Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on December 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Documentation Development for GMP

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 13 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The West Basin Municipal Water District in California is seeking a subcontractor for a project focused on the development of comprehensive design documentation for public water infrastructure. The scope of work involves creating detailed drawings, schematics, and technical specifications specifically intended to support the establishment of a Guaranteed Maximum Price. This subcontract opportunity falls under NAICS code 541330. Interested parties must submit their responses by the deadline of February 6, 2025.

General Info

Documents

This scope was carved out of RFP-CA-0071.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Progressive Design-Build Services on West Basin MWD's DCS Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → West Basin Municipal Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop full design documentation including drawings, schematics, and technical specifications to support Guaranteed Maximum Price development for a public water infrastructure project.

More opportunities from California → West Basin Municipal Water District

Same awarding agency

NAICS: 541512
SLED
Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements
Solicitation # RFP-DS-0149
West Basin Municipal Water District is soliciting proposals for a System Integrator to replace three obsolete process-level Programmable Logic Controllers (PLCs) and associated SCADA equipment at the Torrance Refinery Water Recycling Plant. The project scope includes software development, network and panel design, programming, and the recommissioning of the Reverse Osmosis and Biofor systems. The selected contractor must adhere to strict technical specifications, including the District's IC&E Standards, PLC Style Guide, and PCS Tag Naming Standards. Key deliverables involve transferring control logic from existing controllers, developing HMI screens, and conducting both Factory Acceptance Testing and Site Acceptance Testing to ensure all alarms and functionality are maintained within the DCS system. Proposals are due by November 5, 2026, and require attendance at a mandatory pre-proposal conference and job walk held on October 7, 2026. Award decisions will be based on the best overall value, with additional evaluation points available for certified Small, Local, or Veteran Owned Business Enterprises. The contract will be governed by a Professional Services Agreement, with compensation provided on a time-and-material basis. Contractors must comply with California prevailing wage laws, District cybersecurity policies, and specific hardware labeling requirements, such as the use of UV stabilized Gravol or stainless steel nameplates. Invoices are to be submitted monthly with net 30 payment terms.
Computer Systems Design Services

POSTED

12 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS