IIGC Downtown Water and Sewer Improvements

Forecast
2025100590State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fresno is implementing the IIGC Downtown Water and Sewer Improvements project, funded by the California Housing and Community Development Infill Infrastructure Grant. The project aims to support the development of affordable and mixed-income housing within the Downtown Fresno triangle, specifically the area bounded by Calaveras Street, Van Ness Avenue, Grove Street, and SR-99. The scope of work includes the installation and rehabilitation of approximately 15,900 linear feet of waterline and 13,400 linear feet of sewer pipeline, along with the installation of manholes and junction structures. Construction activities involve the demolition of asphalt and one sanitary sewer manhole, the excavation of 26,700 cubic yards of soil, and the use of 10 to 20 on-site workers. Construction is scheduled to take place between January 2026 and June 2027, with work occurring Monday through Friday from 7:00 A.M. to 5:00 P.M. The project has undergone environmental review under CEQA, resulting in a Mitigated Negative Declaration. Key compliance requirements include strict archaeological monitoring during all ground-disturbing activities by qualified personnel and adherence to state laws regarding the discovery of human remains. Project management is led by Robert Diaz of the City of Fresno Capital Projects Department.

General Info

City of Fresno water and sewer improvements for downtown housing, January 2026-June 2027.

Place of Performance

Calaveras Street, Van Ness Avenue, Grove Street, SR-99, Fresno, CA, See below.

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Fresno
Office AddressN/A
Contacts
Robert DiazProject Manager

Interested Companies (1)

Rincon ConsultantsVentura, California

Full Description

Show more
The City of Fresno has secured funding through the California Housing and Community Development Infill Infrastructure Grant Catalytic Qualifying Infill Area Program (IIGC Grant). The primary use of the IIGC Grant funds are intended to fund at least seven projects related to upgrading water and sewer infrastructure within the Downtown Fresno triangle. The objective of the IIGC grant funding is to support infill development by providing financial assistance for capital improvement projects that are essential to, or directly support, the development of affordable and mixed-income housing. The proposed project includes approximately 15,900 linear feet of waterline improvements and/or 13,400 linear feet of sewer pipeline installation and rehabilitation. Project activities would include the installation and rehabilitation of water and sewer pipelines, manholes, and junction structures to support future development in Downtown Fresno. Where applicable, asphalt would be demolished to allow for installation of new pipeline improvements. The proposed project would not involve structure demolition. The proposed demolition would consist of an existing sanitary sewer manhole, typically 48 to 60 inches in diameter and 10 to 14 feet deep and removing pavement or asphalt. No pile driving, blasting, rock breaking and processing, or groundwater dewatering would be required for construction of the project components. Approximately 26,700 cubic yards (cy) of soil would be excavated from the site, with approximately 5,032 cy exported via haul trucks and the remainder used as fill materials. Construction of the proposed project would occur between January 2026 and June 2027. Construction activities would typically occur between 7:00 A.M. and 5:00 PM Monday through Friday. No nighttime construction is proposed. Construction of the proposed project would entail 10-20 construction workers on site, on any given day. The project would not involve any new operation and maintenance activities. No new operational employees would be required.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project, solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified small businesses. Interested firms must submit their responses by December 4, 2026. The project is located in Virginia and is managed by primary point of contact John Connelly. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of 24-inch diameter trenchless crossings with associated launch and receiving shafts, the construction of standard and doghouse manholes, and a CSO regulator fit out. Additional site work consists of clearing and grubbing over 5,100 square yards of wooded areas, seeding, fine grading, and select tree removal. Critical operational and compliance deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the maintenance of flows and bypass during construction. Contractors are specifically required to obtain railroad insurance. The project also involves the abandonment of existing pipes and manholes and the construction of an outfall, with all work adhering to specified technical drawings.
Cleary Construction, Inc.

POSTED

23 minutes ago

DEADLINE

in 27 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as Project No. SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and utilizes EJCDC standard forms for its contracting requirements. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and compliance with MWBE guidelines. Bidders must provide a Good Faith Efforts Form and Table A to be considered responsive. Technical requirements specify the use of Class 250 ductile iron pipe with Protecto 401 lining and adherence to North Carolina Administrative Code for sanitary sewer clearances. Contract administration is managed by the City of Belmont, with Willis Engineers serving as the project engineer. Performance and payment bonds, as well as proof of insurance, are mandatory requirements for the selected contractor.
Don Moorhead Construction, Inc.

POSTED

23 minutes ago

DEADLINE

in 3 days
View Details

More opportunities from California → City of Fresno

Same awarding agency

NAICS: 238910
SLED
NKRS Trucking Facility Project
Solicitation # P23-01154
The NKRS Trucking Facility Project, identified by Application No. P23-01154, involves the development of two parcels totaling approximately 4.76 acres located at 3293 West Nielsen Avenue in Fresno, California. Filed by Style-Line Construction, Inc. on behalf of NKRS Trucking, the project aims to establish a private trucking facility providing general automotive work, including minor repairs and major engine and transmission rebuilding. The development is planned in two phases, starting in late 2024, with the facility expected to be operational by Spring 2026. Phase 1 includes site preparation and the construction of a 3,000-square-foot dispatch office (Building 100) and a 9,000-square-foot metal repair shop (Building 200). Phase 2 involves the construction of an additional office space (Building 300). Site improvements include approximately 162,625 square feet of asphalt paving, a 5,000-square-foot water filtration retention basin, and parking for 56 trucks and 27 cars, including electric vehicle charging stations. Infrastructure upgrades involve undergrounding existing utility lines, installing a 14-inch water main, and improving West Nielsen Avenue with new paving, curbs, gutters, and a 12-foot-wide concrete sidewalk. Landscaping will include the planting of Chinese pistache and Natchez crape myrtle trees along with visual screening shrubs. The facility will operate from 8:00 a.m. to 5:00 p.m., Monday through Friday, with approximately six employees on-site. Security will be maintained via wrought-iron and chain-link fencing, shielded lighting, and surveillance cameras. The project is administered by the City of Fresno Planning and Development Department and complies with CEQA guidelines and safety standards established by USEPA, OSHA, and DTSC.
Site Preparation Contractors

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Environmental Assessment No. P23-00446/P23-00449/P23-00702
Solicitation # P23-00446/P23-00449/P23-00702
The City of Fresno is the lead agency for a reorganization project involving the annexation of approximately 10.55 acres at the southwest corner of East Nees Avenue and North Willow Avenue. This action includes detaching the land from the Fresno County Fire Protection District and the Kings River Conservation District. The project consists of three primary components: the annexation of the land, the pre-zoning of approximately 8.6 acres from agricultural to community commercial and annexed rural residential transitional zones, and a development permit for the construction of medical, dental, and professional office buildings on 3.3 acres. The project is identified under Environmental Assessment numbers P23-00446, P23-00449, and P23-00702. Under the California Environmental Quality Act (CEQA), the City of Fresno adopted a Mitigated Negative Declaration, concluding that the project would not have significant adverse environmental effects provided specific mitigation measures are implemented. The Department of Toxic Substances Control provided recommendations regarding soil testing and the management of contaminants such as pesticide residues, lead-based paint, and asbestos. Construction is slated to begin on June 2, 2025, with an operational year of 2026. All infrastructure must meet City of Fresno standards and exceed 2019 Title 24 Building Envelope Energy Efficiency Standards. Compliance with OSHA, US DOT, and EPA regulations for hazardous materials and site safety is required, with the City of Fresno Department of Public Works overseeing infrastructure inspections.
Environmental Consulting Services

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Fresno Central Southeast Area Specific Plan
Solicitation # P23-02413
The Fresno Central Southeast Area Specific Plan is a long-range planning initiative led by the City of Fresno to guide growth and development over the next 20 to 30 years. Spanning approximately 2,200 acres east and southeast of Downtown Fresno, the plan aims to create a more vibrant, equitable, and healthy community by addressing housing, economic development, transportation, parks, and environmental quality. Key objectives include revitalizing commercial corridors, creating higher-intensity mixed-use infill opportunities, and diversifying employment through office, clean tech, and other non-nuisance uses. The plan also seeks to improve infrastructure, including roads, sidewalks, bicycle facilities, transit access, and stormwater management, while reducing oversized parking lots and developing underutilized land. The project involves a General Plan amendment and rezone application to align land use designations with current ground uses and to facilitate strategic development. Extensive environmental assessments have been conducted to evaluate impacts on air quality, biological and cultural resources, agriculture, and transportation. A Mitigated Negative Declaration indicates that with applied mitigation measures, no significant adverse environmental effects are expected. Supporting documentation includes detailed studies on traffic levels, agricultural land evaluation, and cultural resource protections. Future development within the area will require compliance with the California Energy Code and the preparation of construction management plans to ensure adequate circulation and access.
Environmental Consulting Services

POSTED

11 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS