Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

NKRS Trucking Facility Project

Forecast
P23-01154State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The NKRS Trucking Facility Project, identified by Application No. P23-01154, involves the development of two parcels totaling approximately 4.76 acres located at 3293 West Nielsen Avenue in Fresno, California. Filed by Style-Line Construction, Inc. on behalf of NKRS Trucking, the project aims to establish a private trucking facility providing general automotive work, including minor repairs and major engine and transmission rebuilding. The development is planned in two phases, starting in late 2024, with the facility expected to be operational by Spring 2026. Phase 1 includes site preparation and the construction of a 3,000-square-foot dispatch office (Building 100) and a 9,000-square-foot metal repair shop (Building 200). Phase 2 involves the construction of an additional office space (Building 300). Site improvements include approximately 162,625 square feet of asphalt paving, a 5,000-square-foot water filtration retention basin, and parking for 56 trucks and 27 cars, including electric vehicle charging stations. Infrastructure upgrades involve undergrounding existing utility lines, installing a 14-inch water main, and improving West Nielsen Avenue with new paving, curbs, gutters, and a 12-foot-wide concrete sidewalk. Landscaping will include the planting of Chinese pistache and Natchez crape myrtle trees along with visual screening shrubs. The facility will operate from 8:00 a.m. to 5:00 p.m., Monday through Friday, with approximately six employees on-site. Security will be maintained via wrought-iron and chain-link fencing, shielded lighting, and surveillance cameras. The project is administered by the City of Fresno Planning and Development Department and complies with CEQA guidelines and safety standards established by USEPA, OSHA, and DTSC.

General Info

NKRS Trucking facility development on 4.76 acres in Fresno, operational by Spring 2026.

Place of Performance

Located between West Marks Avenue and North Valentine Avenue, Fresno, CA, 93706

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Fresno
Office AddressN/A
Contacts

Interested Companies (1)

SWCA Environmental ConsultantsBroomfield, Colorado

Full Description

Show more
Development Permit and Environmental Assessment No. P23-01154, the NKRS Trucking Facility Project (project) was filed by the applicant, Brandon Rodriguez, Style-Line Construction, Inc., on behalf of Amolak Singh, NKRS Trucking. The applicant proposes to develop two parcels (APNs 326 160 19 and 326-160-20) that are each 2.38 acres, totaling approximately 4.76 acres at the south side of West Nielsen Avenue between West Marks Avenue and North Valentine Avenue (Figure 1). The proposed project includes the development of a trucking facility that would provide general automotive work, including minor repairs and major engine and transmission rebuilding or replacement. The 4.76-acre project site (5.08 acres including improved right-of-way) is flat, vacant, and undeveloped, except for hurricane fencing with barbed wire and a gate. The project site is not currently served by utilities; however, there are existing overhead power lines on the south side of West Nielsen Avenue. An unpaved access road exists on the eastern parcel of the project site, and primary and secondary access to the project site would be provided by West Nielsen Avenue (a two-lane paved road with no sidewalks), which is defined by the California Department of Transportation (Caltrans) as a Major Collector. California State Route (SR) 180, which runs east–west and provides regional access, is located approximately 900 feet south of the project site and is separated from the project site by two parcels (APNs 326-16-007 and 326-15-030). Surrounding land uses include autobody facilities, trucking facilities, construction equipment facilities, and storage facilities and vacant land. Construction of the project would take place in two phases. Phase 1 would consist of site preparation and construction of Buildings #100 and #200 and is expected to take approximately 10 to 12 months, beginning in late 2024. Building #300 would be constructed as part of Phase 2 construction, which is anticipated to occur within 2 to 3 years of the completion of Phase 1 and is anticipated to last for 6 to 9 months. The facility is expected to be operational in the Spring of 2026. A maximum of 12 construction workers would be required during peak construction. The proposed site improvements include the following: • Site preparation, including clearing and grubbing. • Grading and undergrounding of utilities. Approximately 162,625 square feet would be paved with asphalt per Fresno County Department of Public Works Standards P-21, P-22, and P-23. • Construction of Buildings #100 and #200 and the retention basin. • Paving and architectural coating. • Paving of West Nielsen Avenue. • Construction of Building # 300 (Phase 2). As part of project development, three buildings are proposed on-site (Figure 2): • Building #100 is a proposed 3,000-square-foot dispatch office building with an office area and restrooms and is part of Phase 1 of the project. The office building would be constructed in the northeastern corner of the project site along the West Nielsen Avenue frontage. The proposed office building would be approximately 15 feet 8 inches in height. • Building #200 is a proposed 9,000-square-foot metal building that would serve as the truck repair/maintenance shop and is also part of Phase 1 of the project. The shop building would include two enclosed drive-through truck service bays and one truck parking bay used for truck inspections and pre-service staging. Once constructed, all repairs would be performed inside the proposed shop building to limit noise generated from truck repairs to the interior and enclosed spaces within the building. Noise generated from the operation of the shop would primarily come from a proposed five-horsepower compressor located inside the building. The shop would include an area for the storage of parts, offices, restrooms, a lunchroom, and a tool room. The shop building would be located on the eastern frontage of the project site approximately 158 feet south of the proposed office building (Building #100). The shop building would be approximately 19 feet 3 inches high and would contain a fire sprinkler system. • Building #300 would be constructed as part of Phase 2 of the project and would serve as office space. This building would be located in the northwestern corner of the project site. Building #300 would be approximately 16 feet in height. • An approximately 5,000-square-foot retention basin would be installed along the West Nielsen Avenue frontage between Buildings #100 and #300 (Figure 2). This retention basin would provide on-site water filtration. The project includes the construction of a truck parking lot area that would include approximately 56 truck parking stalls, as well as 27 car and van parking stalls, including two accessible parking stalls, one accessible van parking stall, and two Electric Vehicle (EV) charging stations with six EV-capable parking stalls. All trucks and cars would be parked within the paved area of the project site. The proposed vehicular access to the project site includes a one-way truck entry on the eastern parcel and a one-way truck exit on the western parcel. Vehicle ingress and egress would be allowed on the eastern parcel. All vehicle traffic would enter and exit the facility via West Nielsen Avenue and the project would not permanently alter pedestrian or vehicle access to the project site. Proposed off-site improvements along West Nielsen Avenue include 51-foot-wide permanent paving along approximately 328 linear feet of project site frontage for improved access, a 12-foot-wide concrete sidewalk, and 6-inch curb and gutters along the south side of West Nielsen Avenue. The existing overhead utility lines would be undergrounded per City of Fresno Municipal Code Section 15-2017 (Underground Utilities) prior to the proposed street paving. The proposed water utilities improvements include the construction of approximately 840 linear feet of a 14-inch water main (including City fire hydrants) from the existing 14-inch water main located on West Nielsen Avenue, west across the project frontage. Landscaping activities include the removal of two eucalyptus (Eucalyptus sp.) trees and the planting of approximately nine Chinese pistache (Pistacia chinensis) and seven Natchez crape myrtle (Lagerstroemia indica x fauriei 'Natchez') trees (Figure 3). Approximately 124 shrubs would be planted to provide visual screening and shading along the northwestern property boundary. An approximate 278.6-linear-foot irrigation lateral would be installed, in addition to an approximate 176.6-linear-foot irrigation mainline throughout the site for landscaping irrigation. The hours of operation would be from 8:00 a.m. to 5:00 p.m. Monday through Friday. The facility would be private and not open to the public. Approximately six employees would be on-site during operation. Per the Institute of Transportation Engineers (ITE) rates for General Light Industrial (Land Use 110), the proposed project is estimated to generate approximately 123 daily driveway trips, 18 AM peak hour driveway trips, and 17 PM peak hour driveway trips. Security measures include the addition of 6-foot-tall wrought-iron fencing and gates along the West Nielsen Avenue frontage and 6-foot-high chain-link fencing along the remaining property perimeter. Site lighting would be provided by two 34-foot-tall light posts, and security cameras would be installed. Two streetlights would also be installed on the south side of West Nielsen Avenue, and all lighting would be shielded and directed downward to limit off-site light spillover to highway traffic and the environment. The project will also require dedications, vacations, and/or acquisitions for public street rights-of-way and utility easements as well as the construction of public facilities and infrastructure in accordance with the standards, specifications and policies of the City of Fresno in order to facilitate the future proposed development of the subject property.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
International
Edgewater Post Office and Credit Union Building Demolition Services
Solicitation # 235628
The Regional District of East Kootenay is soliciting proposals for demolition services for the Edgewater Post Office and Credit Union Building located at 5759 Sinclair Street, Edgewater, British Columbia. The scope of work involves structural demolition and the management of hazardous materials, guided by the Keefer Hazmat Services Ltd report. Key deliverables include a site-specific work plan addressing demolition sequencing, safety, and waste handling, as well as the restoration of the properties to specifications defined in the contract. Final acceptance is contingent upon an inspection by the Regional District of East Kootenay to ensure restoration requirements are met and that no damage was caused to adjacent utilities or landscaped areas. To be eligible, proponents must hold a valid WorkSafe BC Asbestos Abatement License (AAL) and be in good standing with WorkSafeBC. The contract will be awarded to the proponent who meets all mandatory criteria and achieves the highest overall ranking based on weighted criteria and price. The project requires a Site Supervisor with at least five years of field experience in demolition or environmental remediation within the last seven years. The agreement will be based on a modified CCDC 2 – 2020 Stipulated Price Contract, requiring $5,000,000 in both general and automobile liability insurance. Proponents must submit a total lump-sum price inclusive of all tipping fees and delivery charges.
Regional District of East Kootenay

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238910
New
SLED
2026-41 Demolition of Condemned Church Building
Solicitation # 2026-41
The City of Charleston, WV, is soliciting bids for solicitation number 2026-41 to perform the demolition of a condemned church building located at 915 Main St, Charleston, WV 25302. The comprehensive scope of work includes asbestos abatement for the rooftop and flooded basement areas, complete structural demolition, and site restoration consisting of leveling, compaction, and seeding. The contract will be awarded to the lowest responsible bidder based on a lump sum base bid. Performance must commence within ten calendar days of the notice to proceed and must be completed within forty-five calendar days. This project is funded in whole or in part by a HUD Community Development Block Grant (CDBG) and is subject to strict federal requirements, including the Davis-Bacon and Related Acts prevailing wage requirements, the Copeland Anti-Kickback Act, and Section 3 Equal Employment Opportunity standards. Contractors are required to submit weekly certified payroll reports and must comply with EPA NESHAP and OSHA standards for asbestos and lead-based paint handling. Required bid submissions include a Drug Free Affidavit, Federal Funds Addendum, and various performance, payment, and bid bonds. Final acceptance of the work is contingent upon an inspection by the City and the Charleston Sanitary Board, resulting in a Certificate of Acceptance.
City of Charleston, WV

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details
NAICS: 238910
New
SLED
PUBLIC SAFETY BUILDING - SITE DEMO PACKAGE, PROJECT 20-49
Solicitation # 20261104036
The City of Mountain View is soliciting bids for the Public Safety Building Site Demo Package, Project 20-49, located in Mountain View, California. The scope of work involves comprehensive site demolition and preparation, including the lime treatment of the building pad for temporary stabilization to a minimum 95% maximum dry density per ASTM C977. The project includes specific allowances for unforeseen hazardous materials testing and remediation ($32,000), biologist surveys ($15,000), and a general construction contingency of $320,000. All work must be completed to the satisfaction of the City Engineer and comply with ANSI safety standards for demolition and ADA accessibility requirements under the California Code of Regulations. Bidders must meet strict safety qualifications, requiring an arithmetic average Experience Modification Rate (EMR) of 1.00 or less over the last three years, or provide OSHA Form 300A summaries and industry benchmark comparisons if a full history is unavailable. Proposals must be submitted as sealed bids by December 10, 2026, including a bid deposit of at least 10% of the bid amount. Awarded contractors must provide faithful performance and payment bonds from a Treasury Circular 570 approved surety, adhere to prevailing wage requirements, and maintain an active Injury and Illness Prevention Program. Post-award requirements include the submission of an initial schedule within 14 days of the Notice to Proceed and monthly payment applications supported by mechanic's lien waivers.
Mountain View City

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → City of Fresno

Same awarding agency

NAICS: 541620
SLED
Environmental Assessment No. P23-00446/P23-00449/P23-00702
Solicitation # P23-00446/P23-00449/P23-00702
The City of Fresno is the lead agency for a reorganization project involving the annexation of approximately 10.55 acres at the southwest corner of East Nees Avenue and North Willow Avenue. This action includes detaching the land from the Fresno County Fire Protection District and the Kings River Conservation District. The project consists of three primary components: the annexation of the land, the pre-zoning of approximately 8.6 acres from agricultural to community commercial and annexed rural residential transitional zones, and a development permit for the construction of medical, dental, and professional office buildings on 3.3 acres. The project is identified under Environmental Assessment numbers P23-00446, P23-00449, and P23-00702. Under the California Environmental Quality Act (CEQA), the City of Fresno adopted a Mitigated Negative Declaration, concluding that the project would not have significant adverse environmental effects provided specific mitigation measures are implemented. The Department of Toxic Substances Control provided recommendations regarding soil testing and the management of contaminants such as pesticide residues, lead-based paint, and asbestos. Construction is slated to begin on June 2, 2025, with an operational year of 2026. All infrastructure must meet City of Fresno standards and exceed 2019 Title 24 Building Envelope Energy Efficiency Standards. Compliance with OSHA, US DOT, and EPA regulations for hazardous materials and site safety is required, with the City of Fresno Department of Public Works overseeing infrastructure inspections.
Environmental Consulting Services

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 237110
SLED
IIGC Downtown Water and Sewer Improvements
Solicitation # 2025100590
The City of Fresno is implementing the IIGC Downtown Water and Sewer Improvements project, funded by the California Housing and Community Development Infill Infrastructure Grant. The project aims to support the development of affordable and mixed-income housing within the Downtown Fresno triangle, specifically the area bounded by Calaveras Street, Van Ness Avenue, Grove Street, and SR-99. The scope of work includes the installation and rehabilitation of approximately 15,900 linear feet of waterline and 13,400 linear feet of sewer pipeline, along with the installation of manholes and junction structures. Construction activities involve the demolition of asphalt and one sanitary sewer manhole, the excavation of 26,700 cubic yards of soil, and the use of 10 to 20 on-site workers. Construction is scheduled to take place between January 2026 and June 2027, with work occurring Monday through Friday from 7:00 A.M. to 5:00 P.M. The project has undergone environmental review under CEQA, resulting in a Mitigated Negative Declaration. Key compliance requirements include strict archaeological monitoring during all ground-disturbing activities by qualified personnel and adherence to state laws regarding the discovery of human remains. Project management is led by Robert Diaz of the City of Fresno Capital Projects Department.
Water and Sewer Line and Related Structures Construction

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Fresno Central Southeast Area Specific Plan
Solicitation # P23-02413
The Fresno Central Southeast Area Specific Plan is a long-range planning initiative led by the City of Fresno to guide growth and development over the next 20 to 30 years. Spanning approximately 2,200 acres east and southeast of Downtown Fresno, the plan aims to create a more vibrant, equitable, and healthy community by addressing housing, economic development, transportation, parks, and environmental quality. Key objectives include revitalizing commercial corridors, creating higher-intensity mixed-use infill opportunities, and diversifying employment through office, clean tech, and other non-nuisance uses. The plan also seeks to improve infrastructure, including roads, sidewalks, bicycle facilities, transit access, and stormwater management, while reducing oversized parking lots and developing underutilized land. The project involves a General Plan amendment and rezone application to align land use designations with current ground uses and to facilitate strategic development. Extensive environmental assessments have been conducted to evaluate impacts on air quality, biological and cultural resources, agriculture, and transportation. A Mitigated Negative Declaration indicates that with applied mitigation measures, no significant adverse environmental effects are expected. Supporting documentation includes detailed studies on traffic levels, agricultural land evaluation, and cultural resource protections. Future development within the area will require compliance with the California Energy Code and the preparation of construction management plans to ensure adequate circulation and access.
Environmental Consulting Services

POSTED

11 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS