Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Spending Authorization - Pier F Waterfront Seismic Improvements

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Port of Long Beach has authorized spending in the amount of 2.23 million dollars for the Pier F Waterfront Seismic Improvement Project located at Pier F, Berth F202 in Long Beach, California. This funding is designated for in-house staff and professional consultants to complete the preliminary design phase, which includes the execution of necessary studies and a geotechnical field investigation. A Harbor Development Permit for the geotechnical work was issued on October 28, 2025, and the project is classified under NAICS code 541330. The project is managed by the City of Long Beach Harbor Department Environmental Planning Division, with Monique Lebrun serving as the Director of Program Management and Jennifer Blanchard as the Environmental Specialist. This initiative is exempt under several California Environmental Quality Act categories, including Ministerial, Common Sense, Emergency Project, and specific Categorical and Statutory exemptions. The authorization was formally signed on December 10, 2025, and was posted as a forecast on January 21, 2026.

General Info

Port of Long Beach authorized 2.23 million for Pier F seismic design improvements.

Place of Performance

Long Beach, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Monique Lebrun P.E. D.PEDirector of Program Management
Jennifer BlanchardEnvironmental Specialist

Full Description

Show more
Authorize spending in the amount of $2.23 million for in-house staff and professional consultants to complete the preliminary design of the Pier F Waterfront Seismic Improvement Project, including completion of a geotechnical field investigation. A Harbor Development Permit was issued for the geotechnical field investigation (25-058) on October 28, 2025.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
2027-2030 On-Call Engineering and Professional Services
Solicitation # 49733
The City of San Rafael is soliciting Statements of Qualifications from consultants and contractors to establish a pool of qualified firms for on-call engineering and professional services. The scope covers a wide array of disciplines, including civil, structural, electrical, environmental, architectural, and transportation services, among others. The city intends to select up to five firms per discipline for a three-year contract term beginning July 1, 2027, and ending June 30, 2030, with an option for a one-year extension. Eligible firms must maintain a principal office in the San Francisco Bay Area. Work will be assigned through individual Task Orders, with compensation based on either fixed fees or hourly rates. The selection process utilizes a 100-point ranking system to shortlist firms for interviews. Applicants must submit their qualifications via Bid Express by December 8, 2026, at 2:00 PM. Submissions must include a cover letter explicitly accepting the City's Service Level Agreement as-is, professional resumes, work references, and a history of litigation or contract terminations from the last five years. Contractors are required to maintain comprehensive insurance, including commercial general liability of at least one million dollars per occurrence and workers compensation as required by California law. Payments are processed monthly within 30 days of receipt, though all authorized work is contingent upon appropriated funding. Additionally, contractors must adhere to state prevailing wage laws for any contract exceeding one thousand dollars.
City of San Rafael

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Setback Levee Projects - Architecture and Engineering Services
Solicitation # 2026-RFQ-260
Pierce County Planning and Public Works is soliciting qualifications for architecture and engineering services under RFQ 2026-RFQ-260 to design setback levee and revetment projects along the Puyallup River. The primary objectives are to reduce flood risk and improve aquatic habitats across four project areas: the Northeast, Northwest, Southwest, and Southeast quadrants. The scope of work includes developing a comprehensive delivery strategy and producing Plans, Specifications, and Estimates (PS&E). Specifically, the consultant will provide designs up to 100 percent for the NE, NW, and SW quadrants, while the SE quadrant requires 30 percent design for three setback alternatives and a no-change alternative. Key technical deliverables include hydrologic and hydraulic modeling, geotechnical evaluations, property acquisition plans, and support for FEMA Conditional Letter of Map Condition (CLOMR) applications. The resulting Professional Services Agreement is anticipated to have an initial term of 12 months, with an option for the County to renew for an additional three years. Performance will follow a structured Stage Gate Delivery Process to ensure consistency from inception through closeout. Proposals are due by November 25, 2026, via the County's eProcurement Portal and will be evaluated on a points-based system to select the most qualified team. The selected contractor must comply with RCW 39.12 prevailing wage requirements and various federal non-discrimination laws. Payments will be processed monthly through the County voucher system based on documented units of work performed.
Planning and Public Works

POSTED

about 7 hours ago

DEADLINE

in 19 days
View Details
NAICS: 541330
New
SLED
On-Call Professional Engineering Services for Wastewater Collection System Impr
Solicitation # 27-42
Norwich Public Utilities is seeking experienced, multi-disciplinary engineering consulting firms to provide on-call professional engineering, construction management, and construction inspection services for wastewater collection system improvements in Connecticut. The scope of work involves moving projects from concept to construction, including the delivery of conceptual engineering reports, feasibility studies, final design documents for bidding, and construction cost estimating and administration. A critical technical requirement is that any review of closed-circuit television inspection videos must be performed by an engineer holding a valid Pipeline Assessment Certification Program certification from the National Association of Sewer Service Companies. The selection process is based on a weighted scoring system evaluated by a committee, with 50 percent of the score derived from relevant experience and references, 40 percent from staff qualifications and a detailed staffing plan, and 10 percent from corporate organization, including professional licenses and insurance. Proposers must submit a Statement of Qualifications via the City of Norwich Procurement Portal by December 15, 2026. The submission must include a cover letter, a list of at least three project references per category of work, a completed categories of work designation, and a non-collusion affidavit. Selected firms will enter into on-call agreements for a base period of three years, with specific task orders managed through detailed project schedules.
DAS Procurement

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Long Beach, Port of

Same awarding agency

NAICS: 541620
SLED
Cooperative Agreement Between the Ports of Long Beach and Los Angeles and the South Coast Air Quality Management District
Solicitation # 2025110385
The Cooperative Agreement between the South Coast Air Quality Management District (AQMD), the Port of Los Angeles, and the Port of Long Beach, executed in December 2025 and effective through December 31, 2030, establishes a framework for implementing Clean Air Action Plan (CAAP) Plus measures. The agreement mandates a three-phase process to develop and adopt zero-emission infrastructure plans for cargo-handling equipment, switcher locomotives, drayage trucks, and ocean-going vessels. Key milestones include a series of draft and final plan adoptions by the Board of Harbor Commissioners spanning from May 2027 through December 2029. To ensure accountability, the agreement includes strict public process requirements, including a 45-day review period for draft materials and annual progress reporting to the AQMD. A subsequent addendum expands the scope to include the Enhanced Clean Ship Incentive Program and the Zero-Emission Truck Utilization Incentive Program, the latter of which must be approved by February 28, 2027. Additionally, the agreement allocates 20 million dollars to the South Coast AQMD to fund regional off-port truck charging and fueling infrastructure, with a memorandum of understanding for these funds due by February 28, 2027. The agreement incorporates enforcement mechanisms where ports failing to meet deadlines or public process requirements are subject to penalties ranging from 50,000 to 100,000 dollars, payable into a Clean Air Mitigation Fund for projects within the Tidelands Trust area. Concurrent activities also include clean marine fuel assessments, pilot projects, and technical studies on vessel emissions.
Environmental Consulting Services

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 541380
SLED
Geotechnical Field Investigation – Harbor Development Permit No. 25-058
Solicitation # HDP 25-058
The Port of Long Beach is executing the Waterfront Seismic Improvement Project at Pier F, Berth F202, within the Southeast Harbor Planning District. Under Harbor Development Permit No. 25-058 and its second amendment, the project focuses on reducing seismic risks and enhancing site stability through targeted geotechnical upgrades. The scope of work includes performing geotechnical borings, probes, and potholing to collect data and locate underground utilities. These efforts support the implementation of compaction and jet grouting in areas susceptible to liquefaction and settlement, specifically along the rock dike at the Middle Harbor entrance adjacent to the Joint Command Control Center, the Jacobsen Pilot Service building, and the associated parking area. The project involves the demolition of existing pavement and temporary structures, the relocation and adjustment of affected underground utilities from the JCCC parking lot to the Long Beach Fire Station 15 lot, and the in-kind replacement of pavement. All activities are conducted under California Environmental Quality Act categorical exemptions, as the work consists of minor alterations and basic information collection with no significant environmental impact. Project administration is managed by the Port of Long Beach, with key personnel including Camille Hodge as Project Manager and Allyson Teramoto as Director of Environmental Planning. All removed materials must be disposed of in accordance with federal, state, and local environmental regulations.
Testing Laboratories and Services

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 561730
SLED
Contracts Between the Port of Long Beach and Community Grants Program Awardees for Facility Improvements ProjectsThe Port of Long Beach has established contracts with twelve community-based organizations to fund facility improvement projects totaling up to $2,612,012 under its Community Grants Program, with the primary objective of reducing port-related environmental impacts in Long Beach, California. The funded initiatives are categorized into three key areas: Trees and Landscaping, Electric Fleet Vehicle purchases and associated charging stations, and Energy Efficiency upgrades. Awardees include Centro CHA, Inc., Century Villages at Cabrillo, the Boys and Girls Club of Long Beach, Pacific Baptist Church, the City of Long Beach, First Congregational Church, Lutheran Social Services of Southern California, the California Aquatic Therapy and Wellness Center, and the Long Beach Unified School District. All projects are implemented at specific locations within Long Beach, though the official place of performance is listed as Los Angeles due to county alignment. The projects are designed to meet environmental goals through urban greening, electrification of transportation fleets, and infrastructure upgrades such as LED lighting and HVAC system improvements. All activities are supported by categorical exemptions under the California Environmental Quality Act (CEQA), specifically Classes 1 through 4, which cover existing facilities, replacement or reconstruction, new small structures, and minor land alterations, allowing expedited approval without full environmental review. No formal contract clauses from the Federal Acquisition Regulation were included in the documentation, and no detailed line-item pricing, delivery schedules, invoicing procedures, or payment details were specified. There are no stated inspection protocols, quality standards, or acceptance criteria beyond general compliance with federal, state, and local environmental regulations. The Port of Long Beach serves as the lead agency and contracting entity, with Renee Moilanen and Tyler Hanks designated as primary contacts for environmental planning, though their formal roles as COR, COTR, or PCO are not explicitly defined. No solicitation number, contract type, or formal evaluation criteria were provided, and the award process appears to have been guided by recommendations from the Community Grants Advisory Committee rather than a competitive procurement process. The total value represents a ceiling for all awards combined, with no breakdown of individual project funding levels, and no representations, certifications, or socioeconomic status details from awardees were included.
Landscaping Services

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS