Development Permit and Environmental Assessment Application No. P21-03293

Forecast
P21-03293State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Development Permit and Environmental Assessment Application No. P21-03293, filed by G4 Enterprises LTD, authorizes the development of a 15-acre truck trailer storage lot at the northeast corner of South East Avenue and East Central Avenue in Fresno, California. The project is designed to support operations at the adjacent Building 31 and includes the construction of 357 trailer parking spaces, including 10 stalls for future electric trucks. Key infrastructure improvements consist of a 7-foot security fence, a 260 square foot security building, pole lighting, and approximately 300 feet of curb, gutter, and sidewalk improvements along South East Avenue. Additional site work includes the installation of a water main along Central Avenue, landscaping, and the implementation of storm drain piping and inlets. The facility will operate 24 hours a day, seven days a week, with a new ingress point at South East Avenue and an existing egress at the southeast corner of the Building 31 site. The project is situated within the Heavy Industrial/Urban Growth Management zoning district and has been approved under a Mitigated Negative Declaration, confirming no significant environmental impacts provided specific mitigation measures are met. Regulatory oversight includes compliance with CEQA and NEPA standards, air quality regulations from the San Joaquin Valley Air Pollution Control District, and stormwater erosion controls approved by the Regional Water Quality Control Board. The City of Fresno Planning and Development Department serves as the lead agency, with Thomas Veatch acting as the primary point of contact.

General Info

G4 Enterprises to develop 15-acre truck trailer storage lot with 357 spaces, 10 electric stalls, security fence, lighting, and stormwater systems in Fresno.

Place of Performance

South East Avenue and East Central Avenue, Fresno, CA, 93725

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Interested Companies (1)

Crawford & Bowen PlanningVisalia, CA

Full Description

Show more
Development Permit and Environmental Assessment No. P21-03293 was filed by G4 Enterprises, LTD (herein. "Project Applicant") and proposes to develop a truck trailer storage lot on an approximately 15-acre site located at the northeast corner of South East Avenue and East Central Avenue in Fresno. CA 93725, (APN: 330-021-31 ). The proposed storage lot would provide truck trailer storage for the user of Building 31. located immediately north of the site at 3611 South North Pointe Drive, Fresno, CA 93725, APN: (330-021-82S). The location of the proposed storage lot, immediately adjacent to Building 31, will provide operational efficiency for this industrial user. The storage lot is intended to supplement activities occurring at Building 31, and all truck trips utilizing the storage lot were considered when Building 31 was approved under Development Permit (D-17-175),Major Revised Exhibit (P20-03406), and Minor Revised Exhibit (P21-03615). The proposed storage lot and modifications to the existing Building 31 parking lot comprise the proposed Project.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California → City of Fresno

Same awarding agency

NAICS: 236210
SLED
P21-06100 - Development Permit
Solicitation # P25-03460
The City of Fresno has issued a development permit for the expansion of California Natural Color operations, owned by E & J Gallo Winery, located at 5631 East Olive Avenue, Fresno, California. The project involves the construction of a 28,000 square foot two-story steel building that will connect the existing dryer and dry storage warehouse. This expansion increases the total building area to approximately 46,700 square feet and allows for the addition of four new dryers over the next four years, bringing the total to five. The scope of work includes new grading, paving, parking stalls, the relocation of perimeter fencing and gates, and a lot line adjustment between parcels owned by the winery. The new facility will utilize existing site infrastructure for electricity, potable water, natural gas, steam, and compressed air, with no additional sanitary sewer waste generated. Key operational requirements include a sanitary design for food ingredient production and the completion of a dust hazard analysis for milled products. The facility also manages hazardous CIP cleaning chemicals for sanitization. Environmental review concluded that the project does not create significant new impacts, making an addendum to the original Mitigated Negative Declaration appropriate under CEQA Guidelines. The expansion is expected to add five employees and result in a negligible increase in daily truck traffic. Safety measures include a one-acre buffer zone between facility boundaries to ensure vehicle safety during construction.
Industrial Building Construction

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 813410
SLED
Service Agreement to provide funding to Fresno Metro Ministry for community garden liaison services.The City of Fresno has entered into a service agreement to fund Fresno Metro Ministry for community garden liaison services, focusing on the activation of two previously built garden sites—McKinley Peace Garden and Romain Community Garden—and the continued operation of the Lowell Community Garden. The scope of work includes managing gardener applications and sign-ups, setting and enforcing garden hours, establishing and upholding community guidelines, overseeing water conservation and green waste practices, and coordinating regular community meetings. All activities are confined to existing infrastructure with no new construction, ground disturbance, or expansion of capacity beyond what was previously approved, ensuring the project will not result in significant environmental impacts. The initiative aims to enhance community engagement and sustainable urban gardening through supportive, day-to-day management of these established sites. Funding for this initiative is provided under a forecasted service agreement posted on August 7, 2026, with no solicitation number or set-aside designation specified. The agency responsible is the City of Fresno, located in California, with performance taking place entirely within Fresno. Primary point of contact for the contract is Elizabeth Fraire, Business Manager, who can be reached via email at [email hidden] or by phone at [phone hidden]. Further details are accessible through the project’s online portal linked in the contract data.
Civic and Social Organizations

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237110
SLED
Booster Pump Replacements at Pump Station 89A, 150, 176
Solicitation # 12601793
The City of Fresno awarded a firm fixed price construction contract valued at $2,538,800 to W. M. Lyles Co. for wellhead treatment improvements at Pump Stations 89A, 150, and 176, with the primary objectives of enhancing system performance, efficiency, and water quality. Scope of work includes replacing booster pumps at all three locations, installing new interconnecting piping, upgrading associated electrical and instrumentation systems, and constructing a new aeration tank exclusively at Pump Station 89A. A subsequent amendment also required replacement of a carbon dioxide removal tank at PS 89A. All work is confined to existing facility boundaries under a categorical exemption under CEQA Section 15301, Class 1, which precludes significant environmental impact or operational expansion. The project was procured via a competitive sealed bid process with award determined under the lowest price technically acceptable (LPTA) methodology, where responsiveness and responsibility were evaluated prior to price being the sole deciding factor. The contract does not include federal acquisition regulation clauses, instead relying on municipal standards and custom agreements. Performance is required at the three specified pump stations in Fresno, California, with acceptance occurring on-site. The contractor must comply with the City’s Community Workforce Agreement, also known as a Project Labor Agreement, which mandates adherence to specific labor standards and ongoing reporting obligations. The project timeframe extends through October 31, 2026, with bid opening held on April 21, 2026, and City Council approval granted on June 4, 2026. Funding comes from the City’s Fiscal Year 2026 Capital Improvement Budget, sourced through the Water Enterprise Fund, though no specific accounting codes are identified. While no detailed line-item pricing, packaging requirements, or specific inspection standards (e.g., ASTM or AWWA) are stated, oversight is conducted by the Department of Capital Projects and Department of Public Utilities, with Justin Chan, Licensed Professional Engineer, serving as the primary point of contact. No option periods, extensions, or additional funding beyond the base award are included, and no formal contracting officer or COTR roles are officially designated in the documentation.
Water and Sewer Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 238910
SLED
NKRS Trucking Facility Project
Solicitation # P23-01154
The NKRS Trucking Facility Project, identified by Application No. P23-01154, involves the development of two parcels totaling approximately 4.76 acres located at 3293 West Nielsen Avenue in Fresno, California. Filed by Style-Line Construction, Inc. on behalf of NKRS Trucking, the project aims to establish a private trucking facility providing general automotive work, including minor repairs and major engine and transmission rebuilding. The development is planned in two phases, starting in late 2024, with the facility expected to be operational by Spring 2026. Phase 1 includes site preparation and the construction of a 3,000-square-foot dispatch office (Building 100) and a 9,000-square-foot metal repair shop (Building 200). Phase 2 involves the construction of an additional office space (Building 300). Site improvements include approximately 162,625 square feet of asphalt paving, a 5,000-square-foot water filtration retention basin, and parking for 56 trucks and 27 cars, including electric vehicle charging stations. Infrastructure upgrades involve undergrounding existing utility lines, installing a 14-inch water main, and improving West Nielsen Avenue with new paving, curbs, gutters, and a 12-foot-wide concrete sidewalk. Landscaping will include the planting of Chinese pistache and Natchez crape myrtle trees along with visual screening shrubs. The facility will operate from 8:00 a.m. to 5:00 p.m., Monday through Friday, with approximately six employees on-site. Security will be maintained via wrought-iron and chain-link fencing, shielded lighting, and surveillance cameras. The project is administered by the City of Fresno Planning and Development Department and complies with CEQA guidelines and safety standards established by USEPA, OSHA, and DTSC.
Site Preparation Contractors

POSTED

4 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS