Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 3, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build Services for the Ft Harrison, MT VAMC Seismic Upgrade and Specialty Care Improvements; Phase I, Design-Build Central Utility Plant (CUP) and Parking Structure

Closed
W9128F23SC006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 11 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 11 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 11 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Harrison, MT, 59636, USA

Set-Aside

NONE

Documents

5

FHVAMC+Phase+I+Industry+Day+Brief.pdf

PDF

FTH+Industry+Day+Attendance.pdf

PDF

Phase+I+Sources+Sought+Attachment-JT.pdf

PDF

Questions_For_Industry.docx

DOCX

W9128F23SC006-Sources_Sought-Ft.Harrison_CUP_%26_PS.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Feb 3, 2023 to Feb 10, 2023. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA

Full Description

Show more
Sources Sought: W9128F23SC006 General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. Notice Details. The U.S. Army Corps of Engineers (USACE), Northwestern Division, Omaha District (CENWO) has been tasked to identify interest in a Design-Build Contract for Construction Services as defined below in support of CENWO's design and construction effort at the Fort Harrison Veteran's Affairs Medical Center (VAMC), Ft Harrison, MT. Responses to this sources sought announcement will be used by the Government to determine the appropriate level of small business participation and to develop the acquisition strategy. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of the small business members of the industry, to include: small business, small disadvantaged businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Economically Disadvantaged Women-Owned Small Business (EDWOSB) and Service-Disabled Veteran-Owned Small business (SDVOSB). All interested parties are highly encouraged to respond. Project Scope. CENWO intends to acquire Design-Build Services for the Ft Harrison, MT VAMC Seismic Upgrade and Specialty Care Improvements; Phase I, Design-Build Central Utility Plant (CUP) and Parking Structure. Preliminary planning and design is currently being performed to develop a Design-Build Request for Proposal to construct two facilities on the Ft Harrison Campus: and approximately 15,300 GSF Central Utility Plant (CUP) with utilities distribution system and an approximately 660 space Parking Structure north of the main hospital building, the demolition/modification of the existing campus heating/hot water system and chilled water system, and the demolition of old boiler plant and supporting backup generator buildings. The estimated magnitude of construction cost of this project is between $75,000,000 and $100,000,000, and the estimated period of performance is 975 calendar days from construction notice to proceed (NTP). General site conditions: The existing site is situated near the property line that borders the adjacent National Guard installation to the north, the existing B170 warehouse building to the west, and a potential Outpatient Mental Health Facility (Building 173 - to be constructed by others) to the east. The site is located partially on an existing parking lot, and the rest of the site occupies open undeveloped space with natural vegetation. At various times, there are a fluctuating number of shipping containers that may be located on or near the site. The site slopes generally from the west to the east. Surface water runoff is mostly sheet flows. There are no identifiable concentrated flows within the project site. Most of the campus has open section roadway (no curb and gutter), except for the area immediately surrounding the main hospital facility itself. There are some identified utilities that run through the project site, like sanitary sewer, signal / telecom utilities, and some water lines. There are existing light poles along the perimeter of the existing parking lot. Closer to the hospital, there is irrigated turfgrass, but that does not extend to the project area. Central Utility Plant: The structural system will be designed such that access to overhead pipe and duct support is possible. Design the building to allow all equipment to be installed and removed in the future. Given the building height (currently assumed to be about 30), and approximate size of the new CUP facility (~15,300 sq. ft.) the building will utilize exterior load bearing concrete masonry unit wall construction with exterior face brick to match brick used elsewhere on the campus. A rainscreen system will be utilized on all exterior walls and will include the following: exterior brick veneer, air space/drainage cavity, exterior rigid insulation, vapor barrier/drainage plane on concrete masonry block wall. Composite metal panels will also be used on the exterior face of the building at locations that lend itself well to a different material other than face brick. Similarly, a rainscreen system will be utilized with the composite metal panels. Utilities Distribution System: The distribution system is designed to connect the new CUP to the future hospital complex and the existing steam and chilled water systems. The distribution system is primarily routed underground in new utility corridors (approximately 8'x8) and also inside of the existing buildings to provide building cooling, heating, and domestic hot water needs to the following buildings: Building 141 including the Hydronic Plant, Building 154, Building 154A, Building 169, and future Building 173. The primary connection from the CUP to the Main Hospital Building 154 will be through the primary utilidor. This connection will be made to Mechanical Room B100 located in the basement of Building 154. Utility piping from the primary utilidor will reach the final equipment connection either using secondary utilidors or by utilizing the crawl space under Building 154 or routing through existing buildings. In addition to steam, steam condensate, and chilled water piping, the utilidors must be provided with lighting, ventilation, and drainage as required by code. The utilidor design must provide a safe working space as required. Building System Connection and Demolition: Work within the existing buildings includes connection of the new steam utilities from the CUP to the existing building steam systems and the replacement of the hydronic heating boilers in the Building 141 plant with shell and tube heat exchangers to convert the steam to heating hot water. The existing hydronic heating hot water distribution system within the buildings is to remain. Work within the existing buildings also includes connection of the new chilled water utilities from the CUP to the existing building chilled water systems. The existing chillers and chilled water distribution systems within the buildings are to remain as backup. The new chilled water connections to each chilled water distribution system must include flow metering and temperature monitoring in addition to motorized valving to allow selection of CUP chilled water operation or individual chiller system operation. Building 141 (existing hydronic plant) contains two (2) Superior fire tube hot water boilers installed in 2010 with MAWP of 60 psig and rated at 200 BHP or 6,700 MBH and two (2) Patterson Kelly hot water boilers installed in 2015 with 160 psig MAWP rated at approximately 60 BHP or 2,000 MBH. This equipment is to be replaced by heat exchangers supported by the new CUP with equipment to be salvaged with value recaptured in the project cost. The hydronic heating boilers and domestic water heaters in Building 169 are also to be replaced with shell and tube heat exchangers with the existing heating hot water and domestic hot water distribution systems to remain. Building 169 (Residential Rehabilitation) contains three (3) unitary boilers that are to be replaced by heat exchangers supported by the new CUP. This equipment is to be salvaged with value recaptured in the project cost. Building 171 (operational boiler plant) must remain online until the requirements for commissioning and stable operation of the new CUP are complete. Building 171 is equipped with three (3) Superior fire tube low pressure steam boilers (2012 build) that feature a maximum allowable working pressure (MAWP) of 30 psig and have a rated capacity of 8,625 lb/hr steam. Additionally, the building is equipped with two (2) Superior fire tube high pressure steam boilers (2012 build) that feature a maximum allowable working pressure (MAWP) of 150 psig and have a rated capacity of 5,175 lb/hr steam. Building 171 shall be gutted and left in an environmentally controlled state. The new CUP is to be operational for a period of not less than 10 days prior to decommissioning this plant. The existing ~10,000 gl underground storage tank will have to be removed as per Montana Department of Environmental Quality standards and the area restored. Building 142 (decommissioned Boiler Plant) and Building 159 (supporting generator) are to be deconstructed as part of this project. The four boilers contained within as well as the supporting generator are to be salvaged with value recaptured in the project cost. The A/E shall conduct an analysis of this as well as other contained equipment to determine the most fiscally appropriate course of action. The A/E will have to provide for MT SHPO considerations during demolition. Supporting under-ground storage tanks have previously been removed and hence no environmental risk is present. Parking Structure: The parking structure will include approximately 660 parking spaces. The project includes site improvements, rerouting of existing streets, site utilities, and a covered walkway. The facility will also include facility vertical transportation, facility mechanical, electrical, communications, and fire protections systems. The facility shall meet life safety, Physical Security, and accessibility requirements. The new parking structure will have covered parking and serve as the primary drop off location for the VA medical center, building 154. A connected covered walkway will connect the structure to the entry of building 154. The facility will have vertical transportation lobbies at each level. The exterior wall construction will consist of ornamental brick or metal panel cladding over concrete parking structural frame and vehicle barriers. The parking structure will not be conditioned. The top level parking deck should be configured for the addition of a roof of metal construction and also allow for the addition of photo-voltaic panels. The parking structure will include a reinforced concrete slab on grade with a reinforced concrete foundations at the base level, and the elevated structure is structurally framed of either cast-in-place post-tensioned concrete (one-way system) or precast prestressed double tee and girder construction. Service Access Road. Design and build an access road loop by extending Devil's Brigade Way around the north end of campus to allow for service access to B170 once the existing Devil's Brigade paralleling Patriot's Way is closed for construction. Communications with Industry. CENWO has scheduled a teleconference for interested parties where additional project information will be provided and questions may be addressed. The teleconference will be held on 19 January 2023 at 1400 CST. Please note, all information to be discussed is subject to change as additional project details become available. To receive the teleconference information and any exhibits to be presented, interested parties should contact Adam Beaver, Contract Specialist, at adam.l.beaver@usace.army.mil. The email must include: SUBJECT: - Sources Sought W9128F22SC006 - Ft Harrison, MT VAMC Seismic Upgrade and Specialty Care Improvements; Phase I, Design-Build Central Utility Plant (CUP) and Parking Structure Sources Sought - Teleconference Info Request CONTENT: Firm name and CAGE code, names of parties calling in, anticipated number of dial-ins, and any questions, recommendations, or concerns the firm has which may influence the acquisition strategy. Minimum Technically Acceptable Contractor Expertise Criteria: In preparation of interested party responses outlined in paragraph 6, firms should consider the following: Firms should demonstrate through references, project lists, or reports, that they possess experience as it relates to the project details. Responses including three (3) projects maximum, each no more than seven (7) pages, including any graphics and cover page, will be accepted for review. The Government may consider the past performance of key individuals and predecessor companies in evaluating the firm's previous experience and past performance factors. Firms should address within the content limitations above, the extent of small business participation in the projects submitted. The North American Industrial Classification Code (NAICS) for this requirement is: 236220, - Commercial and Institutional Building Construction. The related size standard is: $39.5M. Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically (via email) with SUBJECT: Sources Sought - Ft Harrison, MT VAMC Seismic Upgrade and Specialty Care Improvements; Phase I, Design-Build Central Utility Plant (CUP) and Parking Structure contract. Please email to adam.l.beaver@usace.army.mil. Responses must be received by 1400 on 3 February 2023, to be considered. However, the response date will be extended to 10 February 2023 to allow an opportunity to receive industry feedback on the recently published Questions for Industry attachment. The government will begin reviewing the submissions received, but will allow respondents to supplement their initial submission with any feedback they'd like to offer in consideration of the Questions for Industry attachment. Responses to this Sources Sought should be limited to fifteen (15) pages and include the following information: Firm's name, address, point of contact, phone number, e-mail address, CAGE and DUNS number. Firm's business category and size: Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged, 8(a) firm, Historically underutilized Business Zones (HUBZone), Economically Disadvantaged Women-Owned Small Business (EDWOSB), and Service-Disabled Veteran-Owned Small business (SDVOSB). Provide a maximum of three D-B project examples, similar in size, scope and complexity to the work described in paragraphs 3 and 4 of this notice, with a brief description of each project, customer name, and timeliness of performance, contract number, customer satisfaction, and the final project dollar value. The Government may verify information in CPARS or PPIRS. Disclaimer and Important Notes. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this sources sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. After a review of the responses a formal synopsis, requesting SF 330's, may be published on Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a formal synopsis. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov and remain current for the duration of the source selection process to be eligible for award of a Government contract. CENWO intends to synopsize a requirement for Design-Build Construction Services in support of Ft Harrison, MT VAMC Seismic Upgrade and Specialty Care Improvements; Phase I, Design-Build Central Utility Plant (CUP) and Parking Structure contract. The scope of this requirement has not been fully defined but is intended to produce a fully developed Request for Proposal to be issued during the Spring of 2023.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS