Booster Pump Replacements at Pump Station 89A, 150, 176

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fresno awarded a firm fixed price construction contract valued at $2,538,800 to W. M. Lyles Co. for wellhead treatment improvements at Pump Stations 89A, 150, and 176, with the primary objectives of enhancing system performance, efficiency, and water quality. Scope of work includes replacing booster pumps at all three locations, installing new interconnecting piping, upgrading associated electrical and instrumentation systems, and constructing a new aeration tank exclusively at Pump Station 89A. A subsequent amendment also required replacement of a carbon dioxide removal tank at PS 89A. All work is confined to existing facility boundaries under a categorical exemption under CEQA Section 15301, Class 1, which precludes significant environmental impact or operational expansion. The project was procured via a competitive sealed bid process with award determined under the lowest price technically acceptable (LPTA) methodology, where responsiveness and responsibility were evaluated prior to price being the sole deciding factor. The contract does not include federal acquisition regulation clauses, instead relying on municipal standards and custom agreements. Performance is required at the three specified pump stations in Fresno, California, with acceptance occurring on-site. The contractor must comply with the City’s Community Workforce Agreement, also known as a Project Labor Agreement, which mandates adherence to specific labor standards and ongoing reporting obligations. The project timeframe extends through October 31, 2026, with bid opening held on April 21, 2026, and City Council approval granted on June 4, 2026. Funding comes from the City’s Fiscal Year 2026 Capital Improvement Budget, sourced through the Water Enterprise Fund, though no specific accounting codes are identified. While no detailed line-item pricing, packaging requirements, or specific inspection standards (e.g., ASTM or AWWA) are stated, oversight is conducted by the Department of Capital Projects and Department of Public Utilities, with Justin Chan, Licensed Professional Engineer, serving as the primary point of contact. No option periods, extensions, or additional funding beyond the base award are included, and no formal contracting officer or COTR roles are officially designated in the documentation.

General Info

Fresno upgrades three pump stations with fixed-price contract to W.M. Lyles Co. for $2.77M under CEQA Class 1 exemption.

Agency

California → City of Fresno

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Fresno, CA

Set-Aside

NONE

Documents

(4)

ID 26-702 Booster Pump Replacements Construction Contract Award

PDFaward

WC00018 BPS Environmental Assessment Categorical Exemption

PDFenvironmental-assessment

WC00018 CEQA Notice of Exemption for Booster Pump Replacements

PDFnotice-of-exemption

Boostar Pump Replacements CEQA Exemption Notice

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Fresno
Office AddressN/A
Contacts
Justin ChanLicensed Professional Engineer

Full Description

Show more
Wellhead treatment improvements at existing Pump Station 89A, 150, and 176 including construction of an aeration tank (P89A only), replacement of a booster pump, interconnecting piping, and associated electrical and instrumentation lines to improve the system's performance, efficiency, and water quality.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 14 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional technical requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The contractor is responsible for electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, as well as the excavation of cobbles and large boulders. This solicitation, managed by James W. Fowler Co., is open to small businesses, including certified service-disabled veteran-owned, minority-owned, and women-owned enterprises. Bids are due by September 29, 2026, and the project encourages the use of apprentices and provides support for M/W/DBE subcontractors regarding bonding, insurance, and materials.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 25 days
View Details