bid validity period of at least 60 days. Required documentation includes a current SAM.gov UEI number, active registration, Massachusetts licensing, a W-9, a signed ETR Vendor Acknowledgement Form, and certificates of insurance. This is an SBA set-aside opportunity for various small business categories. Award selection is not based solely on the lowest price; ETR will evaluate cost, qualifications, and administrative compliance. The project is subject to federal regulations, including the Davis-Bacon Act, Service Contract Act, and specific FAR clauses regarding anti-lobbying and debarment. Performance bonds are required for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
MI 2026-14 Emergency Heating and Air Conditioning Services
Solicitation # MI 2026-14
Adams and Associates, Inc., contracting for the U.S. Department of Labor, is soliciting bids for emergency heating and air conditioning services at the Miami Job Corps Center in Florida. The period of performance runs from November 1, 2026, to October 31, 2027. The selected vendor will provide emergency HVAC repairs, with pricing required for non-emergency daytime services (8:00 am to 4:30 pm) as well as emergency, weekend, and holiday rates. As a federally funded facility, the Center is entitled to GSA pricing. Award decisions will be based on the most responsible bidder, considering cost, licensure, experience, and insurance capabilities. Eligible bidders must be small businesses or certified socioeconomic categories, including VOSB, SDVOSB, WOSB, and HUBZone. Mandatory requirements include a valid Unique Entity ID (UEI), active SAM.gov registration, and all necessary Florida state business and employee licenses. Vendors must maintain Workers Compensation, Automobile Liability, and Comprehensive General Liability insurance of at least $1,000,000 per occurrence. The contract is subject to the Service Contract Act (Wage Determination No. 2005-2248) and the Davis-Bacon Act, with a minimum wage of $13.65 per hour applicable through December 31, 2026. Bids must be submitted on company letterhead by October 23, 2026, and include a W9, Vendor Questionnaire, Authority to Commit, and a certificate of insurance. Payment terms are NET 30 days. Personnel performing work on-site must adhere to strict security protocols, including searches and a prohibition on fraternization with students and staff. All deliveries must be coordinated through the Center's security personnel.
Miami Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 2 days
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontracting opportunity to replace the HVAC system in Building 22 at the San Diego Job Corps Center in Imperial Beach, California. The project, categorized under NAICS 238220, has an estimated value between 0 and 25,000 dollars. The scope of work includes the removal and disposal of existing equipment and the installation of a new 5-ton condenser, furnace, 5-ton evaporator coil, condenser pad, gas flex, shut-off valve, pigtail, fused disconnect, electrical whip, and condensate drain. The contractor is responsible for providing all labor, materials, and refrigerant, and must deliver two sets of operation and maintenance manuals along with manufacturer and installer warranties. Bids are due by October 28, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form. Required submission documents include a detailed cost breakout, proof of insurance, three comparable references, and a completed supplier self-certification packet. A physical site visit and signature on the attendance roster are mandatory prior to bid submission. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent is required, and the awarded contractor must provide performance and payment bonds equal to 100 percent of the contract price from a surety with at least an A- rating. The contract is subject to the Davis-Bacon Act, requiring compliance with prevailing wage rates and the submission of weekly certified payroll. Contractors must also adhere to OSHA safety standards and provide all necessary personal protective equipment. Payment applications must be submitted to the procurement department using AIA Document G702 or an equivalent form, accompanied by a schedule of values via AIA Document G703. Final acceptance of the work is contingent upon inspection and approval by the San Diego Job Corps Center Facilities and Maintenance Department.
San Diego Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes the inspection, repair, and replacement of various components across eight exhaust fans, specifically addressing failed louver actuators, motor replacements, selector switch repairs, and the relocation of a thermostat. Contractors must provide detailed line-item pricing for each fan, separate pricing for system-wide component replacements, and detailed costs for labor and materials. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to a single responsible offeror based on technical acceptability and the lowest price. Key requirements include compliance with the Federal Acquisition Regulation, Davis-Bacon Act labor standards, and OSHA and EPA regulations. Contractors must be registered and licensed in the State of Kentucky, provide proof of insurance, and demonstrate the ability to secure performance and payment bonding. Administrative requirements include the submission of weekly certified payroll with every invoice and the provision of Materials Safety Data Sheets for all products used on site. The project involves a substantial completion process requiring a walk-through and final acceptance inspection. Quotes must be submitted electronically to the purchasing agent by October 30, 2026, and must include a completed New Vendor Profile and W-9 for any subcontractors.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of the existing dry system distribution piping network and failing air compressor across the Men's Dormitory (Building CM), Women's Dormitory (Building CW), and Recreation Building (Building D). The selected licensed fire sprinkler contractor must eliminate system leaks and install a new compressor sized according to NFPA standards to prevent equipment short-cycling. All work must adhere to NFPA 25 (2023 Edition) and local, state, and national codes, with a required performance period of 30 consecutive business days following the Notice to Proceed. Bids are due by December 1, 2026, and must be based on a mandatory site visit. Evaluation is based on overall best value and bidder responsiveness. For bids totaling $25,000 or more, a bid bond of 20% of the base bid is required at submission, and the awarded contractor must provide performance and payment bonds from an A-rated surety within five business days of the Intent to Award. Compliance requirements include adhering to Davis-Bacon prevailing wage rates for Idaho, submitting weekly certified payroll reports, and providing a 12-digit UEI number. Additionally, first-tier subcontractors with awards exceeding $45,000 must disclose debarment status per FAR 52.209-6, and contracts valued at $40,000 or more are subject to FFATA reporting.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall in Kentucky. The scope of work requires the contractor to furnish and install two 4-ton Trane split systems with a minimum 17 SEER rating, two 95% AFUE high-efficiency gas furnaces, and matching indoor evaporator coils using R-454B refrigerant. Additional requirements include the installation of a Honeywell Pro 8000 programmable thermostat, new refrigerant line sets, condensate drain piping, and pumps. The project must be completed within 45 days of award, and the contractor is responsible for all inspections, testing, and providing necessary operating and maintenance manuals. The contract will be awarded to the responsible offeror who is technically acceptable and provides the lowest price. To be considered, bidders must be registered and licensed in the State of Kentucky, verified through the SAM portal, and provide a minimum 90-day bid guarantee along with proof of ability to secure performance and payment bonding. Compliance with the Davis-Bacon Act and Certified Payroll Wage Rate requirements is mandatory, with weekly certified payroll and a signed Statement of Compliance required for invoice acceptance. All work must adhere to local codes, manufacturer specifications, OSHA, and EPA regulations. Quotes are due by October 30, 2026, and must include detailed labor and materials costs, a W-9, and a New Vendor Profile.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
The Career Systems Development Corporation is soliciting proposals for the replacement of twenty failed water source heat pumps at the Roswell JCC Male Dormitory Building in New Mexico. The scope of work includes the removal and off-site disposal of the damaged units and the installation of twenty new Bosch 1-ton units or equivalents. The installation must encompass all necessary ducting, electrical, gas, thermostat wiring, flexible hoses, and pressure valves. A critical safety requirement involves installing smoke dampers with fusible links in all vents leading into the plenum, ensuring all materials used in the plenum are plenum rated. All work must adhere to NFPA 101, NFPA 70, and applicable plumbing, mechanical, and building codes. This solicitation is set aside for small businesses and various SBA-certified categories. The project is subject to the Davis Bacon Act under Wage Determination NM20260014, Revision 1, requiring the submission and approval of weekly certified payroll reports prior to invoice payment. Proposals exceeding 100,000 dollars require payment and performance bonding for 100 percent of the contract value. Submissions must include a safe work process, detailed costs for labor and materials, equipment cut sheets, warranty information, and proof of licensure and insurance. Work is to be coordinated through the Facilities Department and may be scheduled Monday through Friday from 7:00am to 4:00pm.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 238220
New
WOJC – Buried Domestic Hot Water (DHW) Pipe Repair
Solicitation # wojc-buried-domestic-hot-water-dhw-pipe-repair-0
Education and Training Resources is seeking quotes for a subcontracting opportunity to repair buried domestic hot water piping at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work involves the excavation, location, removal, and repair of compromised piping up to 4 inches in diameter at two specific locations: behind Singletary Hall and on the east side of Harris Hall. The selected contractor must provide all labor, materials, and equipment, ensuring work adheres to industry standards, OSHA regulations, and the National Fire Protection Association's Life Safety Code. Deliverables include a one-year equipment and workmanship warranty and the submission of weekly certified payroll reports. Interested bidders must submit a detailed cost breakdown via a Bid Sheet, a proposed service schedule, and proof of required Massachusetts licensing and credentials by November 6, 2026. Mandatory administrative documentation includes a W-9, Vendor Acknowledgement Form, Certificates of Insurance, and an active SAM.gov registration with a Unique Entity ID. This solicitation is open to various small business designations, including VOSB, SDVOSB, WOSB, and HUBZone. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. Depending on the final project value, contractors may be required to provide payment and performance bonds for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 16 days
NAICS: 238220
New
CBP7792 Cafeteria Hot Water Heater Replacement
Solicitation # CBP7792
Management & Training Corporation (MTC) is soliciting bids for a fixed-price lump sum subcontract to replace a failing commercial natural gas-fired water heater at the Sierra Nevada Job Corps Center in Reno, Nevada. The project requires a licensed plumbing contractor to isolate, remove, and dispose of the existing unit and install a new 125-gallon commercial-grade water heater, specifically a Bock Model OT300N-A-H20 or an approved equivalent. The contractor is responsible for all labor, materials, permits, and testing to ensure reliable hot water service. To minimize cafeteria disruptions, utility-interrupting work must be performed during approved off-hours, such as weekends or after 8:00 PM. Bids are due by October 27, 2026, and will be evaluated based on overall best value, considering price, quality, delivery schedule, and relevant experience. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a W-9, and a Supplier Self-Certification form. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety. Compliance requirements include adherence to federal, state, and local codes, as well as Davis-Bacon Act prevailing wage rates per Wage Determination NV20250040. Contractors must provide a Unique Entity ID (UEI) and, for first-tier subcontracts exceeding $45,000, disclose debarment or suspension status under FAR 52.209-6. Final payment is contingent upon the submission of a Notice of Final Completion, certified payroll reports, a release of liens, and two sets of Operation and Maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
WOJC - Amana PTAC Coil Replacement
Solicitation # WOJC - Amana PTAC Coil Replacement (Administration Building)
Education and Training Resources is seeking quotes for a subcontracting opportunity to replace leaking coils in two Amana Packaged Terminal Air Conditioner (PTAC) units at the Westover Job Corps Center Administration Building in Chicopee, Massachusetts. The units are located in the first-floor conference room and the third-floor CTR classroom. The selected contractor must provide all labor, materials, and supervision to recover refrigerant per EPA Section 608, install genuine Amana OEM or approved equivalent coils, and verify the operational status of cooling, heating, airflow, and condensate drainage. A one-year equipment and workmanship warranty is required, and all work must comply with the International Mechanical Code, Massachusetts state and local codes, and OSHA safety standards. Bids are due by October 30, 2026, and a mandatory site walkthrough is scheduled for October 22, 2026. To be considered, bidders must submit a completed bid sheet with a detailed cost breakdown, a proposed service schedule, Massachusetts licensing and credentials, certificates of insurance, and a completed vendor packet including a W-9 and Vendor Acknowledgement Form. The winning bidder must maintain an active SAM.gov registration and a Unique Entity ID (UEI). Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. Depending on the project value, bonding requirements may apply: a 100 percent payment bond for projects between 35,000 and 150,000 dollars, and both 100 percent performance and payment bonds for projects exceeding 150,000 dollars.
Westover Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Project NUEX 09-1408 is a design-build contract for the upgrade and repair of the HVAC system in Building 133 at Luke Air Force Base, Arizona. The project involves an initial investigatory phase to identify deficiencies, followed by the development of design deliverables at 65, 95, and 100 percent completion. Key construction requirements include the replacement of the chiller with a screw type compressor, new pumps, VFDs, heating and domestic hot water boilers, hot water storage tanks, and an upgraded EMCS. The contractor is also responsible for evaluating the electrical system for compatibility and performing all necessary demolition and disposal. The contractor serves as the Architect of Record and must provide full-time site superintendence, quality control oversight, and comprehensive testing and balancing of equipment. The performance period is 180 calendar days from the Notice to Proceed. Deliverables include signed and sealed design drawings, as-built documents in AutoCAD and PDF formats, and a complete operations and maintenance package. The contract mandates strict adherence to DoD and Air Force standards, including hazardous materials inspections for asbestos and compliance with FAR safety and storage regulations. Final acceptance is contingent upon a pre-final punch list correction and a final government inspection.

General Info

Contract Value

$455,124.36

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

AZ, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts1 person available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA
Contacts
Jeffrey A KistlerCONTRACTING OFFICER

Full Description

Show more
1. Introduction: This Statement of Work (SOW) sets forth basic requirements for Project NUEX 09-1408, Work Order# 81825, to repair HVAC Building 133. This design- build project will require performance at Luke Air Force Base, Arizona. This project will be an upgrade to the existing HVAC system in Bldg 133. 2. Scope: The existing HVAC system in Bldg 133 consists of Pumps, Chiller, Piping, Heating and Domestic Hot Water Boilers, and 2 (ea) Hot Water Storage Tanks, to include all accessories. The existing Cooling Tower, Plate and Frame Heat Exchanger, and Condenser pump were replaced in March 2011, and will be part of the project to re-connect. The existing mechanical system will require inspection to identify the extent of the current deficiencies (i.e., investigatory phase). Additionally, the construction and repairs to remedy existing deficiencies are requirements of this contract. It must be acknowledged by the contractor that the work scope includes complete review of the mechanical rooms, preliminary documents, validation of the preliminary work and standards referenced, and identification of deficiencies against present day standards for an Air Force and DoD facility. Under this contract, the contractor may be tasked with validating construction price/cost and scheduling. The contractor will complete project design to 100% and then go on to complete the construction. Construction may begin after approval of the 65% design. Contractor will deliver and warrant the equipment and materials replaced. The objective of this project is to deliver a complete and usable mechanical system, such that it supports the present day mission and meets present day standards. This project work will include all demolition, disposal, material, labor, and testing to deliver complete, operational, and usable systems. 2.1 Minimum Replacement/Repair items: Additional items may be required based on investigatory design. 2.2 The work will include the following, with a performance period of 180 calendar days after issuance of a written Notice to Proceed, but not necessarily be limited to: 2.2.1 Demolition: Provide the Government a list of equipment to be demo and disposed to determine what the Government will keep. All other materials will be the contractor's responsibility to disposed. Refrigerant from machinery shall be recovered and returned to the Government. 2.2.2 Replace existing chiller with appropriate type and size based on investigatory study (use screw type compressor for increased efficiency) 2.2.3 Remove and replace existing pumps for entire HVAC/R system 2.2.4 Provide VFDs where they are needed 2.2.5 Evaluate current electrical system and upgrade if this existing is not compatible with new HVAC components 2.2.6 Replace existing heating boiler with appropriate type and size based on investigatory study 2.2.7 Replace existing domestic hot water boiler with appropriate type and size based on investigatory study 2.2.8 Replace existing hot water storage tanks to include all accessories with appropriate type and size based on investigatory study 2.2.9 Replace current EMCS to improve efficiency 2.2.10 The contractor will provide complete test and balance of applicable equipment to serve as a basis for acceptance of the replaced/repaired installation 2.2.11 The contractor will provide training, and a complete operations and maintenance package, for the future operation of the upgraded HVAC system. 2.2.12 Possible Asbestos, contractor will have a thorough inspection performed and given to the government (56th CES/CEAN) prior to any work beginning. 2.3 Design Services: During the design phase of the project, the contractor will utilize a professional consultant, herein after referred to as the A/E. The A/E is responsible for the development of the design deliverables. Specifically, the effort will result in documents that are the basis for the design and construction efforts under this contract. This effort necessarily includes development of a design basis (to include applicable codes, standards, and guidance) and outline specifications. The contractor will complete the design documents incorporated by reference below. Investigatory phase: The contractor shall visit the job site to re-verify location, conditions, quantities and dimensions previously determined during the design portion of the project, as part of his construction proposal preparation. The contractor shall coordinate with the Contracting Officer prior to the visit to the job site. 2.4 Technical Services: The contractor is the "Architect of Record" and, as such, will sign and seal all completed designs. The contractor is accountable for all aspects of the final design under Federal, State and applicable local laws. For reference purposes, a "completed design" within the process includes, (1) the design which is developed within the design and review process, and (2) as-built drawings accurately reflecting any modifications to Bldg 133 HVAC system. Drawings and as-builts will be delivered as AutoCAD and PDF formats. The final records, test reports, to include O&M manuals, shall be in PDF formats, as finalized with personnel in Engineering at Luke Air Force Base. The contractor is responsible for construction quality on the project. The contractor is required to make their own field investigations to verify dimensions and other information shown on Government furnished reference drawings. Coordination between the (A-E) design disciplines in production of the contract drawings is the contractor's responsibility. 2.5 Summary Status Reports: The contractor shall provide weekly and monthly progress reports for this contract. All information will be maintained in an electronic database (compatible with Microsoft Office Professional, current version) to facilitate summary retrievals. Reports will be acceptable in contractor format. 2.6 Quality Control (QC) Oversight: The contractor shall review, plan and/or develop QC procedures for this contract, and submit the Quality Control Plan within 15 calendar days after award under this contract for government approval. 2.7 Hazardous Materials: Materials survey may include destructive testing as necessary to ensure adequate investigation for hazardous materials. Base Environmental personnel and standards will be consulted for approval in this regard. 2.8 Site Cleanup: The contractor shall be responsible for assuring that the existing adjacent site features are not damaged, and remain in their original condition at the completion of the contract work. If the contractor fails to clean up at the completion of the work, the Government may do so as required, and the cost thereof shall be charged to the contractor. All contractor-generated refuse and waste shall be hauled from the building construction area and deposited in his waste dumpster, or such waste shall be removed from the site daily to a disposal area to be selected by the contractor, and located outside the physical boundaries of the installation. This refuse and waste material shall be hauled in trucks with tight-fitting beds to prevent spillage on roadways. The construction site shall be kept neat, orderly, and safe for workmen at all times. 2.9 Design-Build: Prior to beginning onsite construction, the contractor will initiate the Construction Phase by completing project working drawings and the various plans and schedules, including a construction schedule and obtaining submittal approvals and permits. Working drawings and specifications shall comply with codes, laws, and the Luke General Specifications. Contractor will utilize the 48 Division specification and will provide a 65%, 95%, and 100% design. The Contractor shall conduct design review meetings (i.e., 65%, 95%, 100%), as well as progress meetings during the construction phase, with Contracting and Civil Engineering. The working drawings shall be submitted for review, as directed in this Statement of Work (SOW). The contractor shall be responsible for implementation, coordination, and execution of all regulatory reviews, ensure technical adequacy of the final design, and provide quality control of all phases of the contract. Further details regarding design requirements will be provided by the 56th CES/CEPM project manager. 2.10 Construction: Upon the approval of the Contracting Officer, the contractor may commence onsite construction activities. Construction shall be phased to minimize impact to building occupants. Construction schedule shall be coordinated with Facility Manager. Further details regarding construction management requirements, inspection and testing, construction facilities and temporary controls, environmental protection, quality control system, construction quality control, and project closeout will be provided by the 56th CES/CEPM project manager. 2.11 Security: The contractor shall obtain and monitor security badges used by their own staff during the duration of this contract, in accordance with Clause L-727 of this contract entitled Contractor Access to Air Force Installations. 2.12 On-Site Field Oversight: The contractor shall provide the manpower, equipment, material, services, and transportation necessary to ensure oversight services during the construction phase of this contract. 2.13 Safety Requirements: The contractor shall conduct operations in accordance with FAR Part 52.236-13 and Alternate 1. During the performance of the work within the requirements of this contract, and until final completion and acceptance thereof, the contractor shall exercise the utmost care to avoid accident or injury to persons or property. Contractor shall place and maintain all necessary barriers and safeguards, including watchmen, if necessary, about the work site for the prevention of accidents and shall take all precautions required to protect personnel and property to include the general public and properties adjacent to the work site. 2.14 Storage: The contractor shall conduct operations in accordance with FAR Part 52.236-10. The contractor shall confine construction operations at the site to areas permitted by law, ordinances, permits, and the contract documents and shall not encumber the site with any materials or equipment without prior written authorization. Subject to prior written approval of exact location, appearance, and color of each, the contractor may be permitted to set-up an office trailer/portable building, a similar job tool trailer, and a waste dumpster in a location designated and approved by the Contracting Officer. The contractor shall store other materials and equipment at the site designated by the Contracting Officer at the end of each workday. The contractor shall coordinate all operations with the written approval from the Contracting Officer before using any portion of the site. 2.15 Pre-Final Inspection: The contractor shall request a pre-final walkthrough inspection by the Government, with a minimum of two-weeks notice. The Government will provide the contractor with the pre-final inspection findings (i.e., punch list) in a pre-final inspection report. Contractor will have approximately one (1) week in which to correct all punch list deficiencies. 2.16 Final Inspection: Upon completion of all punch list deficiencies discovered during the pre-final inspection, the contractor shall request that the Government conduct a final inspection and publish the findings in a Final Inspection Report, in accordance with the format specified at the pre-construction conference. The inspection shall concentrate on the items identified at the pre-final inspection and recorded in the pre-final report. The final inspection report shall also certify that all items of the design have been implemented and that the construction is complete. The final inspection report shall also include a record of "signed and sealed" design drawings, and as-built drawings, and specifications, verifying that all development standards have been met. At the final inspection, the contractor shall present a completed DD Form 1354, Transfer and Acceptance of Real Property to the Base Civil Engineer (BCE) for signature and acceptance. 2.17 Delivery/Warranty: The contractor shall complete all inspection and commissioning requirements prior to final inspection. Following final inspection, the contractor shall deliver to the Government the as-built drawings in the format and media as required by this contract. Further details regarding project closeout will be provided by the 56th CES/CEPM project manager. The warranty shall be issued in accordance with FAR 52.246-21. Extended warranties offered by the contractor and its subcontractors or suppliers may be accepted by the Government at its discretion. 3. Contract Requirements: The contractor's administration shall include the following: 3.1 Full time site superintendence. 3.2 Submission for approval of: Construction schedule(s) (Microsoft Project), progress schedules, material cut sheets, shop drawings. 3.3 Submission for approval of: Dig permits, confined workspace permits (if applicable), utility outage requests, and invoices for progress payment(s). 3.4 General work products should be in Microsoft Office format. Drawings, O&M manuals and final submittals are discussed in Section 2.F. Technical Services. 3.5 After the issuance of this contract, the contractor shall attend all meetings and teleconferences at the location specified by the Contracting Officer's Technical Representative (COTR). 3.6 The contractor shall prepare and publish all meeting minutes following PCO approval, track all action items assigned, and shall document all items discussed at a meeting, as well as each meeting's attendees. 4. Applicable Documents: Base specific documents are identified below. In addition, the contractor shall comply with all applicable (1) Federal, state, local, DoD, Air Force, and agency laws; statutes, ordinances, instructions, manuals, handbooks, regulations, guidance, policy letters and rules (inclusive of changes and amendments), (2) Presidential Executive Orders in effect on the date of issuance of this contract. It must be acknowledged by the contractor that the work scope includes complete review of the mechanical systems and preliminary documents, validation of the development of the design basis, and provision of the final design basis against present day standards for an Air Force and DoD facility. 4.1 Documents hereby incorporated by reference: 4.1.1 UFC 1-200-07a Design Build Technical Requirements 4.1.2 UFC 1-300-09 DD 1354 Guide 5. Special Notification: The contractor shall immediately report to the Contracting Officer (CO), via telephone, any data or results generated during investigations pursuant to this contract which may indicate any potential imminent health risk to contracted or federal personnel, or to the public at large. Following this telephone notification, the contractor shall prepare a written notice with supporting documentation and deliver it to the COTR within three (3) working days. The contractor shall provide written notification in the form of a signed letter scanned into Adobe Acrobat Portable Document Format (*.pdf) and send it to the Contracting Officer via email. Upon request of the COTR, the contractor shall provide pertinent raw laboratory data within three (3) weeks of the telephone notification. 6. Attachments: 6.1 Luke AFB Master Specifications (48 Divisions) 6.2 Luke Design Standards for electrical 6.3 Luke Mechanical Design Standards 6.4 Reference Drawings (Must be field verified)

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price contract requires a certified telecommunications contractor to engineer, furnish, install, and test new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting several critical facilities, including Radar Approach Control, the Air Traffic Control Tower, Base Operations, the Command Post, and various flightline and meteorological equipment such as Localizers, Glide Slopes, and TACAN. Installation will utilize a combination of existing manhole/handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, tools, and labor, as no government-furnished equipment will be provided. The procurement is a 100% set-aside for Women-Owned Small Businesses under NAICS 335921. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, based on evaluations of design, quality control plans, and performance history via the Supplier Performance Risk System. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Contractors must comply with strict base access security protocols, environmental regulations regarding hazardous materials and lead-based paint, and technical standards including TIA 526-7 for fiber optic testing. All payment requests must be processed electronically through the Wide Area WorkFlow system.
Fiber Optic Cable Manufacturing

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS