Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Development Permit Application No. P22-01141 and Planned Development Permit No. P23-01229

Forecast
P22-01141 / P23-01229State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Development Permit Application No. P22-01141 and Planned Development Permit No. P23-01229 authorize the construction of a Residence Inn by Marriott hotel at 5070 North First Avenue in Fresno, California. The project consists of a four-story, 90,121 square-foot building featuring 124 guest rooms and 105 parking stalls. Located in a Center Mixed Use zone, the project includes modifications to development standards regarding residential density, ground floor hotel use, and minimum frontage. The development is classified as in-fill and has been granted a Categorical Exemption under CEQA Guidelines 15332/Class 32, confirming no significant environmental impacts. The project is subject to strict technical specifications, including a minimum finish floor elevation of 327.38 U.S.G.S. Datum and comprehensive drainage requirements. The developer must execute a Development Agreement with the Fresno Metropolitan Flood Control District, provide a drainage covenant to APN 418-091-21, and ensure no surface runoff is directed toward the District basin. Additionally, the project must comply with Fresno Municipal Code sections 15-1103, 15-1104, and 15-1105, and may require the acquisition or dedication of public street rights-of-way and utility easements. Administrative processing included a 50.00 USD county documentary handling fee paid via credit.

General Info

Authorization for a 124-room Residence Inn hotel construction at 5070 North First Avenue.

Agency

California → City of Fresno

Place of Performance

Fresno, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
Development Permit Application No. P22-01141 proposes the construction of a ± 90,121 square-foot four-story hotel (Residence Inn by Marriott), which includes 124 guest rooms and 105 onsite parking stalls. Related Planned Development Permit Application No P23-01229 requests to modify the required development standards for minimum residential density, allowing hotel use on ground floor, and to reduce minimum frontage standards. The project may also require dedications, vacations, and/or acquisitions for public street rights-of-way and utility easements as well as the construction of public facilities and infrastructure in accordance with the standards, specifications and policies of the City of Fresno in order to facilitate the future proposed development of the subject property. The property is zoned CMX (Corridor – Center Mixed Use).

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
International
Audley Pump Station Upgrade
Solicitation # 26-227
The City of Delta is seeking an engineering consulting firm to design a retrofit for the Audley Sanitary Pump Station (A-151) located at 410 Audley Blvd, Delta, BC. The project aims to improve operational reliability, capacity, and safety as the station reaches the end of its design service life. The scope of work includes site investigations, geotechnical investigations, environmental impact determinations, and topographic surveys. The selected consultant will also be responsible for construction services, including contract administration, the development of measurable performance acceptance criteria, and the identification of commissioning and testing procedures. The contract is expected to begin in January 2027, with preliminary design due by June 2027, detailed design by October 2027, and tender-ready drawings and specifications by January 2028. Construction is slated for Spring 2028, with final completion anticipated by December 2029. Proposals must be submitted as a single PDF file to [email hidden] by December 8, 2026, at 2:00 PM Pacific time. The City will award the contract based on the highest overall ranking to ensure the best value, rather than simply the lowest price. Pricing must be quoted as a firm, all-inclusive lump sum in Canadian dollars, exclusive of GST. There is no specified set-aside status for this solicitation.
City of Delta

POSTED

about 7 hours ago

DEADLINE

in 19 days
View Details
NAICS: 541330
New
International
Dam Safety Review for Okanagan Lake Dam
Solicitation # EN27WMB0008
The Ministry of Water, Land and Resource Stewardship is soliciting a targeted Dam Safety Review (DSR) for the Okanagan Lake Dam located in Penticton, British Columbia. The objective of this engagement is to assess the dam's safety, condition, performance, and reliability, specifically evaluating its ability to withstand current and future loading conditions. The scope of work is divided into two primary phases: Phase A, which includes a background review, site visit, and Probable Maximum Flood assessment; and Phase B, which involves concrete coring, underwater video inspection, and a comprehensive safety assessment and audit. All work must be performed in accordance with the BC Dam Safety Program, Engineers and Geoscientists BC (EGBC), and Canadian Dam Association (CDA) guidance. The contract is governed by a General Service Agreement and is scheduled to run from December 2026 through March 19, 2027, with a potential extension to March 31, 2028. Proposals are evaluated using a weighted scoring system focusing on approach, experience, capabilities, and price, with specific minimum scores required for the approach, experience, and capabilities categories. The selected contractor must adhere to strict security requirements, including criminal record checks for personnel and the encryption of province information. Payment terms are set at 30 days from the receipt of a written statement of account, with all financial obligations subject to the Financial Administration Act. There is no set-aside status for this solicitation.
Ministry of Water, Land and Resource Stewardship

POSTED

about 8 hours ago

DEADLINE

in 27 days
View Details
NAICS: 541330
New
SLED
Professional Services for Land Disturbance Permit Plan Review, Inspection & Arborist Services
Solicitation # 26-07
Rockdale County Board of Commissioners is seeking on-call professional services for Land Disturbance Permit (LDP) plan review, inspection, and arborist services under solicitation RFQ No. 26-07. The scope of work includes reviewing grading, drainage, and stormwater management designs for compliance with County ordinances and state regulations, providing technical reviews for the Georgia Erosion and Sedimentation Act, and performing arborist services such as tree inventory and health assessments. Additionally, the selected firm may provide staff augmentation to support the Stormwater Department. All arborist services must be performed by an ISA Certified Arborist. The contract term is for one year, with the option for two one-year renewals, and all materials are designated as F.O.B. Destination Conyers, Georgia. The selection process is based on a past performance, quality, and price trade-off, with evaluation criteria weighted across staffing and availability (35%), experience and performance (35%), and organization and staffing (30%). Local vendors are eligible for an additional 5 points in scoring. Applicants must provide a current business license, at least three professional references, and evidence of financial stability. Insurance requirements include a minimum A.M. Best rating of A, with specific limits for workers' compensation, general liability, and professional liability. Proposals must be submitted via USB flash drive by the December 17, 2026, deadline. There is no specified set-aside status for this solicitation.
Rockdale County Board of Commissioners

POSTED

about 9 hours ago

DEADLINE

in 28 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS