Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 26, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Detroit Floating Screen Structure DDR

Awarded
W9127N-17-R-0055Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 8 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 10 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The Department of the Army, through the US Army Corps of Engineers Portland District, is seeking architectural and engineering services to develop a Design Documentation Report for a downstream fish passage floating screen structure at the Detroit Dam and Reservoir in Oregon. This total small business set-aside project involves creating a system to attract and collect juvenile fish, which will integrate with a selective withdrawal structure. The scope of work includes design analyses, hydraulic modeling, CADD drawings, 3-D modeling, and cost estimates, with a construction magnitude estimated between 25 million and 100 million dollars. Eligible firms must be owned and located within the United States and registered in the System for Award Management. Selection is based on demonstrated competence and qualifications, specifically focusing on specialized experience with fish passage systems, professional qualifications of key personnel, past performance, and knowledge of Pacific Northwest hydrologic conditions. The design is expected to be completed within 18 months of the notice to proceed, and all final documents must be stamped by a licensed engineer in the state of Oregon.

General Info

Contract Value

$5,305,116.96

NAICS

541330 - Engineering Services

Place of Performance

Detroit Dam, Linn County, Oregon, MILL CITY, OR, 97431, USA

Set-Aside

NONE

Award Issued Date

Documents

6

A_01_23_SOW_-_Detroit_FSS_Final.docx

DOCX

DDR_Formatting_and_Content_Guidelines.doc

DOC

Detroit_90_percent_EDR_Agency_Review.pdf

PDF

Past_Performance_Questionaire.pdf

PDF

SS_DRAFT_SOW_-_Detroit_FSS.docx

DOCX

USACE_Detrot_Forebay_CFD_Modeling_Report.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 8, 2017 to May 8, 2017. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts1 person available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA

Full Description

Show more
Synopsis C-Contract for A-E Design Services for Detroit Floating Screen Structure at Detroit Dam, Oregon Solicitation No: W9127N-17-R-0055 Agency: Department of Army Office: US Army Corps of Engineers, Portland District Location: Detroit Dam and Reservoir, Oregon I. Contract Information Competition is limited to prime firms and sub-consultants owned and located within the United States. This contract is being procured in accordance with the Selection of Architects and Engineers statute (formerly the Brooks Architect-Engineers Act) as implemented in Federal Acquisition Regulation (FAR) Subpart 36.6. Firms will be selected for negotiation based on demonstrated competence and qualifications outlined in FAR 36.602-1 and Defense Federal Acquisition Regulation Supplement (DFARS) 236.602-1 for the required A-E services. The estimated award date is June 2017 with a design completion within 18 months of Notice to Proceed. This procurement is for civil works designs with a magnitude of construction between $25,000,000 and $100,000,000, and is a total small business set-aside. The North American Industrial Classification System Code (NAICS) is 541330, which has a size standard of $15 million or less in average annual receipts over the last 3 years. The wages and benefits of listed services employees (see FAR 22.10) performing under this contract must be at least equal to those determined by the Department of Labor under the Service Contract Act under http://www.wdol.gov, as determined relative to the employee's office location (not the location of the work). To be eligible for contract award, a firm must be registered in the Department of Defense (DOD) System for Award Management (SAM). Register via the SAM Internet Site at https://www.sam.gov or by contacting the Service Desk at +1 (555) 000-0000. Small business contractors are advised that the Small Business Administration recently has issued regulations giving greater latitude to small businesses joint venturing with or subcontracting to similarly situated entities. Please see 13 C.F.R. Parts 121 and 125. Additional information on how to prepare an A-E submittal can be found in Engineering Pamphlet (EP) 715-1-4 - Competing for Architect-Engineer Contracts Awarded by the U.S. Army Corps of Engineers (9/30/2004), available on the U.S. Army Corps of Engineers (USACE) publications website: www.publications.usace.army.mil. ? II. Project Information The contract covers the architectural and engineering services necessary for the development of a Design Documentation Report (DDR) for a downstream fish passage floating screen structure (FSS) with an estimated maximum cubic feet per second (cfs) between 2000 - 5,400 cfs in the Detroit Dam and Reservoir. For reference, this project will be similar to the Round Butte Fish Collector, which is also gravity fed and comparable in size. The DDR formatting and content guidelines, as well as the Engineering Document Report (EDR) for this project have been provided for reference as attachments and shall be used in support of the development of this DDR. The purpose of this FSS is to attract and collect juvenile fish in the Detroit reservoir. The USACE Portland District (CENWP) is simultaneously designing a selective withdrawal structure (SWS) with a weir box to provide temperature control in the North Santiam River. The weir box will be used to provide downstream fish passage until the FSS is designed and constructed. It is CENWP's intention for the flow to pass through the FSS, screen out the fish, pass through the SWS, and ultimately pass through the turbines and further down river. The fish that were separated from the flow and collected will be passed further downstream. It is anticipated that the FSS will need to be anchored to the SWS. These connections are required to maintain alignment of the system, withstand and allow vertical movement of the structure through pool fluctuations, and withstand wind and wave loads applied through the FSS. Flow entering the FSS will be passed through a v-screen. Mechanical equipment on the FSS will include dewatering screen cleaners, flow control devices through the dewatering screen, various pumps, fish separation systems, gates to divert fish to the desired holding tank, fish crowding systems, and hopper and lift details. The work required to prepare the DDR for the FSS, in accordance with ER-1110-2-1150, is to include: 1. Design analyses and calculations 2. Physical and numerical hydraulic modeling 3. CADD Drawings and a 3-D model 4. Quantity and cost estimates 5. Proposed construction schedule The selected firm will be required to follow the National Marine Fisheries Service (NMFS) Anadromous Salmonid Passage Facility Design criteria (http://www.westcoast.fisheries.noaa.gov/publications/hydropower/fish_passage_design_criteria.pdf), and the applicable USACE Engineering Regulations and Manuals, local codes, and laws. The selected firm must use Autodesk or Bentley software applications to produce drawings and BIM deliverables. All drawings produced will be in compliance with the Architectural, Engineering and Construction (A/E/C) CAD Standard as issued by the CAD/BIM Technology Center https://cadbimcenter.erdc.dren.mil/CAD. Cost estimating services provided under this contract shall comply with USACE estimating polices of ER-1110-2-1150, ER 1110-2-1302, and ETL 1110-2-573. Cost Estimates shall be approved and signed by an individual certified in construction cost estimating. Reference http://www.nww.usace.army.mil/Missions/CostEngineering.aspx for cost estimate product templates, tools and samples. The selected A-E firm will be required to develop an internal quality control plan for review and approval. The quality control plan will be required within 10 calendar days after award and be in accordance with USACE Quality Management outlined in ER-1110-1-12. The selected A-E firm also will be required to provide documents in .pdf format. Final documents will be required to be stamped and signed by a licensed engineer in the state of Oregon. The contract requires that the selected A-E Firm have online access to web-based support programs and email via the Internet for routine exchange of correspondence. III. Evaluation Criteria The evaluation board will conduct evaluations of the SF 330s submitted in response to this synopsis to establish the most highly qualified firms. Following evaluations of SF330s, the evaluation board will hold discussions with at least three of the most highly qualified firms regarding concepts and the relative utility of alternative methods of furnishing the required services. Thereafter, the evaluation board will prepare a selection report recommending, in order of preference, at least three firms that are considered to be the most highly qualified to perform the required services. The firms/teams that demonstrate highest aggregate qualifications relevant to the primary selection criteria are considered to be the most highly qualified. If two or more firms are technically equal, the secondary evaluation criterion will be used as a "tie-breaker" among technically equal firms. The above-mentioned "Project Information" will be considered in evaluation of all criteria. Criteria a-e are primary criteria and are listed in descending order of importance, and criterion f is a secondary criterion. a. Specialized Experience and Technical Competence. The board will evaluate project submissions in order to evaluate the proposed team's specialized experience and technical capabilities related to the design of downstream fish passage systems. In Part I, Section F of the SF 330, submit up to five (5) projects demonstrating similar work performed by the A-E prime or proposed subcontractors/consultants within ten (10) years of the date that proposals are due. The Government will review project information in order to determine the firm's specialized experience and technical competence with the following relevant work: - Designing downstream fish passage floating screen structures similar to the requirements set forth in the Statement/Scope of Work - Designing in compliance with NMFS Anadromous Salmonid Passage Facility Design criteria - Designing fish passage structures at dams within the Pacific Northwest - Using state-of-the-art technology Projects performed by the prime or a Joint Venture partner will receive additional consideration over those performed by other members (i.e. subcontractors or consultants) of the proposed team. b. Professional Qualifications. The Government will evaluate the professional qualifications of the personnel to be assigned to this project, taking into consideration relevant experience, education, professional engineer (PE) registration, and other professional qualifications. At a minimum, resumes for the following key disciplines must be included in section E of the offeror's SF 330: - Hydraulic Engineer - Fish Biologist - Naval Architect - Structural Engineer - Mechanical Engineer - Electrical Engineer - Cost Estimator c. Past Performance. The Government will evaluate the projects submitted in Part I, Section F of the offeror's SF 330 discussed in paragraph a. above in terms of cost control, quality of work, and compliance with performance schedules. For each project submitted in Part I, Section F of the offeror's SF 330 discussed in paragraph a. above, submit: - A completed Contractor Performance Assessment Reporting System (CPARS) evaluation, if available. - If a completed CPARS evaluation is not available, submit a completed Past Performance Questionnaire (PPQ) for the project. The standard PPQ for USACE is Form PPQ-0 (9/30/11), and is provided as an attachment to this synopsis. Offerors are advised to ensure correct phone numbers and email addresses are provided for the client point of contact. Do not submit a PPQ when a completed CPARS evaluation is available. o If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). o Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, David Dvorak, via email at contact@example.gov, prior to the submission closing date. Offerors shall instruct the clients to refer to the synopsis number in the subject line. o PPQs are source selection materials. All successfully submitted PPQs will receive an email confirmation upon receipt. If the offeror does not receive the confirmation, it is the offeror's responsibility to follow up to ensure the Government has received the information. Any ratings, letters of appreciation, awards, etc. provided by the offeror for these projects also will be evaluated. In addition to the above, the Government may review other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS (Past Performance Information Retrieval System) including CPARS, using all CAGE/DUNS (Commercial and Government Entity/Data Universal Numbering System) numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror's SF 330, inquiries of owner representative(s), FAPIIS (Federal Awardee Performance and Integrity Information System), or other databases; telephone interviews with organizations familiar with the offeror's performance, Government personnel with personal knowledge of the offeror's performance capability, and any other known sources not provided by the offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. In reviewing past performance information, the Government will take into account the relevancy of the past performed work in addition to how well the offeror performed. d. Capacity to Accomplish the Work. In Part I, Section H of the SF 330, demonstrate the firm's ability to perform the work on schedule and capacity to accomplish this project. Indicate the firm's present workload and the availability of the project team (including consultants) for the contract performance period. Explain how the firm will integrate the work required under this contract with the firm's other workload, which may overlap with this required work. Firms will be evaluated on their ability to accomplish the work within the required timeframe. e. Knowledge of Locality. In Part I, Section H of the SF 330, demonstrate the firm's familiarity with the hydrologic conditions and fish patterns unique to dams in the Pacific Northwest. Firms will be evaluated on the demonstrated breadth and depth of their knowledge in this regard. f. Geographic Proximity. The geographic proximity of essential staff of firms for this project located within the boundaries of the Portland District's Area of Responsibility (AOR) will be considered in the case of equally rated firms. AORs can be found on the following link http://www.usace.army.mil/Locations.aspx. This evaluation will be based upon the information provided in Block 15 of the r'sum's provided in Part I, Section E of the SF 330. IV. Submission Information Interested A-E firms having the capabilities to perform this work must submit three copies and one CD of the SF 330 for the prime and all consultants, to the below address not later than 2:00 p.m. (PDT) on 08 May 2017. Submission Page Limitation The submission, including the SF 330 Parts I and II, shall not exceed 60 pages and should include any information the A-E firm feels may be of benefit to it in the evaluation and selection process. The submission must include a completed SF 330 Parts I and II and the firm may use its discretion on how best to present the information requested within this synopsis and attachments. Submissions exceeding the maximum page limitations will have the extra pages removed and will not be evaluated. The following are excluded from the 60-page limitation: submission transmittal cover pages, tab pages, tables of contents, signed amendments (if applicable), copies of Section I from submitted PPQs, and completed CPARS evaluations. A tab page is defined as a blank sheet used to separate the submission pages and may include a section heading. Any additional information provided on a tab page, other than section heading, will result in the tab page being counted against the 60-page limitation. The submission may be submitted on single- or double-sided sheets, but shall not exceed the 60-page limitation. Each 8" x 11" sheet will be considered one page when printed on one side and considered two pages when printed on both sides. Printed pages and illustrations shall be legible and no larger than 11" x 17" foldouts, as appropriate for the subject matter. The 11" x 17" paper must be for the exclusive presentation of tables, figures or illustrations. Each 11" x 17" page will be considered two pages when printed on one side and considered four pages when printed on both sides. Address for Submission USACE Portland District ATTN: David Dvorak, CECT-NWP-C W9127N-17-D-0055, Detroit Downstream Passage Floating Screen Structure 333 SW First Avenue Portland, OR 97204-3495 V. Additional Information Questions and Inquiries about this Synopsis All inquiries regarding this synopsis will be submitted via ProjNet-BidSM. Telephone and email inquiries will not be accepted. ProjNet-BidSM is a web-based program that allows submitters to post questions regarding the synopsis and to view all questions by other submitters and answers by USACE. ProjNet-BidSM can be accessed through ProjNetSM at https://www.projnet.org/projnet/. To access the ProjNet-BidSM website the first time: (1) Click the Bid tab (2) Click Bidder Inquiry. (The Agency is USACE.) (3) Enter the following information for access: (i) The Bidder Inquiry Key: 284IC4-TTN32X (ii) Valid business contact information (e.g., company name, contact person, business address, phone number and email address) (required on first project only) (iii) Establish secret question and answer which will be used as a password (required on first project only) (4) For subsequent access use your email address, the Bid Inquiry Key, and response to the secret question to access the ProjNet-Bid Module. (5) Submit questions or review questions and answers. A firm that submits a question will receive an automated email notification that its question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review. (6) A specific step-by-step for POSTING YOUR INQUIRIES is available in the Reference link on the Contract Viewer. (7) For questions about the ProjNet-Bid, please contact the Call Center help desk toll free at 1-800-428-HELP, which operates from 8:00 a.m. to 5:00 p.m. (Central US time zone). ProjNet-Bid questions can also be emailed to the helpdesk at contact@example.gov. The cutoff for questions and inquiries is 01 May, 2017, 3:00 p.m. (PDT). All submitters will be held to have reviewed the questions and responses in ProjNet-Bid prior to their submission. Administrative questions should be directed to David Dvorak +1 (555) 000-0000. Secondary point of contact is Laurie Gillespie +1 (555) 000-0000. Point of Contact for small business questions or assistance is the Portland District Deputy for Small Business, Carol McIntyre, at +1 (555) 000-0000 or contact@example.gov.

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 17 hours ago

DEADLINE

N/A
View Details
NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007)
Solicitation # W9127N27BA007
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project, identified by solicitation number W9127N27BA007, has an estimated construction value between 25 million and 100 million dollars. The scope of work involves replacing primary chillers, installing four new chiller skid packages with 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system integrated with fire protection systems. The project requires extensive structural modifications, the installation of air-cooled and water-cooled systems, and the use of refrigerants that are not subject to future phase-out schedules. Construction is expected to take 1,004 calendar days following the Notice to Proceed and will occur within an active powerhouse containing high-voltage electrical equipment. Due to the nature of the work, contractors must adhere to strict safety protocols and may be required to perform asbestos abatement and lead mitigation. A critical requirement for award is CMMC Level 2 (Self) certification for the prime contractor and relevant subcontractors processing Controlled Unclassified Information. This is an unrestricted, full and open competition under NAICS code 238220, with a tentative solicitation issuance date of October 29, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 17 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
Federal
JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
Solicitation # W9127N27BA009
The U.S. Army Corps of Engineers Portland District is soliciting firm-fixed-price bids for the repair and rehabilitation of Tainter Valves TV3 and TV4 at the John Day Lock and Dam in Klickitat County, Washington. The project scope includes crack and weld repair, seal replacement, and the procurement of spare bushings, with an estimated construction magnitude between $1,000,000 and $5,000,000. The work is categorized under NAICS 237990 and is a full and open competition. Mandatory requirements include adherence to EM 385-1-1 safety standards, CMMC Level 1 certification, and the provision of performance and payment bonds. Bidders must also comply with the Davis-Bacon Act and Buy American requirements. The solicitation includes mandatory price items for mobilization and the removal, transport, and repair of TV3, with optional line items for the same services for TV4. Evaluation will include a 10 percent price preference for HUBZone small business concerns and a review of subcontracting plans to ensure goals for small businesses and HUBZone firms are met. Bids must be submitted in PDF format to the designated contracting personnel by 11:00 A.M. PDT on November 19, 2026. Site visits were scheduled for November 3, 2026, requiring attendees to be U.S. citizens with a REAL ID. Performance is expected to begin within 10 calendar days of award, with specific completion timelines of 143 to 233 calendar days depending on the line item.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS